• 0

Project Consultancy, Reports & Profiles

Tripura is a state in Northeast India. The third-smallest state in the country, it covers 10,491 km2 (4,051 sq mi) and is bordered by Bangladesh (East Bengal) to the north, south, and west, and the Indian states of Assam and Mizoram to the east. Tripura is a landlocked state in North East India. The state has a tropical savanna climate, designated Aw under the Köppen climate classification. The undulating topography leads to local variations, particularly in the hill ranges. The four main seasons are winter, from December to February; pre-monsoon or summer, from March to April; monsoon, from May to September; and post-monsoon, from October to November.

Tripura's gross state domestic product for 2010–11 was 129.47 billion (US$2.1 billion) at constant price (2004–05), recording 5.71 per cent growth over the previous year. In the same period, the GDP of India was 48778.42 billion (US$790 billion), with a growth rate of 8.55 per cent. Tripura is an agrarian state with more than half of the population dependent on agriculture and allied activities. However, due to hilly terrain and forest cover, only 27 per cent of the land is available for cultivation. Rice, the major crop of the state, is cultivated in 91 per cent of the cropped area.

TOURISM

Tripura has a geographical area of about 10,492 sq. km. almost two-thirds of the state is under hilly terrain and it is surrounded on three sides by the deltaic basin of Bangladesh. The Tripura tribal’s are divided into two groups: Puran Tripuras and Natun Tripuras. The Puran Tripuras are the original inhabitants of the State and constitute a little over 16% of the total and 57% of the tribal population of the State. The Department of Tourism, Govt. of India, under the ministry of Tourism and Culture has been providing liberal financial and technical support for the tourism development in the state based on the projects received from the states. It is quite clear that Tripura has tremendous and quite unique tourism potential. This could be tapped mainly through the concept of Eco-tourism and Heritage tourism. Nature / wildlife tourism, adventure tourism, rural tourism, leisure tourism, pilgrimage tourism, international border tourism could be some special tourist packages. The Tourism Development in the Northeast region will depend on integrated approach, involving various government departments, private entrepreneurs, voluntary organizations and local community. This approach will also help in evolving local people’s perception towards tourism development as a strong tool for socio-economic up liftment.

INDUSTRIAL SECTOR

The State Government offers a package of incentives for setting up of industrial units, which is comparable to other states. Besides, the special incentive package i.e. North East Industrial and Investment Promotion Policy (NEIIP) declared by the Government of India for the North East Region is available to industrial units.

State Package of Incentives under Tripura Industrial Investment Promotion Incentive Scheme-

•                    Capital Investment Subsidy @ 30% and additional subsidy @ 2.5% for enterprises of ST, SC, & women individuals on Fixed Capital Investment.

•                    Full Reimbursement of Standard Certification Fees /Charges / other expenses on account of obtaining a standard Certification.

•                    Provides State Transport Subsidy for covering the portion for which Central Transport Subsidy is not available

•                    85% Exemption from the payment of Earnest Money and Security Deposits on tenders floated by State Govt. Department / Agencies.

Incentives declared by Central Government:

•                    Exemption of Excise Duty on finished products.

•                    Central Transport Subsidy.

•                    Income Tax Benefit.

•                    Capital Investment Subsidy.

•                    Comprehensive Insurance Scheme for insurance coverage. Subsidies to service sector, bio-technology and power generating industries.

INVESTMENT OPPORTUNITIES

Tripura offers an investor-friendly environment. The Government welcomes investments into the State, from both domestic and foreign investors.

•        Natural gas

Tripura has vast reserves of natural gas in non-associate form. The gas is of high quality, with high methane content of up to 97%. The availability of superior quality natural gas, at concessional price, offers a great opportunity to prospective investors, to set up gas-based industrial units, using natural gas

•        Information Technology (IT)

Tripura has been considered the second best IT destination in the North East. IT sector (including IT-enabled services) has been identified as one of the major potential growth sectors by the state. The high literacy rate of the State provides additional advantage for development of the sector.

•        Food Processing

The State government has identified food processing as a major thrust area. There is a vast potential for setting up of food processing units in the State. The agro-climatic conditions in Tripura are ideally suited for production of a large variety of horticultural crops.

•        Handicrafts

From time immemorial, Tripura has carved out a name for itself in the field of handicrafts. The gifted artisans produce wonderful objects of crafts from simple material like cane, bamboo and wood.

•        Tourism

Tripura is an attractive tourist destination. The state has a rich cultural heritage. There are number of historical Hindu and Buddhist sites.


INDUSTRIAL POLICY

•        To improve Basic as well Industrial Infrastructure.

•        Industrial Growth by attracting Private Investment.

•        To improve investment climate towards better regulation by removing barriers to competition.

•        Creation of hassle-free and congenial investment climate.

•        To bring significant increase in the State Domestic Product.

•        Widening of resources base of the state.

•        Development of connectivity (Internal road, railways and air & telecom).

•        Better social infrastructure Enabling Entrepreneurship -building capacities through entrepreneurial and technical skills, training and promotion of self-employment.

THRUST AREAS

•        Natural Gas

•        Food Processing

•        Rubber

•        Tea

•        Handicraft

•        Bamboo

•        Handloom

•        Tourism

•        Information Technology

•        Education

  •           Healthcare

The Department of Industries & Commerce was established to promote Village and Small-scale industries as well as medium and large scale industries in the State. While efforts are being made to promote entrepreneurship within the State, the outside investors in the public and private sectors are also encouraged both for their financial capabilities and technical expertise, for the medium and large-scale units. The major existing industrial area is the Industrial Growth Centre Complex at Bodhjungnagar which also includes Food Park, Rubber Park and Export Promotion Industrial Park. The other industrial sites near Agartala as the main business and industrial centres are Dukli, Arundhatinagar and Badharghat. The mineral resources are minor amounts of glass sands, limestone, plastic clay and hard rock and all of these materials are being used in varying degrees. Setting up of ceramic tiles unit and other mineral based industries are being encouraged in the private sector.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Business of Disposable Safety Razors
Business of Disposable Safety Razors

 

The double-edged ... Read More

Capacity :
Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da
Plant and Machinery cost:
393.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
57.75%
Break Even Point (BEP):
28.02 %
TCI :
0.00 Lakhs
Cost of Project :
815.00Lakhs
Add To Inquiry Basket
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings

Pipe fittings, also known a... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Extraction of Essential Oil from Lemon Grass
Extraction of Essential Oil from Lemon Grass

Oil of lemongrass is one of the most important essential Oils. Large quantities are used for the extraction of citr... Read More

Capacity :
Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.60%
Break Even Point (BEP):
69.69 %
TCI :
0.00 Lakhs
Cost of Project :
607.00Lakhs
Add To Inquiry Basket
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant

 

Bicarbonate Cartri... Read More

Capacity :
Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co
Plant and Machinery cost:
53.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.28%
Break Even Point (BEP):
35.25 %
TCI :
0.00 Lakhs
Cost of Project :
1153.00Lakhs
Add To Inquiry Basket
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit

 

Methylated spirits... Read More

Capacity :
Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S
Plant and Machinery cost:
79.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.53%
Break Even Point (BEP):
54.72 %
TCI :
0.00 Lakhs
Cost of Project :
265.00Lakhs
Add To Inquiry Basket
Manufacturing of Rubber Powder from Waste Tyres
Manufacturing of Rubber Powder from Waste Tyres

 

Rubber is polymer ... Read More

Capacity :
Rubber Powder 5.0 MT per day By Product Steel Wire 1.4 MT per day
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.98%
Break Even Point (BEP):
61.44 %
TCI :
0.00 Lakhs
Cost of Project :
191.00Lakhs
Add To Inquiry Basket
Start extraction of Cashew Nut Shell Oil and Cardanol
Start extraction of Cashew Nut Shell Oil and Cardanol

 

Cashew (Botanical ... Read More

Capacity :
Cashew Nut Shell Oil 11.0 MT per day Cardanol 5.5 MT per day De-Oiled Cashew Nut Shell Cake (bye Pro
Plant and Machinery cost:
323.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.72%
Break Even Point (BEP):
52.53 %
TCI :
0.00 Lakhs
Cost of Project :
752.00Lakhs
Add To Inquiry Basket
Setup a Manufacturing Plant of  Disposable Plastic Syringes with Needles
Setup a Manufacturing Plant of Disposable Plastic Syringes with Needles

 

Disposable Syringes are made of plas... Read More

Capacity :
Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D
Plant and Machinery cost:
524.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.78%
Break Even Point (BEP):
35.60 %
TCI :
0.00 Lakhs
Cost of Project :
345.00Lakhs
Add To Inquiry Basket
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry

 

Disposable safety razors have a design that is very s... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant

Ethanol is a colourless, pu... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Magnesium Stearate
Magnesium Stearate

 

Magnesium stearat... Read More

Capacity :
Magnesium Stearate 10.0 MT Per Day
Plant and Machinery cost:
301.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
515.00Lakhs
Add To Inquiry Basket
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea

Bromelain is a combination ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Sodium Chlorite Liquid from Powder (31 Percent Liquid NaClO2)
Manufacturing of Sodium Chlorite Liquid from Powder (31 Percent Liquid NaClO2)

Sodium chlorite (NaClO2) is a chemical compound used in the manufacturing of paper and as a disinfect... Read More

Capacity :
Sodium Chlorite Liquid: 1.7 MT / Day
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
120.00Lakhs
Add To Inquiry Basket
Manufacturing of Banana Wafers (Deep Fried Snack Food)
Manufacturing of Banana Wafers (Deep Fried Snack Food)

Fried banana wafers are a deep fried snack food prepared from green fresh mature bananas of the cookin... Read More

Capacity :
Banana Wafers (40 gms size): 10,700 Packets / Day Banana Wafers (20 gms size): 21,300 Packets / Day
Plant and Machinery cost:
37.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
393.00Lakhs
Add To Inquiry Basket
Fruit Wine (Alcoholic Beverage) Manufacturing Plant
Fruit Wine (Alcoholic Beverage) Manufacturing Plant

Fruit wines are fermented alcoholic beverages made up of a variety of base ingredients (other tha... Read More

Capacity :
Fruit Wine (750 ml size Bollte): 2,666.7 Bottles / Day
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
873.00Lakhs
Add To Inquiry Basket
Production of Needles for Sewing and Embroidery Machine
Production of Needles for Sewing and Embroidery Machine

A sewing needle, used for hand-sewing, may be a long slender tool with a pointed tip at one end and a hole (... Read More

Capacity :
Sewing Needles (30 g each) per Pack 50 Pcs.: 6,400 Packs / Day Embroidery Needles (30 g each) per P
Plant and Machinery cost:
256.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
939.00Lakhs
Add To Inquiry Basket
Manufacturing of Pasta and Macaroni
Manufacturing of Pasta and Macaroni

Pasta may be a food that's loved by people of all age bracket. It not just ea... Read More

Capacity :
Pasta (1 Kg Pack): 13,000 Packs / Day Macaroni (1 Kg Pack) : 13,000 Packs / Day
Plant and Machinery cost:
863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Aluminium Ingots (Aluminium Alloy Ingots) from Aluminium Scrap Manufacturing
Aluminium Ingots (Aluminium Alloy Ingots) from Aluminium Scrap Manufacturing

Ingots are very large casting products, greater in size and shape than blooms, billets and sla... Read More

Capacity :
Aluminium Alloy Ingots: 24 MT / Day Aluminium Scrap : 0.40 MT / Day
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
703.00Lakhs
Add To Inquiry Basket
Manufacturing of CPVC (Chlorinated Polyvinyl Chloride)
Manufacturing of CPVC (Chlorinated Polyvinyl Chloride)

 

CPVC could be a high-temperature plastic pressure piping system introduced for ... Read More

Capacity :
Chlorinated Polyvinyl Chloride: 80 MT/ Day
Plant and Machinery cost:
588.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2283.00Lakhs
Add To Inquiry Basket
Plant‐Based Meat Alternatives -Meat Analogue, Vegan Meat & Mock Meat Manufacturing from Soyabean and Wheat Gluten
Plant‐Based Meat Alternatives -Meat Analogue, Vegan Meat & Mock Meat Manufacturing from Soyabean and Wheat Gluten

A meat analogue, also referred to as a meat alternative or substitute, or as mock, imitation, vegetarian, or vegan mea... Read More

Capacity :
Meat Analogue (200 gms each Pack): 1000 Packs / Day Vegan Meat (200 gms each Pack): 1000 Packs / Day
Plant and Machinery cost:
17.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
138.00Lakhs
Add To Inquiry Basket
Beer Production from Rice with Packaging in Can & Bottles
Beer Production from Rice with Packaging in Can & Bottles

Beer is distributed in bottles and cans and is additionally commonly available on draught, particularly in pubs and bars. The brewing industry may ... Read More

Capacity :
Rice Beer (650 ml Bottle):12,924 No’s/Day Rice Beer (500 ml Can): 16,800 No’s/Day
Plant and Machinery cost:
2631.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
4596.00Lakhs
Add To Inquiry Basket
Start Manufacturing of PP Woven Fabric
Start Manufacturing of PP Woven Fabric

Polypropylene, which is also known as PP for short name, is one kind of thermoplastic... Read More

Capacity :
PP Woven Fabric 12 MT per day
Plant and Machinery cost:
943.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1637.00Lakhs
Add To Inquiry Basket
Business Opportunities in Production of Dicyandiamide  (DCDA)
Business Opportunities in Production of Dicyandiamide (DCDA)

 

Dicyandiamide is ... Read More

Capacity :
Dicyandiamide (DCDA) 5 MT Per Day
Plant and Machinery cost:
45.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
270.00Lakhs
Add To Inquiry Basket
Emerging Business of Shrimp Processing  (EOU)
Emerging Business of Shrimp Processing (EOU)

 

Shrimp are decapo... Read More

Capacity :
Shrimp Processing (per Pack 1 Kg Size) 19,500 Kgs Per Day
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
1465.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Business of IV Fluids (BFS Technology)
Investment Opportunities in Business of IV Fluids (BFS Technology)

 

Intravenous fluid... Read More

Capacity :
IV Fluids (500 ml Size Bottle) 50,000 Bottles per day
Plant and Machinery cost:
3449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
4089.00Lakhs
Add To Inquiry Basket
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)

Milk is the most important source of protein and is consumed by people all over the w... Read More

Capacity :
A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P
Plant and Machinery cost:
19.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
Start Production of  Paracetamol (BP,IP,USP Grade)
Start Production of Paracetamol (BP,IP,USP Grade)

Read More

Capacity :
Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day
Plant and Machinery cost:
962.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
2887.00Lakhs
Add To Inquiry Basket
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots

 

Cassava, sorghum,... Read More

Capacity :
Industrial Grade Starch 37.5 MT Per Day Pharmaceutical Grade Starch 12.5 MT Per Day
Plant and Machinery cost:
257.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
1255.00Lakhs
Add To Inquiry Basket
Production of  Copper Wire Drawing & Enamelling
Production of Copper Wire Drawing & Enamelling

 

Copper is one of ... Read More

Capacity :
Copper Wire (0.914 to 0.376 mm) 350 Kgs per day Enamelled Copper Wire (0.914 to 0.376 mm) 350 Kgs pe
Plant and Machinery cost:
432.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1233.00Lakhs
Add To Inquiry Basket
Profitable Industry of Bamboo Sticks
Profitable Industry of Bamboo Sticks

 

Bamboo is a tribe... Read More

Capacity :
Bamboo Sticks 4 MT Per Day
Plant and Machinery cost:
443.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
791.00Lakhs
Add To Inquiry Basket
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector

 

Allo... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)

Milk... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry

Bamboo toothbrushes Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Profitable Business Industry of  Electric Motors
Profitable Business Industry of Electric Motors

 

An e... Read More

Capacity :
5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1
Plant and Machinery cost:
467.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
3949.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Carbonated Health Drinks
Investment Opportunities in Carbonated Health Drinks

 

Carb... Read More

Capacity :
Carbonated Health Drinks Size 250 ml 8,000 Packs Per Day Carbonated Health Drinks Size 330 ml 4,000
Plant and Machinery cost:
49.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
299.00Lakhs
Add To Inquiry Basket
Business Industry of  Stone Plastic Composite (SPC) Flooring Tiles
Business Industry of Stone Plastic Composite (SPC) Flooring Tiles

 

Stone plastic com... Read More

Capacity :
Stone Plastic Composite (SPC) Flooring Tiles 3,000 Sq,mtr Per Day
Plant and Machinery cost:
408.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
1011.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Waste Lubricating Oil  Recycling Plant
Investment Opportunities in Waste Lubricating Oil Recycling Plant

 

Waste oil is made... Read More

Capacity :
Used Lubricating Oil 20,000 Ltrs per day Spent Clay as by product 2,105 Ltrs per day
Plant and Machinery cost:
127.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
753.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping  and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

 

The disassembly o... Read More

Capacity :
1000 Vehicles per Month
Plant and Machinery cost:
497.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2090.00Lakhs
Add To Inquiry Basket
Azodicarbonamide Using Urea and Hydrazine Hydrate
Azodicarbonamide Using Urea and Hydrazine Hydrate

 

The chemical comp... Read More

Capacity :
Azodicarbonamide Powder 40 MT Per Day Ammonia 10.6 MT Per Day Hydrochloric Acid (38% Conc.) 20.1 MT
Plant and Machinery cost:
1951.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3109.00Lakhs
Add To Inquiry Basket
Rising Demand of  Rice Husk based Biodegradable Cutlery
Rising Demand of Rice Husk based Biodegradable Cutlery

 

People have been ... Read More

Capacity :
Biodegradable Cutlery (Per Set 6 Pcs. Flatware) 1,852 Sets per day
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
Profitable Business of Magnesium Sulphate
Profitable Business of Magnesium Sulphate

Magnesium sulphate is an inorganic salt with the formula MgSO4 Read More

Capacity :
72 MT Per Day
Plant and Machinery cost:
256.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
900.00Lakhs
Add To Inquiry Basket
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)

Grain processing, as exempli... Read More

Capacity :
Moong Dal 1 MT Per Day Masur Dal 1 MT Per Day Toor Dal 1.5 MT Per Day Chana Dal 1 MT Per Day Kabul
Plant and Machinery cost:
63.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
165.00Lakhs
Add To Inquiry Basket
Setting up a Multispeciality Hospital (200 Bedded)
Setting up a Multispeciality Hospital (200 Bedded)

A hospital is a health care institution providing patient treatment with specialized m... Read More

Capacity :
200 Bedded Hospital
Plant and Machinery cost:
14000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
21248.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Aluminium Ingots from Aluminium Scrap
Start Manufacturing of Aluminium Ingots from Aluminium Scrap

Aluminum, is a light weight,... Read More

Capacity :
Aluminium Alloy Ingots14 MT per day Aluminium Scrap 0.23 MT per day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
3315.00Lakhs
Add To Inquiry Basket
Calcium Sennosides from Senna Leaves Production Business Plan
Calcium Sennosides from Senna Leaves Production Business Plan

Calcium Sennoside are the m... Read More

Capacity :
400 Kgs per Day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
607.00Lakhs
Add To Inquiry Basket
30 Bedded Hospital Business Plan
30 Bedded Hospital Business Plan

A hospital is supposed to treat patients suffering from various ailments. Doctors with their dedicated spirit serve the nation at large by providin... Read More

Capacity :
Special Ward Patients : 2 Patients / Day General Ward Patients: 16 Patients / Day Double Bedded Pati
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
604.00Lakhs
Add To Inquiry Basket
Construction Opportunities in Geotextiles for Roadways
Construction Opportunities in Geotextiles for Roadways

Geotextiles were used in roadway construction to stabilize roadways and their edges. These early geotextiles were made from natural fibres, fabrics... Read More

Capacity :
Geotextiles for Road & Construction: 2,934 Kgs / Day
Plant and Machinery cost:
326.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
665.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured

Nitrile gloves are a kind of disposable gloves made up of rubber, this suggests there's no risk of latex allergies. Th... Read More

Capacity :
Disposable Nitrile Gloves (Powder Free): 500,000 Pcs. / Day
Plant and Machinery cost:
1321.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2890.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)

Active pharmaceutical ingredients are the active substances that are utilized in the manufacture of a drug and have a ... Read More

Capacity :
Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500
Plant and Machinery cost:
155.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
729.00Lakhs
Add To Inquiry Basket
Castor Oil from Castor Seeds Manufacturing Business
Castor Oil from Castor Seeds Manufacturing Business

The castor oil plant, Ricin us common is, may be a species of flowering plant within the spurge family, Euphorbiaceous... Read More

Capacity :
Castor Oil: 5 MT / Day Castor De-Oiled Cake: 7.2 MT / Day
Plant and Machinery cost:
106.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
374.00Lakhs
Add To Inquiry Basket
Surgical & N95 Mask Manufacturing Business Plan
Surgical & N95 Mask Manufacturing Business Plan

A surgical mask, also referred to as a procedure mask, medical mask or just as a face mask, is meant to be worn by health professionals during surg... Read More

Capacity :
Surgical Face Masks (each Pkts = 25 Pcs.): 576 Pkts / Day N95 Face Masks (each Pkts = 5 Pcs.): 2,880
Plant and Machinery cost:
359.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
717.00Lakhs
Add To Inquiry Basket
Earthmover JCB Bucket Pin Manufacturing and JCB Tooth Nuts, Bolt and Pin Bush
Earthmover JCB Bucket Pin Manufacturing and JCB Tooth Nuts, Bolt and Pin Bush

JCB range of Excavators is the best-in-class, which includes a wide array of large, mid & mini Excavators in the r... Read More

Capacity :
JCB Bucket Pin 42 mm Diameter : 1,666.7 Kgs / Day JCB Bucket Pin Bush : 1,666.7 Kgs / Day JCB Bucke
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
418.00Lakhs
Add To Inquiry Basket
Urea Fertilizer- Start Business in Fertilizer Industry
Urea Fertilizer- Start Business in Fertilizer Industry

Fertilizers provide three primary nutrients: Nitrogen (N), Phosphorus (P) and Potassium (K). Nitrogen supports vegetat... Read More

Capacity :
Urea Fertilizer: 972.2 MT / Day
Plant and Machinery cost:
4320.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
15110.00Lakhs
Add To Inquiry Basket
Manufacturing of Gum Arabic (Gum Acacia)
Manufacturing of Gum Arabic (Gum Acacia)

Gum Arabic, also referred to as gum acacia, may be a natural gum harvested from the o... Read More

Capacity :
Arabic Gum (Talha): 6.73 MT / Day
Plant and Machinery cost:
296.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
535.00Lakhs
Add To Inquiry Basket
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates

 

Eco-Friendly Bamboo Ba... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Ideas in Production of Disposable IV Set
Business Ideas in Production of Disposable IV Set

 

Business Ideas in Production of Disposable I... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Woven PP Cement Sacks
Production of Woven PP Cement Sacks

 

Woven polypropylene bags are ideal for transporting and packing bulk goods. Weaved polypropylene bags are th... Read More

Capacity :
PP Woven Sacks (for Cement Bag 50 Kgs Size):258000 Nos/ day PP Woven Jumboo Sacks (for Cement Bag 15
Plant and Machinery cost:
566.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
891.00Lakhs
Add To Inquiry Basket
Vitamin ‘C’ Manufacturing from Sorbitol
Vitamin ‘C’ Manufacturing from Sorbitol

 

Vitamin C is the simplest of the vitamins chemically, and as a result, it was one of the first to be extract... Read More

Capacity :
600 kg/day
Plant and Machinery cost:
371.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
717.00Lakhs
Add To Inquiry Basket
Start A Single Wall Steel Water Bottle Manufacturing Business
Start A Single Wall Steel Water Bottle Manufacturing Business

 

Water bottles come in a variety of shapes, colours, and sizes. A cord is attached to the stainless steel con... Read More

Capacity :
2,000 Nos/ day
Plant and Machinery cost:
138.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
439.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
12345678910...

Showing 121 - 180 of 2609 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR