• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
An Investment Opportunity in Lithium Ion Battery (LiFePO4) Manufacturing Plant
An Investment Opportunity in Lithium Ion Battery (LiFePO4) Manufacturing Plant

A lithium iron phosphate (L... Read More

Capacity :
Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler:26 Nos. Per
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
1028.00Lakhs
Add To Inquiry Basket
Solar Panel Manufacturing Business (both type of the PV Cells: Polycrystalline and Monocrystalline)
Solar Panel Manufacturing Business (both type of the PV Cells: Polycrystalline and Monocrystalline)

A Solar panel consists of a number of solar modules, which are connected in series an... Read More

Capacity :
Mono Crystalline Solar PV Module Capacity: 250 Watt 466.8 Nos. Per Day Mono Crystalline Solar PV Mod
Plant and Machinery cost:
3635.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
6346.00Lakhs
Add To Inquiry Basket
A Complete Business Plan of Solar Panel Including both type of the PV Cells Polycrystalline and Monocrystalline
A Complete Business Plan of Solar Panel Including both type of the PV Cells Polycrystalline and Monocrystalline

Introduction... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for FREEZE DRIED FRUIT and VEGETABLES Dry Banana Mango Custard Apple Beetroot Sapota Dragon Fruit Jamun and Green Peas
A Business Plan for FREEZE DRIED FRUIT and VEGETABLES Dry Banana Mango Custard Apple Beetroot Sapota Dragon Fruit Jamun and Green Peas

In the sublimation process of freeze-drying, sometimes referr... Read More

Capacity :
0
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
200.00Lakhs
Add To Inquiry Basket
Set Up Milk Processing Automatic Plant (Milk and Milk Powder)
Set Up Milk Processing Automatic Plant (Milk and Milk Powder)

A dairy product made from cow milk is powdered milk. Essentially, cow's milk is composed of water, lipids, protein, su... Read More

Capacity :
Pasteurised Milk 10,000 Units per Day Skimmed Milk Powder 10,000 Units per Day Raw Cream by Product
Plant and Machinery cost:
4900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
6300.00Lakhs
Add To Inquiry Basket
Setting Up Medical College  With Hospital
Setting Up Medical College With Hospital

A hospital is an institution that provides preventive, curative/ameliorative, palliative, or rehabilitative services i... Read More

Capacity :
100 Students, 500 bedded Hospital
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
12300.00Lakhs
Add To Inquiry Basket
Start Ferrosilicon Production Business
Start Ferrosilicon Production Business

Basically, ferrosilicon is a silica and iron alloy that comprises somewhere between 15% and 90% silicon. A "heat-blocker" c... Read More

Capacity :
26.7 MT per day
Plant and Machinery cost:
1900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
3900.00Lakhs
Add To Inquiry Basket
Business Plan- Disposable Plastic Syringes
Business Plan- Disposable Plastic Syringes

A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindri... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size: 700 Boxes / Day (Each Box = 100 Pcs) Disposable Plastic Syrin
Plant and Machinery cost:
420.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
981.00Lakhs
Add To Inquiry Basket
Start Assembling of Lithium Ion Battery (Battery Assembly)
Start Assembling of Lithium Ion Battery (Battery Assembly)

 

A lithium-ion bat... Read More

Capacity :
48 Volt, 60 AH Lithium-Ion Battery Pack 10 Nos per day 48 Volt, 80 AH Lithium-Ion Battery Pack 10 No
Plant and Machinery cost:
165.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
538.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)

 

The Active Pharmaceutical Ingredient (API) is the part of any drug that produce... Read More

Capacity :
Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1656.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

 

Active pharmaceutical ingredients are the active substances that are used in th... Read More

Capacity :
Paracetamol : 1,000.0 Kgs / day Azithromycin: 500.0 Kgs / day Amoxicillin Trihydrate: 500.0 Kg
Plant and Machinery cost:
175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1322.00Lakhs
Add To Inquiry Basket
Market Research Report on India Active Pharmaceutical Ingredient (API)
Market Research Report on India Active Pharmaceutical Ingredient (API)

Market Research Report on India Active Pharmaceutical Ingredient (API) Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar photovoltaic (PV) modules electrically conne... Read More

Capacity :
Solar Panel :83.3 KW / day
Plant and Machinery cost:
162.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
804.00Lakhs
Add To Inquiry Basket
Synthetic Soda Ash Production  from Limestone and Brine
Synthetic Soda Ash Production from Limestone and Brine

Soda ash is the trade name for sodium carbonate, a chemical refined from the mineral trona or sodium-carbonate-bearing... Read More

Capacity :
Synthetic Soda Ash :60.0 MT / day Calcium Chloride : 48.0 MT/ day
Plant and Machinery cost:
685.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
2093.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery
Lithium Ion Battery

Lithium-ion batteries are all about the movement of lithium ions: the ions move one way when the battery charges (when... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack:100,000 Nos per Annum
Plant and Machinery cost:
1017.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
4978.00Lakhs
Add To Inquiry Basket
Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste
Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste

Bauxite waste (Red Mud) of Indian origin contains around 55% plus of Fe2O3 and is considered as ... Read More

Capacity :
Ferric Oxide (Fe2O3): 27,000 MT per Annum Titanium Dioxide (TiO2): 9,000 MT per Annum Remains Mate
Plant and Machinery cost:
407.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
1741.00Lakhs
Add To Inquiry Basket
E-Waste Recycling for Extraction of Precious Metals
E-Waste Recycling for Extraction of Precious Metals

E-Waste Recycling for Extraction of Precious Metals (Nickel, Tin & Zinc), Gold, S... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

Plug-in hybrids (PHEVs) use an electric motor and battery that can be plugged into the power grid to charge the batter... Read More

Capacity :
15,000 Nos per Annum
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
279.00Lakhs
Add To Inquiry Basket
Bioplastic Carry Bags and Garbage Bags
Bioplastic Carry Bags and Garbage Bags

BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and... Read More

Capacity :
Bioplastic Carry Bags (8"x16") Size: 3,500 Kgs per day Bioplastic Garbage Bags (950x810 mm) Size
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
396.00Lakhs
Add To Inquiry Basket
Production of Bioplastic Film using Biodegradable Resin
Production of Bioplastic Film using Biodegradable Resin

Production of Bioplastic Film using Biodegradable Resin, PLA (Polylactic Acid). Biode... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
E-Rickshaw Assembling
E-Rickshaw Assembling

E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to c... Read More

Capacity :
4 Nos./Day
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
323.00Lakhs
Add To Inquiry Basket
Bicycle Tyre & Tubes Production from Natural Rubber
Bicycle Tyre & Tubes Production from Natural Rubber

Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Biomedical Waste Recycling Industry
Biomedical Waste Recycling Industry

Biomedical Waste Recycling Industry. Start a Medical or Hospital Waste Management Business Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bauxite Calcination Plant by Rotary Kiln with Fine Grinding Ball Mill
Bauxite Calcination Plant by Rotary Kiln with Fine Grinding Ball Mill

Bauxite Calcination Plant by Rotary Kiln with Fine Grinding Ball Mill. Refractory Gra... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Matchbox Manufacturing Business
Matchbox Manufacturing Business

Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matche... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bioplastic Film
Bioplastic Film

Biodegradable plastics are the type of plastics that undergo decomposition over a period of time under composting condition... Read More

Capacity :
Bioplastic Film 25 Micron : 5000Kgs/Day
Plant and Machinery cost:
184.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
616.00Lakhs
Add To Inquiry Basket
Bauxite Calcination (by Rotary Kiln with Fine Grinding Ball Mill)
Bauxite Calcination (by Rotary Kiln with Fine Grinding Ball Mill)

Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Bauxite is a naturally occurring, heterogeneous mat... Read More

Capacity :
40 MT/day
Plant and Machinery cost:
219.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
766.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Solar panel refers either to a photovoltaic module, a solar thermal ener... Read More

Capacity :
25 MW
Plant and Machinery cost:
161.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
804.00Lakhs
Add To Inquiry Basket
Wooden Furniture Manufacturing Industry
Wooden Furniture Manufacturing Industry

Wooden Furniture Manufacturing Industry. Furniture Production Factory. Most Profitable Wood Furniture Manufacturing Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bicycle and Cycle Rickshaw Manufacturing
Bicycle and Cycle Rickshaw Manufacturing

A Bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the ot... Read More

Capacity :
Bicycles (Different Sizes) : 1000 Nos. /Day Cycle Rickshaw : 1000 Nos. Day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
1525.00Lakhs
Add To Inquiry Basket
Medical Disposables (Gowns,Drapes)
Medical Disposables (Gowns,Drapes)

Medical Disposables (Gowns/Drapes)

Surgical gowns are worn by doctors and nurses ... Read More

Capacity :
Surgeon Gowns : 250 Pcs./Day Pateint Gowns : 250 Pcs./Day Bed Sheets : 300 Pcs./Day Pillow Co
Plant and Machinery cost:
204.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
492.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity :
Monitors : 5 Kgs /Day Plastic Granules : 2333.33 Kgs /Day Copper Wire Scraps : 13.33 Kgs /Day Gl
Plant and Machinery cost:
100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
325.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer
Micronutrients Fertilizer

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of th... Read More

Capacity :
Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegetabl
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
114.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be us... Read More

Capacity :
Solar Panel 5MW/Annum
Plant and Machinery cost:
109.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
62.00 %
TCI :
450.00 Lakhs
Cost of Project :
450.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity :
2164500 Kgs /Annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
526.00 Lakhs
Cost of Project :
526.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

A syringe is a simple piston pump co... Read More

Capacity :
Syringes (2 ml) : 90 Lakh Nos. /Annum,Syringes (5 ml) : 90 Lakh Nos. /Annum
Plant and Machinery cost:
245.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
46.00 %
TCI :
455.00 Lakhs
Cost of Project :
455.00Lakhs
Add To Inquiry Basket
E–WASTE RECYCLING PLANT
E–WASTE RECYCLING PLANT

E-waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers,... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
49.00 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

It is an instrument which is used fo... Read More

Capacity :
180 Lakh Nos. /annum
Plant and Machinery cost:
245.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
46.00 %
TCI :
455.00 Lakhs
Cost of Project :
455.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cy... Read More

Capacity :
4152 cum/Day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
58.00 %
TCI :
286.00 Lakhs
Cost of Project :
286.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

A syringe is a simple piston pump co... Read More

Capacity :
-
Plant and Machinery cost:
113.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
288.00 Lakhs
Cost of Project :
288.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

A syringe is a simple piston pump co... Read More

Capacity :
33600 NOS./Day
Plant and Machinery cost:
112.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
44.00 %
TCI :
287.00 Lakhs
Cost of Project :
287.00Lakhs
Add To Inquiry Basket
Disposable Plastic Cups, Plates & Glasses
Disposable Plastic Cups, Plates & Glasses

The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by t... Read More

Capacity :
1354 Lakh Pcs./annum
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.87%
Break Even Point (BEP):
45.83 %
TCI :
216.00 Lakhs
Cost of Project :
216.00Lakhs
Add To Inquiry Basket
CALCINED BAUXITE
CALCINED BAUXITE

Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Smaller volumes are consumed in other applications ... Read More

Capacity :
60,000 MT/Annum
Plant and Machinery cost:
438.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
63.00 %
TCI :
1214.00 Lakhs
Cost of Project :
1214.00Lakhs
Add To Inquiry Basket
Production of 7-Aminocephalosporanic Acid (7-ACA) – Active Pharma Ingredient
Production of 7-Aminocephalosporanic Acid (7-ACA) – Active Pharma Ingredient

Cephalosporin’s a large group of β-lactam antibiotics, contain a 7-aminocephalosporanic acid (7-ACA) nucleu... Read More

Capacity :
7-Aminocephalosporanic Acid: 2 MT / Day
Plant and Machinery cost:
1791.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
3419.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
48 Volt, 20 AH Lithium-Ion Battery Pack: 3498 Nos Per Day
Plant and Machinery cost:
5053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
7215.00Lakhs
Add To Inquiry Basket
Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste
Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste

Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Assaying Gold
Assaying Gold

Gold assaying is essential in determining the amount of gold in a mineral deposit. There are various gold assaying pro... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Alumina from Bauxite
Alumina from Bauxite

Alumina is properly called aluminium oxide, which is a chemical compound comprised of aluminium and oxygen molecules (... Read More

Capacity :
100000 MT/Annum
Plant and Machinery cost:
890.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
6009.00Lakhs
Add To Inquiry Basket
Plating on Plastics, Electroplating on Plastics, Silver & Gold Plating on PVC and Nylon - 6
Plating on Plastics, Electroplating on Plastics, Silver & Gold Plating on PVC and Nylon - 6

The Gold is a relatively scarce yellow metal. Often found in the native State, which is the most malleable of all meta... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Artificial Sand from Stones and Waste Metals
Artificial Sand from Stones and Waste Metals

Artificial sand term used for aggregate material less than 4.75mm and which are processed from crushed rocks or gravel... Read More

Capacity :
2400 MT/Day
Plant and Machinery cost:
325.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1191.00Lakhs
Add To Inquiry Basket
Granite Cutting and Polishing
Granite Cutting and Polishing

Granite is a light coloured indigenous granular rock, grey, red & pink, white or green in colour & characteris... Read More

Capacity :
Premium Granite: 97,200 SQM per annum Standard Granite 43,200 SQM per annum Commercial Granite:
Plant and Machinery cost:
878.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
2147.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

E-WASTE is a collective name for discarded electronic devices that enter the waste stream from various sources. It inc... Read More

Capacity :
Plastic Granules : 141000 Kgs./Annum Glass Scrap : 105900 Kgs./Annum Copper Scrap : 88200 Kgs./An
Plant and Machinery cost:
106.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
190.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer Manufacturing Industry
Micronutrients Fertilizer Manufacturing Industry

Micronutrients Fertilizer Manufacturing Industry. Production of Micronutrients Fertil... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Silver Nitrate
Silver Nitrate

Silver nitrate is an inorganic compound with chemical formula AgNO3. This compound is a versatile precursor to many ot... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles
Disposable Plastic Syringes with Needles

The hypodermic syringe, also known as the hypodermic needle, is a device used by medical professionals to transfer liq... Read More

Capacity :
Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack : 82000 Th. Nos
Plant and Machinery cost:
2410.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
17.00 %
TCI :
0.00 Lakhs
Cost of Project :
14240.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
12345678910...

Showing 541 - 600 of 650 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR