• 0

Project Consultancy, Reports & Profiles

Agro and Food Processing: Project Opportunities in Uttarakhand

PROFILE:

Food processing involves any type of value addition to agricultural or horticultural produce and also includes processes such as grading, sorting and packaging which enhance shelf life of food products. The food processing industry provides vital linkages and synergies between industry and agriculture. The Food Processing Industry sector in India is one of the largest in terms of production, consumption, export and growth prospects. The government has accorded it a high priority, with a number of fiscal reliefs and incentives, to encourage commercialization and value addition to agricultural produce, for minimizing pre/post harvest wastage, generating employment and export growth. India's food processing sector covers a wide range of products fruit and vegetables; meat and poultry; milk and milk products, alcoholic beverages, fisheries, plantation, grain processing and other consumer product groups like confectionery, chocolates and cocoa products, Soya-based products, mineral water, high protein foods etc.

RESOURCES:

Uttarakhand comprises of total are 5672568 Hectares, of which forest area is 3485847 hectares. Fruits such as apples, oranges, pear, grapes peach, plum apricot, litchi, mangoes and guava are widely grown in the state and therefore have immense potential for development of horticultural crops and processing units. The State Government will assist in establishing small & medium size Agro Parks, Food Parks etc., which will provide common infrastructure facilities for storage, processing, grading and marketing, thus ensuring that surplus fruits and vegetables do not go waste as at present. Four Agri Export Zones have already been declared under the AEZ scheme of the Government of India for Litchi, Horticulture, Herbs, Medicinal Plants and Basmati Rice. Further, efforts will continue to promote production for export and provide access to domestic and export markets for products from the State.

GOVERNMENT POLICIES:

The Ministry of Food Processing Industries (MOFPI) is a ministry of the Government of India is responsible for formulation and administration of the rules and regulations and laws relating to food processing in India. The ministry was set up in the year 1988, with a view to develop a strong and vibrant food processing industry, to create increased employment in rural sector and enable farmers to reap the benefits of modern technology and to create a of surplus for exports and stimulating demand for processed food.

•        Custom duty rates have been substantially reduced on food processing plant and equipments, as well as on raw materials and intermediates, especially for export production.

•        Wide-ranging fiscal policy changes have been introduced progressively in food processing sector. Excise and Import duty rates have been reduced substantially. Many processed food items are totally exempt from excise duty.

•        Corporate taxes have been reduced and there is a shift towards market related interest rates. There are tax incentives for new manufacturing units for certain years, except for industries like beer, wine, aerated water using flavouring concentrates, confectionery, chocolates etc.

•        Indian currency, rupee, is now fully convertible on current account and convertibility on capital account with unified exchange rate mechanism is foreseen in coming years.

•        Repatriation of profits is freely permitted in many industries except for some, where there is an additional requirement of balancing the dividend payments through export earnings.

 

Biotechnology: Project Opportunities in Uttarakhand

PROFILE

The Biotechnology sector in India is one of the fastest growing sectors of the Indian Economy. As the sector is mainly based on knowledge, it is expected that it will play an important part in shaping the Indian Economy, which is developing at a rapid pace. The Indian Biotechnology sector holds immense potential in terms of research and development, skill and cost effectiveness. As per the eight annual survey by the Association of Biotechnology-led enterprise (ABLE) and a monthly journal, Bio-Spectrum, the sector grew threefold in five years and reported a revenue of US$ 3 billion during 2009-2011 with a 17 per cent rise as compared to the previous year.

RESOURCES

Uttarakhand is an ideal destination to invest in biotechnology-based industries because of several inherent advantages and being host to vast diversity of flora and fauna and rare species of plants and animals. A high-level biotechnology board is being setup to pursue initiatives in the field of research. The state will accord the units coming under this sector with the industry status and aims to establish an internationally competitive business infrastructure and environment for the industry in the state. Further, a biotechnology park is to be developed that will integrate resources and provide a focused institutional set up for accelerated commercial growth of bio-technology and bio-informatics. The Government is also in the process of creating an Exchange for Medicinal and Aromatic Plants to serve as a common platform for research institutions, technology developers and producers.

GOVERNMENT POLICIES:

The Uttarakhand Board of Biotechnology (UBB) will help the R&D Institutions of the State to seek funds from the national and international funding agencies / donors to upgrade the infrastructure facilities. Depending upon the need, UBB and the State Government will also try to fund R&D facilities through its own resources. The State Government undertakes to provide the following facilities/terms to the companies desirous of establishing BT units in the State:

•        BT Units including related R&D Units will enjoy the status of industry and will be eligible for incentives and concessions as provided for the relevant category/class of industry in the Industrial Policy of the State. For this purpose they shall be treated as Priority Sector Industry. Department of Biotechnology will provide The State Government undertakes to provide the following facilities/terms to the companies “single-window clearance” and shall issue only one application form to set up BT Units in the State.

•        The Government proposes to establish in association with private sector a BT Park initially at Halide, Pantnagar where land/plots would be made available to prospective entrepreneurs on favourable terms. The latter, however, are also free to choose their own sites or locate the same in the other established Industrial Areas in the State.

Hydropower: Project Opportunities in Uttarakhand

PROFILES:

Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. India was the 7th largest producer of hydroelectric power in 2008 after Norway: 114 TWh and 3.5 % the world total in 2008. The potential for hydroelectric power in India is one of the greatest in the world. Small hydropower offers a wide range of benefits-especially for rural areas and developing countries. The resource is environmentally responsible and has substantial economic advantages. Efforts also being made to improve the exchange of ideas and technology related to small hydropower. In India, small hydropower up to capacity of 25 MW also includes the mini-and-micro hydropower projects which are usually confined strictly to local use. A potential of over 15,000 MW has been identified from small hydropower and Government of India has been according top priority to SHP development as thrust area.

RESOURCES:

Uttarakhand has a large network of rivers and canals which provides an immense scope for hydro-power energy. In India, the development of Micro, Mini, and Small Hydro Power Projects started in the year 1897. One of the first hydro-power stations in India was commissioned at Galogi in 1907. More power stations were subsequently developed over a period of time. In Uttarakhand, the estimated capacity of Small hydro power projects is about 1500 MW out of total estimated capacity of 20,363 MW Uttaranchal has a hydropower potential of the order of 20236 MW against which only about 1407 MW has been harnessed so far.

GOVERNMENT POLICIES:

The Government of Uttaranchal (GoU) has decided to encourage generation of power through small hydropower sources of energy, and has framed a policy so that the development of this sector serves as an engine to achieve the objective of promoting the all-round development of the region. To encourage generation of hydropower the government of Uttarakhand has formulated and implemented policies with following objectives:

•        Creation of conducive conditions for encouraging private sector participation

•        Harnessing water resources in an environment friendly manner

•        Meeting the energy demand of the state/country

•        Promotion of the overall development of the region

•        Generation of revenue from hydro resources

 

Mineral: Project Opportunities in Uttarakhand

PROFILES:

A mineral is a naturally occurring solid chemical substance formed through biogeochemical processes, having characteristic chemical composition, highly ordered atomic structure, and specific physical properties. India is endowed with significant mineral resources. India produces 89 minerals out of which 4 are fuel minerals, 11 metallic, 52 non-metallic and 22 minor minerals.

RESOURCES:

Mineral resources of Uttarakhand play a significant role in the economy of Uttarakhand. The Chamoli district of Uttarakhand is especially famous for housing a number of mineral resources in Uttarakhand. The northern division of the district consist entirely of medium to high grade metamorphic rocks, which also contains bands of volcanic rocks in some areas; the southern division contains sedimentary and low-grade metamorphic rocks, with bands of volcanic rocks in some regions. Although much is not known about the geology of the first division of Chamoli, yet the mineral resources contain rocks such as quartzite, marble, and various types of schist and gneiss. The southern division contains rocks such as gneiss, limestone, phyllites, quartzite, sericite-biotite schist and slate.

Some of the important minerals that form a major part of the mineral resources of Uttarakhand are: Asbestos, Magnestic, Soapstone or Steatite, Copper, Iron, Graphite, Gold, Gypsum, Lead, Slate, Limestone, Building Stone, Sulfur, and Bitumen. Beside these major mineral resources, some of the other mineral resources of Uttarakhand also play a major role in enhancing the economy of Uttarakhand. Some of those mineral resources are: Antimony, Arsenic, Lignite or Brown Marble, Mica, Silver, etc.

GOVERNMENT POLICIES:

NATIONAL MINERAL POLICY, 2008

Keeping in view the long term national goals and perspective for exploitation of minerals, Government of India has revised its earlier National Mineral Policy, 1993 and came up with a new National Mineral Policy 2008. Basic goals of NMP 2008 are-

1.       Regional and detailed exploration using state of the art techniques in time bound manner.

2.       Zero waste mining

For achieving the above goals, important changes envisaged are:

•        Creation of improved regulatory environment to make it more conducive to investment and technology flows

•        Transparency in allocation of concessions

•        Preference for value addition

•        Development of proper inventory of resources and reserves

•        Enforcement of mining plans for adoption of proper mining methods and   optimum utilization of minerals 

•        Data filing requirements will be rigorously monitored

•        Old disused mining sites will be used for plantation or for other useful purposes.

•        Mining infrastructure will be upgraded through PPP initiatives

•        State PSU involved in mining sector will be modernized

•        State Directorate will be strengthened to enable it to regulate   mining in a proper way and to check illegal mining

•        There will be arms length distance between State agencies that mine  and those that regulate

•        Productivity and economics of mining operation, safety and health of workers and others will be encouraged.

Tourism: Project Opportunities in Uttarakhand

PROFILE:

Tourism in India is the largest service industry, with a contribution of 6.23% to the national GDP and 8.78% of the total employment in India. The tourism industry in India is substantial and vibrant, and the country is fast becoming a major global destination. India’s travel and tourism industry is one of them most profitable industries in the country, and also credited with contributing a substantial amount of foreign exchange. Indian Tourism offers a potpourri of different cultures, traditions, festivals, and places of interest.

RESOURCES:

Uttarakhand - the land of gods, the home of Himalayas and truly a paradise on earth, allures everyone from everywhere. Uttarakhand is paradise for different types of adventure activities. Like River Rafting, Trekking, Skiing, Camping, Rock Climbing, Rappelling, River Crossing. Mountaineering, Paragliding and Hot Ballooning make Uttarakhand one of the most attractive destinations for adventure sports not only in the India but the world. Gangotri and Yamunotri, the sources of both the Ganges and Yamuna fall in the upper reaches of the state and together with Badrinath (dedicated to Vishnu) and Kedarnath (dedicated to Shiva) form the Char Dham, one of Hinduism's most spiritual and auspicious pilgrimage circuits. Haridwar, meaning "Gateway to God" is a prime Hindu destination. Haridwar hosts the Kumbha Mela every twelve years, in which millions of pilgrims take part from all parts of the India and the world. Rishikesh near Haridwar is known as the preeminent yoga centre of India. The state has an abundance of temples and shrines, many dedicated to local deities or manifestations of Shiva and Durga, references to many of which can be found in Hindu scriptures and legends.

GOVERNMENT POLICIES:

In order to develop tourism in India in a systematic manner, position it as a major engine of economic growth and to harness its direct and multiplier effects for employment and poverty eradication in an environmentally sustainable manner, the National Tourism Policy was formulated in the year 2002. Broadly, the Policy attempts to:-

•        Position tourism as a major engine of economic growth;

•        Harness the direct and multiplier effects of tourism for employment generation, economic development and providing impetus to rural tourism;

•        Focus on domestic tourism as a major driver of tourism growth.

•        Position India as a global brand to take advantage of the burgeoning global travel trade and the vast untapped potential of India as a destination;

•        Acknowledges the critical role of private sector with government working as a pro-active facilitator and catalyst;

•        Create and develop integrated tourism circuits based on India’s unique civilization, heritage, and culture in partnership with States, private sector and other agencies; and ensure that the tourist to India gets physically invigorated, mentally rejuvenated, culturally enriched, spiritually elevated and feel India from within.

 

Waste management and recycling: Project Opportunities in Uttarakhand

PROFILE:

Rapid industrialization last few decades have led to the depletion of pollution of precious natural resources in India depletes and pollutes resources continuously. Further the rapid industrial developments have, also, led to the generation of huge quantities of hazardous wastes, which have further aggravated the environmental problems in the country by depleting and polluting natural resources. Therefore, rational and sustainable utilization of natural resources and its protection from toxic releases is vital for sustainable socio-economic development.

Hazardous waste management is a new concept for most of the Asian countries including India. The lack of technical and financial resources and the regulatory control for the management of hazardous wastes in the past had led to the unscientific disposal of hazardous wastes in India, which posed serious risks to human, animal and plant life.

RESOURCES:

Investments are aimed at improving public health and the environmental quality in the Program towns and the adjacent open land and water bodies by increasing solid waste collection coverage from 50% to 72% and supporting sound solid waste disposal methods. Improvements will be directed at (i) segregation of solid waste at household level and handling and management improvements at wards and town levels with an emphasis on waste minimization, (ii) provision of solid waste collection and transportation equipment, and (iii) construction of sanitary landfills in accordance with GoI’s Municipal Solid Waste Management and Handling Rules 2000. These will develop into a State wide SWM strategy, action plan, and town wise SWM master plan reports supported by capacity building of ULBs in SWM.

GOVERNMENT POLICIES:

National policy on waste management is set out in the October 1998 policy statement on waste management- Changing our ways. It outlines the Government's policy objectives in relation to waste management, and suggests some key issues and considerations that must be addressed to achieve these objectives. The policy is firmly grounded in an internationally recognised hierarchy of options, namely prevention, minimisation, reuse/recycling, and the environmentally sustainable disposal of waste which cannot be prevented or recovered.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
How to Start a Production Unit for Intravenous (IV) Cannulas
How to Start a Production Unit for Intravenous (IV) Cannulas

 

How to Sta... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Vitamin C or Ascorbate Manufacturing Plant from Sorbitol
Vitamin C or Ascorbate Manufacturing Plant from Sorbitol

 


Vitamin C or Ascorbate Manufacturing Plant from Sorbitol. Profitable Business Opportunities f...
Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Helmet
Manufacturing Business of Helmet

A motorcycle helmet (protective headgear) is a type of helmet ... Read More

Capacity :
1500 Nos. per day
Plant and Machinery cost:
230.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
680.00Lakhs
Add To Inquiry Basket
Production Unit of Methyltetrahydrophthalic Anhydride (MTHPA)
Production Unit of Methyltetrahydrophthalic Anhydride (MTHPA)

 

Methyl tetrahydrop... Read More

Capacity :
16,000 Kgs Per Day
Plant and Machinery cost:
234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
897.00Lakhs
Add To Inquiry Basket
Emerging Investment Opportunities for Entrepreneurs in Cold Storage Business in India Scope in Refrigerated Storage and Warehousing Industry
Emerging Investment Opportunities for Entrepreneurs in Cold Storage Business in India Scope in Refrigerated Storage and Warehousing Industry

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Startup Multispeciality Hospital Business Ideas with High Profits 100 Bedded Multispeciality Hospital Profitable Project for Investment in Healthcare Industry
Business Plan for Startup Multispeciality Hospital Business Ideas with High Profits 100 Bedded Multispeciality Hospital Profitable Project for Investment in Healthcare Industry

Introduction: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Baby Diaper T shape and Pull up Pants Manufacturing Business How to Start Production of Baby Diaper T shape and Pull up Pants, Investment Opportunities and Business Ideas
Baby Diaper T shape and Pull up Pants Manufacturing Business How to Start Production of Baby Diaper T shape and Pull up Pants, Investment Opportunities and Business Ideas

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Emerging Investment Opportunities in Production Business of Glucose Saline (Intravenous Sugar Solution) IV fluids Used in Hospitals, Nursing Homes
Emerging Investment Opportunities in Production Business of Glucose Saline (Intravenous Sugar Solution) IV fluids Used in Hospitals, Nursing Homes

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Banana Farming Business (Banana Cultivation is a Very Profitable Agriculture Business in India)
Banana Farming Business (Banana Cultivation is a Very Profitable Agriculture Business in India)

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of PVC Edge Band Tape, Investment Opportunities in Industry of Plastic
Start Production of PVC Edge Band Tape, Investment Opportunities in Industry of Plastic

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Opportunities in Production of Ayurvedic Pain Balm
Business Opportunities in Production of Ayurvedic Pain Balm

 

Herbs are a diver... Read More

Capacity :
13333 Bottles Per Day
Plant and Machinery cost:
15.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
293.00Lakhs
Add To Inquiry Basket
Opportunities in Dextrose Saline Manufacturing Business
Opportunities in Dextrose Saline Manufacturing Business

 

  ... Read More

Capacity :
Dextrose Saline 500 ml Size:15,000 Bottles Per Day Dextrose Saline 1000 ml Size:15,000 Bottles Per D
Plant and Machinery cost:
1148.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
1542.00Lakhs
Add To Inquiry Basket
Set up a Production unit for Maize Processing Starch, Glucose, Germs, Fibres, Gluten and Steep Water Business Opportunities in Agriculture products Industry
Set up a Production unit for Maize Processing Starch, Glucose, Germs, Fibres, Gluten and Steep Water Business Opportunities in Agriculture products Industry

 

Set up a ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production Business of Adhesive Fevicol Type Profitable business Idea in Adhesive industry
Production Business of Adhesive Fevicol Type Profitable business Idea in Adhesive industry

 

INTRODUCT... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Business of  A2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)
Start Business of A2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)

 

Milk is the most ... Read More

Capacity :
A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P
Plant and Machinery cost:
19.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
Production Business of  Fiberglass Wool Ceiling Tiles
Production Business of Fiberglass Wool Ceiling Tiles

 

Fiberglass ceilin... Read More

Capacity :
Fiberglass Wool Ceiling Tiles 3,000 Sq. Mtr. Per Day
Plant and Machinery cost:
482.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1082.00Lakhs
Add To Inquiry Basket
Lucrative Business of  Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)
Lucrative Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)

 

Milk is a vital c... Read More

Capacity :
Baby Milk Powder 400 gms Size Pack 62,500Nos Per Day Milk Powder for Tea & Coffee 200 gms Size Pack
Plant and Machinery cost:
948.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
2711.00Lakhs
Add To Inquiry Basket
Manufacturing of HDPE Pipes
Manufacturing of HDPE Pipes

 

HDPE pipe has bee... Read More

Capacity :
HDPE Pipes 7,200Kgs per day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
541.00Lakhs
Add To Inquiry Basket
Setup an Industrial Park
Setup an Industrial Park

 

Parks, community ... Read More

Capacity :
Type 1 Industrial Plots Area 500 sq.mt. Size 90 Nos Type 2 Industrial Plots Area 1000 sq.mt. Size 4
Plant and Machinery cost:
329.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
18.00 %
TCI :
0.00 Lakhs
Cost of Project :
30642.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Business of Chilli Powder, Chilli Flakes & Chilli Oil
Investment Opportunities in Business of Chilli Powder, Chilli Flakes & Chilli Oil

 

Spices are used i... Read More

Capacity :
Chilli Powder 1,000 Kgs Per Day Chilli Flakes 500 Kgs Per Day Chilli Oil 50 Kgs Per Day by Product C
Plant and Machinery cost:
149.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
334.00Lakhs
Add To Inquiry Basket
Start Production Business of Sanitary Napkins Get Started Today Fastest Growing Industry of Women Hygiene Products
Start Production Business of Sanitary Napkins Get Started Today Fastest Growing Industry of Women Hygiene Products

Sanitary napkins are classified as nonwoven fabrics, which are classified as technica... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of  Blood Collection Tubes Vacutainer
Manufacturing Business of Blood Collection Tubes Vacutainer

 

A va... Read More

Capacity :
Blood Collection Tubes (Vacutainer) 13x100 with EDTA: 100,000 Nos per day Blood Collection Tubes (Va
Plant and Machinery cost:
345.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
983.00Lakhs
Add To Inquiry Basket
Production Business of  Sodium Bicarbonate and Acetic Acid
Production Business of Sodium Bicarbonate and Acetic Acid

The chemical compound sodium bicarbonate has the formula NaHCO3. I... Read More

Capacity :
Sodium Bicarbonate 100.0 MT Per Day Acetic Acid 150.0 MT Per Day
Plant and Machinery cost:
7051.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
69.00 %
TCI :
0.00 Lakhs
Cost of Project :
10501.00Lakhs
Add To Inquiry Basket
Set up a Medical College  with Hospital
Set up a Medical College with Hospital

 

A me... Read More

Capacity :
Student Admission Fee1.39 Units per day Student (Indian) Tution College Fee 1.17 Units per day Stud
Plant and Machinery cost:
1804.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
16.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
12227.00Lakhs
Add To Inquiry Basket
Setup Your Own Production Business of Disposable Plastic Syringes Fastest Growing Industry of Medical Disposables
Setup Your Own Production Business of Disposable Plastic Syringes Fastest Growing Industry of Medical Disposables

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production Industry of Calcium Carbide (CaC2)
Production Industry of Calcium Carbide (CaC2)

 

Calcium carbide, ... Read More

Capacity :
Calcium Carbide 60 MT Per Day
Plant and Machinery cost:
2127.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
3810.00Lakhs
Add To Inquiry Basket
Opportunities in Manufacturing of Solar Inverter (100 KVA – 1000 KVA)
Opportunities in Manufacturing of Solar Inverter (100 KVA – 1000 KVA)

 

A solar inverter,... Read More

Capacity :
Solar Inverter 50 Hz 100 to 1000 KVA 15 NosPer Day
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1288.00Lakhs
Add To Inquiry Basket
Opportunities in Drinking Water  with Packaging in Aluminium Beverage Cans (Mineral, Carbonated, Alkaline)
Opportunities in Drinking Water with Packaging in Aluminium Beverage Cans (Mineral, Carbonated, Alkaline)

 

It goes without s... Read More

Capacity :
Mineral Water 2,000 Cans Per Day Carbonated Water 2,000 Cans Per Day Alkaline Water 2,000 Cans Per
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
417.00Lakhs
Add To Inquiry Basket
Production Business of  Ethanol from Maize
Production Business of Ethanol from Maize

 

Ethanol is widely... Read More

Capacity :
Ethanol 60 KLtrs per day
Plant and Machinery cost:
49.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
80.00Lakhs
Add To Inquiry Basket
Lucrative Production Business of Calcium Carbide (Calcium Acetylide) Profitable Industry of Chemical Sector
Lucrative Production Business of Calcium Carbide (Calcium Acetylide) Profitable Industry of Chemical Sector

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Demanding Business of E-Rickshaw Assembling
Demanding Business of E-Rickshaw Assembling

E Rickshaws are three wheel ... Read More

Capacity :
200 Nos per day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
2580.00Lakhs
Add To Inquiry Basket
Setting a Profitable Business of Edible Oil Refinery (Soya & Palm)
Setting a Profitable Business of Edible Oil Refinery (Soya & Palm)

Edible oil is extracted from... Read More

Capacity :
Refined Palm Oil 50 MT Per Day Refined Soya Oil 50 MT Per Day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
3614.00Lakhs
Add To Inquiry Basket
Start your own Manufacturing Industry of Men’s Undergarments (EOU)
Start your own Manufacturing Industry of Men’s Undergarments (EOU)

Men’s underwear, also... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Sodium Hydrosulphite
Production of Sodium Hydrosulphite

Sodium hydrosulfite, also known as sodium dithionite or sodium hydrosulfide, is a che... Read More

Capacity :
60 MT per Day
Plant and Machinery cost:
280.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
934.00Lakhs
Add To Inquiry Basket
Detailed Project Report on E-Waste Recycling Plant
Detailed Project Report on E-Waste Recycling Plant

Electronic wastes, "e-waste... Read More

Capacity :
Plastic: 1.60 MT per day Ferrous Material: 1.00 MT per day, Aluminium: 0.70 MT per day, Glass: 1.00
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
Aluminium Cans for Beverages Manufacturing Plant
Aluminium Cans for Beverages Manufacturing Plant

The aluminium beverage can is now the popular choice for carbonated and still soft dr... Read More

Capacity :
Aluminium Cans for Beverage Size 355 ml 83,333 Pcs. per day, Aluminium Cans for Beverage Size 473 ml
Plant and Machinery cost:
3933.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
5655.00Lakhs
Add To Inquiry Basket
Micronutrient Fortified Energy Dense Food Manufacturing Business
Micronutrient Fortified Energy Dense Food Manufacturing Business

Even though most people think about protein as the nutrient that makes us feel full a... Read More

Capacity :
Micronutients Fortified Energy Dense Food (Rice) 1,600 Kgs per Day
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
56.00Lakhs
Add To Inquiry Basket
Production of Polyester Textured Yarn from Used Pet Bottle
Production of Polyester Textured Yarn from Used Pet Bottle

Polyester Texturised Yarn are sometimes referred to as polyester filament, polyester ... Read More

Capacity :
50 MT Per Day
Plant and Machinery cost:
1908.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
3844.00Lakhs
Add To Inquiry Basket
Start Printed Circuit Board PCBs Manufacturing Business
Start Printed Circuit Board PCBs Manufacturing Business

Modern electronic products,... Read More

Capacity :
Multilayer High Density Interconnect PCBs 40 SqMtrs. Per Day Multilayer Flex PCBs 40 SqMtrs. Per D
Plant and Machinery cost:
260.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
594.00Lakhs
Add To Inquiry Basket
Micronutrient Fortified Energy Dense Food Production Business
Micronutrient Fortified Energy Dense Food Production Business

Micronutrient Fortified Ene... Read More

Capacity :
1600 Kgs Per Day
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
56.00Lakhs
Add To Inquiry Basket
Profitable Business of Cocoa Processing Unit Cocoa Butter, Cocoa Couverture and Cocoa Powder  Further Processed Products Spreads and Chocolate Syrups
Profitable Business of Cocoa Processing Unit Cocoa Butter, Cocoa Couverture and Cocoa Powder Further Processed Products Spreads and Chocolate Syrups

Cocoa processing is the pro... Read More

Capacity :
Cocoa Liquor 2,000 Kgs Per Day Cocoa Butter 974.4 Kgs Per Day Cocoa Powder 512.8 Kgs Per Day Ch
Plant and Machinery cost:
1582.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
2422.00Lakhs
Add To Inquiry Basket
Production of Tiles Adhesive (Polymer Modified Cementatious)
Production of Tiles Adhesive (Polymer Modified Cementatious)

The tiles adhesive is a sti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Bio Organic Fertilizer from Tea Waste Profitable Project Opportunities in Organic Fertilizers Sector
Production of Bio Organic Fertilizer from Tea Waste Profitable Project Opportunities in Organic Fertilizers Sector

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)
A Complete Business Plan for Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are t... Read More

Capacity :
150 Nos per day
Plant and Machinery cost:
155.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
708.00Lakhs
Add To Inquiry Basket
Carbon Fibre Manufacturing
Carbon Fibre Manufacturing

Carbon fibers are usually combined with other materials to make a composite. When combined with a plastic resin ... Read More

Capacity :
Carbon Fibre: 1,000 Kgs / Day
Plant and Machinery cost:
194.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
623.00Lakhs
Add To Inquiry Basket
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry

Production of Azithromycin, Cefixi... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Citric Acid Production from Corn
Citric Acid Production from Corn

Citric acid is described as “nature's acidulate”, occurring during a wide variety of plants, citrus fruits... Read More

Capacity :
Citric Acid : 20 MT / Day Animal Feed bye product: 15.2 MT / Day Gluten bye product: 7.3 MT / Day
Plant and Machinery cost:
1799.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
3559.00Lakhs
Add To Inquiry Basket
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient

Production of Ciprofloxacin Hydrochloride (CIPRO) - Active ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Urea Fertilizer
Production of Urea Fertilizer

Production of Urea Fertilizer. Business Plan & Investmen... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Market Research Report on-India Natural Food Colour Market - Industry-Size-Share-Trends-Analysis and Forecasts upto 2027
Market Research Report on-India Natural Food Colour Market - Industry-Size-Share-Trends-Analysis and Forecasts upto 2027

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Starting Fish Feed Production
Business Plan for Starting Fish Feed Production

Fish feed are placed in the middle of the aquaculture value chain. Raw materials of marine or land based origin ... Read More

Capacity :
Fish Feed : 100 MT / Day
Plant and Machinery cost:
845.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
2273.00Lakhs
Add To Inquiry Basket
Ginger Oil Manufacturing Business Plan
Ginger Oil Manufacturing Business Plan

Ginger, one of the most important and oldest of spices used in every kinds of food preparation. The rhizomes known in the trade as hand or races re... Read More

Capacity :
Ginger Oil : 100 Kgs / Day
Plant and Machinery cost:
56.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
214.00Lakhs
Add To Inquiry Basket
Fiber Optical Cables (OFC) Manufacturing Unit
Fiber Optical Cables (OFC) Manufacturing Unit

A fiber cable is a structure for enclosing a fiber to enable it to maintain its performance for sufficient time ... Read More

Capacity :
Fiber Optical Cables : 3,333.3 K. Meters/Day
Plant and Machinery cost:
1183.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
5070.00Lakhs
Add To Inquiry Basket
Bamboo Paper Based Products Manufacturing Tissue Paper, Paper Bags & Plates
Bamboo Paper Based Products Manufacturing Tissue Paper, Paper Bags & Plates

Tissue paper is produced by using the paper pulp of hardwood and softwood trees, water and chemicals. It is majorly used for hygiene and sanitation... Read More

Capacity :
Tissue Paper per Packet 25 Pcs. each : 7,000 Pkts. / Day Paper Bag per Packet 10 Pcs. each : 7,200
Plant and Machinery cost:
73.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
307.00Lakhs
Add To Inquiry Basket
Start a Disposable Surgical-Medical-Glove Manufacturing Business
Start a Disposable Surgical-Medical-Glove Manufacturing Business

A surgical (surgeon’s) glove is made of natural or synthetic rubber intended to be worn by operating room ... Read More

Capacity :
Disposable Surgical Latex Rubber Gloves (Wt. 4± 0.02 gms each) : 40,000 Pairs / Day
Plant and Machinery cost:
240.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
936.00Lakhs
Add To Inquiry Basket
7-Aminocephalosporanic Acid (7-ACA) Production
7-Aminocephalosporanic Acid (7-ACA) Production

7-Aminocephalosporanic Acid (7-ACA) Production – Acti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Roll Forming with Metal Beam, Highway Guard Crash Barrier and Galvanizing Plant
Roll Forming with Metal Beam, Highway Guard Crash Barrier and Galvanizing Plant

Roll Forming with Metal Beam, Highway Guard Crash Barrier and Galvanizing Plant. Highly ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of DCDA - Dicyandiamide (2-Cyanoguanidine)
Production of DCDA - Dicyandiamide (2-Cyanoguanidine)

Production of DCDA - Dicyandiamide (2-Cyanoguanidine). Active Phar... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Sterile Disposable Plastic Syringes Manufacturing
Sterile Disposable Plastic Syringes Manufacturing

Disposable Syringes are made from plastic material and are utilized in th... Read More

Capacity :
Disposable Plastic Syringes 3 ml Size: 1,440 Boxes / Day (Each Box = 100 Pcs) Disposable Plastic Syr
Plant and Machinery cost:
340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
772.00Lakhs
Add To Inquiry Basket
Manufacturing Ideas & Investment Opportunities in the Business of Disposable Plates and Cups from Waste Rice Husk Powder
Manufacturing Ideas & Investment Opportunities in the Business of Disposable Plates and Cups from Waste Rice Husk Powder

Low-grade material is used to make a lot of disposable paper and plastic plates. They... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
12345678910...

Showing 781 - 840 of 2717 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR