• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo

Why The Beauty Indu... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Unit Of Cement Plant with Power Generation
Setup Unit Of Cement Plant with Power Generation

Cement is a crucial binding agent that is use... Read More

Capacity :
Cement Plant 40,000 Bags per Day
Plant and Machinery cost:
16500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
25200.00Lakhs
Add To Inquiry Basket
A Business Plan for Sterile Water for Injection
A Business Plan for Sterile Water for Injection

Sterile water refers to water that is completely free from any living organisms, such... Read More

Capacity :
Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day
Plant and Machinery cost:
572.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1234.00Lakhs
Add To Inquiry Basket
Setup Plant Of Lead From Galena
Setup Plant Of Lead From Galena

Lead is a heavy metal that is commonly found in the earth's crust. Its abundance, low... Read More

Capacity :
Lead Ingot 30 MT Per Day
Plant and Machinery cost:
487.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
2231.00Lakhs
Add To Inquiry Basket
A Business Plan Blood Collection Tubes, Urine and Stool Containers
A Business Plan Blood Collection Tubes, Urine and Stool Containers


Read More

Capacity :
-
Plant and Machinery cost:
1214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2294.00Lakhs
Add To Inquiry Basket
A Business Plan for Paracetamol
A Business Plan for Paracetamol

Paracetamol is a popular over-the-counter pain reliever and f... Read More

Capacity :
Paracetamol Powder 7 MT Per Day
Plant and Machinery cost:
274.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
779.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Of  Baby & Adult Diaper and Sanitary Napkins
Start Manufacturing Business Of Baby & Adult Diaper and Sanitary Napkins

Baby & Adult Diapers an... Read More

Capacity :
Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary
Plant and Machinery cost:
2356.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
4201.00Lakhs
Add To Inquiry Basket
Start Tissue Paper Manufacturing Business
Start Tissue Paper Manufacturing Business

Tissue paper is a lightweig... Read More

Capacity :
Tissue Paper 20 MT Per Day
Plant and Machinery cost:
497.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
2101.00Lakhs
Add To Inquiry Basket
Launching a  Solar Panel Production Business
Launching a Solar Panel Production Business

 

Solar panels are ... Read More

Capacity :
Solar Panel 500 MW per annum
Plant and Machinery cost:
810.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
5353.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business

Bagasse is the fibrous residue that remains after sugarcane o... Read More

Capacity :
-
Plant and Machinery cost:
1941.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2774.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Plant
Setup Curcumin Extraction Plant

Curcumin extraction refers to the process of isolating and ex... Read More

Capacity :
Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs
Plant and Machinery cost:
216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
491.00Lakhs
Add To Inquiry Basket
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit

 

Active Pharmaceut... Read More

Capacity :
Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs
Plant and Machinery cost:
1111.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
5246.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping  and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

 

The disassembly o... Read More

Capacity :
1000 Vehicles per Month
Plant and Machinery cost:
497.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2090.00Lakhs
Add To Inquiry Basket
Start an Assembling unit of Electric Vehicle Lithium Ion Batteries (Battery Assembly)
Start an Assembling unit of Electric Vehicle Lithium Ion Batteries (Battery Assembly)

The electronic devices we use every day can be powered by one of the most common batte... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Recycling of Lithium Ion Battery Business
Recycling of Lithium Ion Battery Business

 

Because of the popularity of smart phones and ... Read More

Capacity :
Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L
Plant and Machinery cost:
200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
422.00Lakhs
Add To Inquiry Basket
Set up Lithium Ion Battery Production Business Investment Opportunity in Battery Industry
Set up Lithium Ion Battery Production Business Investment Opportunity in Battery Industry

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Automated Vehicle Scrapping and Recycling Unit Business
Start Automated Vehicle Scrapping and Recycling Unit Business

Vehicles that are no longer... Read More

Capacity :
Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St
Plant and Machinery cost:
1000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
5100.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery Recycling Detailed Project report on How to Start Battery Recycling Business
Lithium Ion Battery Recycling Detailed Project report on How to Start Battery Recycling Business

 

A lithium ion battery i... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery LiFePO4 Production Business
Lithium Ion Battery LiFePO4 Production Business

A lithium-ion cell, sometim... Read More

Capacity :
Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day
Plant and Machinery cost:
289.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
970.00Lakhs
Add To Inquiry Basket
Flat Glass Manufacturing Business
Flat Glass Manufacturing Business

 

Glass has a microscopic structure similar to that of a liquid, where the various components come together to... Read More

Capacity :
4000 Sq.Mtrs. per day
Plant and Machinery cost:
14000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
18700.00Lakhs
Add To Inquiry Basket
Start Production Business of Rubber Granules from Waste Tyre
Start Production Business of Rubber Granules from Waste Tyre

Rubber is a polymer of butadiene and one of the most significant chemical components. It is utilised extensively in a ... Read More

Capacity :
Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day
Plant and Machinery cost:
6000000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
20700000.00Lakhs
Add To Inquiry Basket
Manufacturing of Aluminium Ingots from Aluminium Scrap
Manufacturing of Aluminium Ingots from Aluminium Scrap

Compared to blooms, billets, and slabs, aluminium ingots are very large casting products both in size and shape. Altho... Read More

Capacity :
Aluminium Alloy Ingots 12 MT per day Aluminium Scrap 0.20 MT per day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Nicotine Sulphate from Tobacco Leaves Production Business
Nicotine Sulphate from Tobacco Leaves Production Business

With human assistance, tobacco is grown, with the leaf being the most valuable component of the plant. Although tobacc... Read More

Capacity :
Nicotine Sulphate 3.6 MT per Day Waste Tobacco 28.3 MT per Day
Plant and Machinery cost:
16100000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
141600000.00Lakhs
Add To Inquiry Basket
Natural Tanning Powder  Production Business
Natural Tanning Powder Production Business

 

Comparatively speaking to other methods of tanning, natural tanning is now the most conventional, classic, a... Read More

Capacity :
600 MT per Annum
Plant and Machinery cost:
3700000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
27000000.00Lakhs
Add To Inquiry Basket
You Should Read SYour Own Industry in Booming Sectors
You Should Read SYour Own Industry in Booming Sectors

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set Up Automated Vehicle Scrapping Unit
Set Up Automated Vehicle Scrapping Unit

 

Vehicle scrapping units, also called scrapyards, are now playing an important r... Read More

Capacity :
0
Plant and Machinery cost:
325.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
1455.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plan For ZINC INGOTS
Manufacturing Business Plan For ZINC INGOTS

 

Zinc ingot is a white or gray color pure zinc metal, which is cast into a block... Read More

Capacity :
Zinc Ingots (Purity 98%) 6 MT Per Day
Plant and Machinery cost:
124.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
863.00Lakhs
Add To Inquiry Basket
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles

 

Introduct... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant – Business Plan
Plastic Waste Recycling Plant – Business Plan

 

Waste is now a global problem, and one that must be addressed in order to so... Read More

Capacity :
Recycled PP Granules : 578 Kgs / Day Recycled LDPE Granules: 720 Kgs / Day Recycled HDPE Granules: 7
Plant and Machinery cost:
144.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
380.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)

Active pharmaceutical ingredients are the active substances that are utilized in the manufacture of a drug and have a ... Read More

Capacity :
Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500
Plant and Machinery cost:
155.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
729.00Lakhs
Add To Inquiry Basket
Gold and Diamond Jewellery
Gold and Diamond Jewellery

Jewellery may be made from a wide range of materials. Gemstones and similar materials such as amber and coral, p... Read More

Capacity :
Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
2504.00Lakhs
Add To Inquiry Basket
Production of Biodegradable plastic Products. Bioplastic Products Manufacturing Business
Production of Biodegradable plastic Products. Bioplastic Products Manufacturing Business

Production of Biodegradable plastic Products. Bioplastic Products Manufacturing Business.  Biodegrad... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a descriptio... Read More

Capacity :
Aluminium : 3 MT / day Mild Steel: 2 MT / day Shredded PCB: 15.00 MT / day
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
533.00Lakhs
Add To Inquiry Basket
Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste
Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste

Bauxite waste (Red Mud) of Indian origin contains around 55% plus of Fe2O3 and is considered as a hazardous waste mate... Read More

Capacity :
Ferric Oxide (Fe2O3): 27,000 MT per Annum Titanium Dioxide (TiO2): 9,000 MT per Annum Remains Mate
Plant and Machinery cost:
408.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
1741.00Lakhs
Add To Inquiry Basket
Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Products.
Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Products.

Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Produc... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Gold Salt
Gold Salt

Gold salts are ionic chemical compounds of gold. The term, "gold salts" is a misnomer, and is ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Detergent Cake and Detergent Powder Manufacturing Industry
Detergent Cake and Detergent Powder Manufacturing Industry

Detergent Cake and Detergent Powder Manufacturing Industry. Start a Washing Powder an... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Alumina from Bauxite
Alumina from Bauxite

Alumina from Bauxite. Extraction and Production of Alumina from Bauxite

<...
Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates Using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates Using Sugarcane Bagasse

Sugarcane bagasse products are perfect solution for biodegradable food packaging which are environment friendly. These... Read More

Capacity :
2800 Kgs/Day
Plant and Machinery cost:
940.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
1369.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic waste may be defined as discarded computers, mobile phones, office electronic equipment’s, entertainm... Read More

Capacity :
Plastic Granules: 4, 00,000 Kgs per annum Glass Scrap:3, 00,000 Kgs per annum Copper Scrap: 2, 50,0
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
829.00Lakhs
Add To Inquiry Basket
Bioplastic Carry Bags and Garbage Bags Production
Bioplastic Carry Bags and Garbage Bags Production

Bioplastic Carry Bags and Garbage Bags Production. Biodegradable, Compostable and Eco... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bioplastic Carry Bags and Garbage Bags
Bioplastic Carry Bags and Garbage Bags

BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and... Read More

Capacity :
Bioplastic Carry Bags (8"x16") Size : 3500 Kgs/Day Bioplastic Garbage Bags (950x810 mm) Size : 15
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
396.00Lakhs
Add To Inquiry Basket
Filter (for All Vehicles)
Filter (for All Vehicles)

Filters containing an absorbent or catalyst such as charcoal (carbon) may also remove odors and gaseous pollutants such as volatile organic compoun... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Medical Disposables
Manufacturing Business of Medical Disposables

Manufacturing Business of Medical Disposables. IV Cannula. Cannula Manufacturing System

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Gold and Silver Jewellery
Gold and Silver Jewellery

Gold is more than a precious metal in Indian culture and is truly entrenched in their belief system. Over centuries and millennia, gold has become ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Bioplastic Products
Production of Bioplastic Products

Production of Bioplastic Products. Biodegradable and Bio-Plastics Products Manufacturing Business. Glasse... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant
Plastic Waste Recycling Plant

Plastics are made... Read More

Capacity :
Plastic Granules : 2400 Kgs/Day PET Granules : 2400 Kgs/Day
Plant and Machinery cost:
97.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
238.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded... Read More

Capacity :
Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annu
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
51800000.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power ... Read More

Capacity :
Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
1674.00 Lakhs
Cost of Project :
1674.00Lakhs
Add To Inquiry Basket
Biomedical Waste Recycling
Biomedical Waste Recycling

Biomedical waste is waste that is either putrescible or potentially infectious. Biomedical waste may also include waste associated with the generat... Read More

Capacity :
Plastic Granules 3 MT/Day •Recycled Paper 3 MT/Day •Recycled Glass 1 MT/Day •Recycled Metal 0.50 MT/
Plant and Machinery cost:
214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.65%
Break Even Point (BEP):
52.47 %
TCI :
1182.00 Lakhs
Cost of Project :
1182.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity :
Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
622.00 Lakhs
Cost of Project :
622.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity :
210 Lakhs Nos. /annum
Plant and Machinery cost:
719.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
56.00 %
TCI :
1736.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
Calcined Bauxite through Rotary Kiln
Calcined Bauxite through Rotary Kiln
Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Smaller volumes are consumed in other applications in... Read More
Capacity :
100 MT/Day
Plant and Machinery cost:
825.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
49.00 %
TCI :
1352.00 Lakhs
Cost of Project :
1352.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition o... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.91%
Break Even Point (BEP):
49.81 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Setup Plant of Freon Gases for Refrigeration
Setup Plant of Freon Gases for Refrigeration

 

Freon gases, ofte... Read More

Capacity :
-
Plant and Machinery cost:
1064.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
3229.00Lakhs
Add To Inquiry Basket
Start Business of Surgical Cotton and Cotton Balls
Start Business of Surgical Cotton and Cotton Balls

 

Surgical cotton, ... Read More

Capacity :
Surgical Cotton 10,500 Kgs Per Day Cotton Balls 4,500 Kgs Per Day
Plant and Machinery cost:
1100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2600.00Lakhs
Add To Inquiry Basket
Invest In Mink Blankets Production
Invest In Mink Blankets Production

 

Mink blankets, de... Read More

Capacity :
-
Plant and Machinery cost:
2700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
6000.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Diamond Blade 20000 Nos./Day 42.90 143.00
Packaged Drinking Water w... 40.00 350.00
ELECTROLYTIC MANGANESE DI... Electrolytic Manganese Dioxide 5 MT Per Day 27.00 576.00
E Waste Recycling Plant 5 MT/Day 15.00 241.00
Curcumin(Turmeric) The In... 23400 Kg/Annum, Curcumin 23400 kg/Annum, Turmeric oil 550 MT/ Annum, De-oiled turmeric powder 54.00 289.00
E-WASTE RECYCLING PLANT - 47.00 196.00
Growing Prospects for Pac... 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day 44.00 282.00
Alumina from Bauxite (By ... 66.66 MT/Day 46.00 2112.00
MEDICAL DISPOSABLES: Disp... 0 43.00 426.00
Bicycle Tyres 4000 Nos./Day 59.50 163.00
Wooden Furniture 20 Pcs/Day 111.00 13.00
Wooden Furniture (With Me... 20 Articles/Day 42.81 73.00
Paper Napkins 400 Kgs./ Day 43.88 0.00
Aluminium From Bauxite of... 20000 MT/Annum 17.00 1875.00
Setup Plant of Super Abso... Super Absorbent Polymer 8,000 MT Per Annum 28.00 2100.00
Setup Business of Nano Re... Nano Resin Modified Bulk Composite 2,000 Pcs Per Day 35.00 96.00
Setting up Glass Fiber Re... Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm) 6 MT Per Day 27.00 549.00
A Business Plan for Urea ... Urea Fertilizer 100 MT Per Day 26.00 3300.00
Start Production of Ferro... Ferrotitanium 70 2,500,000 Kgs Per Annum Ferrotitanium 40 2,500,000 Kgs Per Annum 27.00 1600.00
Start Production of Biode... Biodegradable and Edibile Tableware Products (Plate, Bowl & Cups) 72,000 Pcs Per Day 31.00 583.00
Start Business of Sorbito... Sorbitol 6 MT Per Day 28.00 790.00
A Business Plan For Sodiu... 5,000 MT Per Annum 27.00 808.00
Setup Your Own Production... 0 0.00 0.00
Demanding Business of E-R... 200 Nos per day 30.00 2580.00
Detailed Project Report o... Plastic: 1.60 MT per day Ferrous Material: 1.00 MT per day, Aluminium: 0.70 MT per day, Glass: 1.00 27.00 314.00
A Complete Business Plan ... 150 Nos per day 27.00 708.00
Manufacturing Business Of... Blood Bags 10,000 Nos per day 30.00 1092.00
A Business Plan For Nicot... Nicotine 100ml bottle each 3,500 Bottles per day 32.00 1662.00
65 Good Profitable Ideas ... 0 0.00 0.00
A Business Plan Nonwoven ... Nonwoven Fabric 400,000 Sq.mtrs. per day 28.00 2297.00
12345678910...

Showing 421 - 480 of 562 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR