• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Start Pharmaceutical Unit (Paracetamol Tablets)
Start Pharmaceutical Unit (Paracetamol Tablets)

Paracetamol, also known as acetaminophen in the United States and Canada, is a widely... Read More

Capacity :
Paracetamol Tablets (500mg) 25,000 No. of Strips Per Day
Plant and Machinery cost:
37.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
213.00Lakhs
Add To Inquiry Basket
Setup Cenosphere Processing Plant from Fly Ash
Setup Cenosphere Processing Plant from Fly Ash

Cenosphere processin... Read More

Capacity :
Cenosphere 5,000 MT Per Annum
Plant and Machinery cost:
179.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
629.00Lakhs
Add To Inquiry Basket
Start Production Of Instant Tea and Coffee
Start Production Of Instant Tea and Coffee

Instant Tea and Coffee: A Brewing Success Story Dive into the world of instant beverages with our consultancy servic... Read More

Capacity :
Black Instant Masala Tea 800 Packs Per Day Green Instant Tea 800 Packs Per Day Regular Instant Coffe
Plant and Machinery cost:
143.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
530.00Lakhs
Add To Inquiry Basket
Lucrative Business of Lithium Ion Battery Opportunities in Li-ion Battery Assembling Plant
Lucrative Business of Lithium Ion Battery Opportunities in Li-ion Battery Assembling Plant

 

A lithium-ion (Li... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Medical Disposables Gowns and Drapes
Start Manufacturing of Medical Disposables Gowns and Drapes

 

Surgical gowns ar... Read More

Capacity :
Medical Gowns 1,250 Pcs Per Day Medical Drapes 1,250 Pcs Per Day
Plant and Machinery cost:
286.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
611.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business

Metformin (also known as Gl... Read More

Capacity :
Metformin 2,000 Kgs. Per Day Ciprofloxacin 1,000 Kgs. Per Day
Plant and Machinery cost:
104.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
584.00Lakhs
Add To Inquiry Basket
Profitable Business of Lithium Ion Battery Pack
Profitable Business of Lithium Ion Battery Pack

In a lithium ion (li-ion) b... Read More

Capacity :
Lithium Ion Battery Module Cap. 0.4 KWH 595.2 Module per day Lithium Ion Battery Module Cap. 4.8 K
Plant and Machinery cost:
3600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
5000.00Lakhs
Add To Inquiry Basket
Investment opportunity in manufacturing of Lithium Ion (LiFePO4) Cell
Investment opportunity in manufacturing of Lithium Ion (LiFePO4) Cell

 

The Lithium Iron Phosphate Battery (LiFePO4 battery) or LFP Battery (lithium ferrophosphate) is a lithium-io... Read More

Capacity :
25000 Nos/day
Plant and Machinery cost:
3618.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
4626.00Lakhs
Add To Inquiry Basket
Business opportunities in Packaged Drinking Water with PET Bottle
Business opportunities in Packaged Drinking Water with PET Bottle

 

When humans are th... Read More

Capacity :
Packaged Drinking Water 200 ml Size Bottle: 28,800 Bottles per Day Packaged Drinking Water 500 ml Si
Plant and Machinery cost:
306.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
632.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

Automated Vehicle Scrapping and Recycling Unit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of 7-Aminocephalosporanic Acid (7-ACA) – Active Pharma Ingredient
Production of 7-Aminocephalosporanic Acid (7-ACA) – Active Pharma Ingredient

Cephalosporin’s a large group of β-lactam antibiotics, contain a 7-aminocephalosporanic acid (7-ACA) nucleu... Read More

Capacity :
7-Aminocephalosporanic Acid: 2 MT / Day
Plant and Machinery cost:
1791.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
3419.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Medical Disposables
Manufacturing Business of Medical Disposables

Manufacturing Business of Medical Disposables. IV Cannula. Cannula Manufacturing System

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Gold and Silver Jewellery
Gold and Silver Jewellery

Gold is more than a precious metal in Indian culture and is truly entrenched in their belief system. Over centuries and millennia, gold has become ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Bioplastic Products
Production of Bioplastic Products

Production of Bioplastic Products. Biodegradable and Bio-Plastics Products Manufacturing Business. Glasse... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes (2ml, 5ml, 10ml and 50ml)
Disposable Plastic Syringes (2ml, 5ml, 10ml and 50ml)

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their ... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 350 Boxes/day Disposable Plastic Syringes 5 ml Size : 350 Bo
Plant and Machinery cost:
151.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
343.00Lakhs
Add To Inquiry Basket
Discontinuous Sandwich Panel
Discontinuous Sandwich Panel

A sandwich panel is any structure made of three layers: a low-density core and a thin skin-layer bonded to each side. Sandw... Read More

Capacity :
1000000 Sq.mt. /Annum
Plant and Machinery cost:
7081.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
8431.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded... Read More

Capacity :
Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annu
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
51800000.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power ... Read More

Capacity :
Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
1674.00 Lakhs
Cost of Project :
1674.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plas... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size
Plant and Machinery cost:
802.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
44.00 %
TCI :
1474.00 Lakhs
Cost of Project :
1474.00Lakhs
Add To Inquiry Basket
Quartz Slabs
Quartz Slabs

Engineered stone is a composite material made of crushed stone bound together by an adhesive, (most commonly polymer resin, with some newer version... Read More

Capacity :
Quartz Slabs (760 x 2440 x 15 mm):60 Nos/Day
Plant and Machinery cost:
101.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.58%
Break Even Point (BEP):
51.79 %
TCI :
350.00 Lakhs
Cost of Project :
350.00Lakhs
Add To Inquiry Basket
Biomedical Waste Recycling
Biomedical Waste Recycling

Biomedical waste is waste that is either putrescible or potentially infectious. Biomedical waste may also include waste associated with the generat... Read More

Capacity :
Plastic Granules 3 MT/Day •Recycled Paper 3 MT/Day •Recycled Glass 1 MT/Day •Recycled Metal 0.50 MT/
Plant and Machinery cost:
214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.65%
Break Even Point (BEP):
52.47 %
TCI :
1182.00 Lakhs
Cost of Project :
1182.00Lakhs
Add To Inquiry Basket
Aluminium Beverage Cans
Aluminium Beverage Cans

The aluminium beverage can is now the popular choice for carbonated and still soft drinks, mineral waters, beers and lagers. It competes successful... Read More

Capacity :
Aluminium Beverage Cans : 1,000 thousand Nos/Day
Plant and Machinery cost:
1663.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
46.00 %
TCI :
2957.00 Lakhs
Cost of Project :
2957.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity :
Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
622.00 Lakhs
Cost of Project :
622.00Lakhs
Add To Inquiry Basket
Granite Mining (E O U)
Granite Mining (E O U)

Granite is a common type of felsic intrusive igneous rock which is granular and phaneritic in texture. These rocks mainly consist of feldspar, quar... Read More

Capacity :
Granite: 20 Cu.mt/Day
Plant and Machinery cost:
695.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
48.00 %
TCI :
1842.00 Lakhs
Cost of Project :
1842.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition o... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.91%
Break Even Point (BEP):
49.81 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles
Disposable Plastic Syringes with Needles

Disposable Syringes made of plastic ... Read More

Capacity :
Syringes (1 ml) :14,000.0 Nos./Day.,Syringes (3 ml):14,000.0 Nos./Day.,Syringes (5 ml):14,000.0 Nos.
Plant and Machinery cost:
174.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
40.00 %
TCI :
515.00 Lakhs
Cost of Project :
515.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity :
210 Lakhs Nos. /annum
Plant and Machinery cost:
719.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
56.00 %
TCI :
1736.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
E Waste Recycling Plant
E Waste Recycling Plant

E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, a... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.00%
Break Even Point (BEP):
43.00 %
TCI :
241.00 Lakhs
Cost of Project :
241.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Calcined Bauxite through Rotary Kiln
Calcined Bauxite through Rotary Kiln
Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Smaller volumes are consumed in other applications in... Read More
Capacity :
100 MT/Day
Plant and Machinery cost:
825.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
49.00 %
TCI :
1352.00 Lakhs
Cost of Project :
1352.00Lakhs
Add To Inquiry Basket
Curcumin(Turmeric) The Indian solid gold
Curcumin(Turmeric) The Indian solid gold

PRODUCT PROFILE Curcumin is the principal curcuminoid of the popular Indian spice turmeric, which is a member of the ginger family. It is the main ... Read More

Capacity :
23400 Kg/Annum, Curcumin 23400 kg/Annum, Turmeric oil 550 MT/ Annum, De-oiled turmeric powder
Plant and Machinery cost:
122.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
51.00 %
TCI :
289.00 Lakhs
Cost of Project :
289.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with PET Bottles
Packaged Drinking Water with PET Bottles
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b... Read More
Capacity :
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
58.00 %
TCI :
350.00 Lakhs
Cost of Project :
350.00Lakhs
Add To Inquiry Basket
FLY ASH BRICKS FROM LIMESTONE
FLY ASH BRICKS FROM LIMESTONE

Fly Ash bricks are alternative to burnt clay bricks in the construction sector in India. Fly ash bricks are an environment friendly cost saving bui... Read More

Capacity :
12000000 Nos./Annum
Plant and Machinery cost:
80.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
40.00 %
TCI :
409.00 Lakhs
Cost of Project :
409.00Lakhs
Add To Inquiry Basket
E-WASTE RECYCLING PLANT
E-WASTE RECYCLING PLANT

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
-
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES WITH NEEDLES
DISPOSABLE PLASTIC SYRINGES WITH NEEDLES

Disposable syringes are a great inno... Read More

Capacity :
120 Lakhs/ Annum
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
253.00 Lakhs
Cost of Project :
253.00Lakhs
Add To Inquiry Basket
GLUCOSE SALINE
GLUCOSE SALINE

Dextrose is a carbohydrate caloric agent. Glucose, also known as dextrose, is a simple sugar that can be found in nature and are chemically identic... Read More

Capacity :
3600 Thousand Bottles Each Bottles 500 ml/Annum
Plant and Machinery cost:
66.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
59.00 %
TCI :
153.00 Lakhs
Cost of Project :
153.00Lakhs
Add To Inquiry Basket
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask

Disposable needle is widely used by ... Read More

Capacity :
0
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
47.00 %
TCI :
426.00 Lakhs
Cost of Project :
426.00Lakhs
Add To Inquiry Basket
Sodium Silicate (Soda Ash and Silica sand)
Sodium Silicate (Soda Ash and Silica sand)

-

Read More
Capacity :
15 MT/Day
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
58.00%
Break Even Point (BEP):
44.00 %
TCI :
120.00 Lakhs
Cost of Project :
120.00Lakhs
Add To Inquiry Basket
Growing Prospects for Packaged Drinking Water Industry
Growing Prospects for Packaged Drinking Water Industry

Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a... Read More

Capacity :
30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
63.00 %
TCI :
282.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
Rectified Spirit & Extra Neutral Alcohol (ENA)
Rectified Spirit & Extra Neutral Alcohol (ENA)

A rectified spirit or rectified alcohol is highly concentrated ethanol (drinking alcohol) which has been purified by means of rectification (repeat... Read More

Capacity :
13000 Kls Rectified Spirit / Annum, 7500 Thousand No. Bottles / Annum (Capacity 375 ml.)
Plant and Machinery cost:
1381.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
56.00 %
TCI :
2422.00 Lakhs
Cost of Project :
2422.00Lakhs
Add To Inquiry Basket
Alumina from Bauxite (By Calcination Process)
Alumina from Bauxite (By Calcination Process)

-

Read More
Capacity :
66.66 MT/Day
Plant and Machinery cost:
671.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
2112.00 Lakhs
Cost of Project :
2112.00Lakhs
Add To Inquiry Basket
FERROALLOYS OF NIOBIUM, MOLYBDENUM, TITANIUM, TUNGSTEN AND VANADIUM
FERROALLOYS OF NIOBIUM, MOLYBDENUM, TITANIUM, TUNGSTEN AND VANADIUM

Ferroalloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
50.00%
Break Even Point (BEP):
41.00 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Marble Granite Cutting & Polishing Unit
Marble Granite Cutting & Polishing Unit

It is an important structural & ornamental stone because of its higher compressive strength & durability, is extensively used for massive s... Read More

Capacity :
30000 Sq. Mtr./Annum
Plant and Machinery cost:
196.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
78.00 %
TCI :
293.00 Lakhs
Cost of Project :
293.00Lakhs
Add To Inquiry Basket
Paper Napkins
Paper Napkins

Tissue paper is often used for wrapping as in jewellery, liquors, fruits and florist trades etc. Napkins are manufactured from tissues. Paper napki... Read More

Capacity :
400 Kgs./ Day
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.88%
Break Even Point (BEP):
47.25 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Paper Plates with Silver Lamination
Paper Plates with Silver Lamination

Paper crockery such as paper cups, saucers, napkins, and paper plates has extensive usage these days for serving food in parties, functions and soc... Read More

Capacity :
20000 Nos/Day
Plant and Machinery cost:
11.00 Lakhs
Working Capital :
13.00
Rate of Return (ROR):
35.18%
Break Even Point (BEP):
57.56 %
TCI :
36.00 Lakhs
Cost of Project :
36.00Lakhs
Add To Inquiry Basket
Bicycle Tyres
Bicycle Tyres

Bicycle tyre is the backbone of the cycle industries. There are few numbers of organized manufacturing companies are engaged in the quality grade c... Read More

Capacity :
4000 Nos./Day
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
57.00
Rate of Return (ROR):
59.50%
Break Even Point (BEP):
38.47 %
TCI :
163.00 Lakhs
Cost of Project :
163.00Lakhs
Add To Inquiry Basket
Wooden Furniture
Wooden Furniture

The furniture making is an ancient art in India before centuries. The expertise of India in manufacturing furniture was accepted by all the parts o... Read More

Capacity :
20 Pcs/Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
5.00
Rate of Return (ROR):
111.00%
Break Even Point (BEP):
26.99 %
TCI :
13.00 Lakhs
Cost of Project :
13.00Lakhs
Add To Inquiry Basket
Wooden Furniture (With Mediocre Automation)
Wooden Furniture (With Mediocre Automation)

The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chai... Read More

Capacity :
20 Articles/Day
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
28.00
Rate of Return (ROR):
42.81%
Break Even Point (BEP):
48.28 %
TCI :
73.00 Lakhs
Cost of Project :
73.00Lakhs
Add To Inquiry Basket
Granite Tiles, Slab and Monuments
Granite Tiles, Slab and Monuments

Granite Slab and Tiles are mainly used for wall paneling and facades. Today in Europe and in Western Countries and in India, architect and builders... Read More

Capacity :
1000.00 Tiles/Day & 100 Monument/Day, 5 Slab/Day
Plant and Machinery cost:
182.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
45.00 %
TCI :
488.00 Lakhs
Cost of Project :
488.00Lakhs
Add To Inquiry Basket
Aluminium From Bauxite of Gibbsite Variety
Aluminium From Bauxite of Gibbsite Variety

Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Ot... Read More

Capacity :
20000 MT/Annum
Plant and Machinery cost:
615.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
17.00%
Break Even Point (BEP):
54.00 %
TCI :
1875.00 Lakhs
Cost of Project :
1875.00Lakhs
Add To Inquiry Basket
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Ready Mix Plaster,  Block Jointer, Tile Adhesive  and M 20 Concrete (Micro Concrete)
Business Plan for Production of Ready Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Ready Mix Plaster is a mixture of cement paste... Read More

Capacity :
0
Plant and Machinery cost:
294.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1342.00Lakhs
Add To Inquiry Basket
Start Phosphate Rich Organic Manure (PROM) Production Business
Start Phosphate Rich Organic Manure (PROM) Production Business

 

Phosphate rice or... Read More

Capacity :
Phosphate Rich Organic Manure (PROM) 28,800 MT Per Annum
Plant and Machinery cost:
182.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
78.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business

Stainless steel cold rolled... Read More

Capacity :
0
Plant and Machinery cost:
2863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
9293.00Lakhs
Add To Inquiry Basket
Setting up  Hemodialysis Blood Tubing  Business
Setting up Hemodialysis Blood Tubing Business

The introduction of hemodia... Read More

Capacity :
Homodialysis Blood Tubing Set 1,200,000 Pcs Per Annum
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
344.00Lakhs
Add To Inquiry Basket
Start Protein Based Nutrition Foods Production
Start Protein Based Nutrition Foods Production

 

Protein-based nut... Read More

Capacity :
Protein Based Nutrition Foods 1,200,000 Nos Per Annum (500 gms)
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
437.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash by Solvay process
A Business Plan for Soda Ash by Solvay process

 

Soda ash, also known as sodium carbonate, is a chemical compound produced when a base and an ac... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl):200,000 MT Per Annum
Plant and Machinery cost:
14300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
21000.00Lakhs
Add To Inquiry Basket
Floral Foam (Phenolic Foam) with Resin Manufacturing Business
Floral Foam (Phenolic Foam) with Resin Manufacturing Business

 

Floral foam, also known as phenolic foam, is a lightweight, highly porous foam material used to hold and hyd... Read More

Capacity :
Floral Foam (Phenolic Foam): 90,000 Kg. Per Annum
Plant and Machinery cost:
84.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
366.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
A Business Plan for Ferri... Ferric Pyrophosphate 600 MT Per Annum 31.00 133.00
How to Start A Business o... 0 0.00 0.00
A Business Plan for Seawo... Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum 28.00 2040.00
Setup Extraction of Salt ... Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum 29.00 2776.00
A business Plan For Surgi... Surgical Sutures: 450,000 Boxes per annum 27.00 877.00
Starting up production of... Glycerol Monostearate: 900 MT Per Annum 29.00 320.00
Startup A Business of Dou... 0 0.00 0.00
Now Is The Time To Take C... 0 0.00 0.00
Start Production of Potat... Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum 30.00 121.00
Setup Cashew Nut Processi... Cashew Nut Processing: 4,794 Kgs Per Day 23.00 1100.00
Start a Business of Parti... Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum 30.00 1100.00
A Business Plan for Wood ... Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum 27.00 790.00
Start a Production Of Sod... Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum 14.00 1265.00
12345678910...

Showing 241 - 300 of 650 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR