• 0

Project Consultancy, Reports & Profiles

Telangana is a state in the Southern region of India. It has an area of 114,840 km2 and is the twelfth largest state in India. Most of it was part of the princely state of Hyderabad, ruled by the Nizam of Hyderabad during the British Raj, joining the Union of India in 1948. Telangana was separated from Andhra Pradesh as a new 29th state of India, with the city of Hyderabad as its capital. Hyderabad will continue to serve as the joint capital city for Andhra Pradesh and Telangana for a period of not more than ten years. Telangana is situated on the Deccan Plateau, in the central stretch of the eastern seaboard of the Indian Peninsula. It covers 114,800 square kilometers (44,300 sq. mi). The region is drained by two major rivers, with about 79% of the Godavari River catchment area and about 69% of the Krishna River catchment area, but most of the land is arid. Telangana region has rich natural resources. About 45 per cent of the forest area in Andhra Pradesh state is in Telangana region while 20 per cent of the country's coal deposits in the country are also found here. Telangana is also rich in limestone deposits that cater to cement factories. Telangana has other mineral resources like bauxite and mica. Perennial rivers Godavari and Krishna enter Andhra Pradesh in Telangana before flowing down through other regions and ending up in the Bay of Bengal. Telangana region is sitting on potential oil and natural gas reserves, according to a report by Director General of Hydrocarbons (DGH). Telangana has a significant amount of Software export in India. While majority of the Industry is concentrated over Hyderabad, the other cities are also becoming significant IT destinations in the state. Hyderabad's IT exports exceeded $7 billion in 2014.There have been extensive investments in digital infrastructure.

 

AGRICULTURE

Rice is the major food crop and staple food of the state. Other important crops are tobacco, mango, cotton and sugar cane. Agriculture has been the chief source of income for the state's economy. Important rivers of India are the Godavari, Krishna flow through the state, providing irrigation. Telangana agriculture department separated from Andhra Pradesh as part of Andhra Pradesh bifurcation It aims promote agricultural trade and to boost up the agricultural production and productivity in the Telangana.

 

TOURISM IN TELANGANA

Telangana State Tourism Development Corporation (TSTDC) is a state government agency which promotes Tourism in Telangana. Telangana has a variety of tourist attractions including historical places, monuments, forts, water falls, forests and temples. Charminar, Golconda Fort, QutbShahi Tombs, Chowmahalla Palace, Falaknuma Palace and Bhongir Fort, are some of the monuments in the state. The Charminar, built in 1591 CE, is a monument and mosque located in Hyderabad, Telangana, India.

 

DEMOGRAPHIC PROFILE

Telangana with a population of 351.9 lakhs (according to the 2011 census) accounts for about 3.6% percent of the total population of India. Out of this, 177.0 lakhs (50.2%) are males and 174.9 lakhs (49.8%) are females. The sex ratio of the state is 988 as against the national figure of 943. The population density in the state is 307 persons/Sq.Km. In 2012-13, the services sector at Rs.  1, 14,046 crores, contributed 58.1% to the GSDP (at constant prices). It is followed by industry sector, contributing 27.9% (Rs. 54,687 crores) and the agriculture sector’s contribution of 14% (Rs. 27,450 crores). The services sector had fastest growth  of  11.31%  followed  by  industry  sector  (10.04%)  and  agriculture  sector  (6.89%) between 2004-05 and 2012-13.

The Telangana government has proposed to add 230 crore plants in the next three years under a flagship programme which envisages boosting of tree cover in the state by nearly 8%.

 

FOOD AND INDUSTRIAL PROCESSING SECTOR

The Telangana government plans to put greater emphasis on value-addition in the farm sector in its industrial policy. The departments of industry and commerce, agriculture and agro marketing would coordinate together to achieve value maximization for farmers. The government is also keen on encouraging e-marketing activities, which involves networking all agriculture mandis in the state so that farmers get access to prevailing prices across important markets and thereby helping them unlock the right value for their produce. The state in collaboration with research institutes in the country would facilitate an ideal adoption of latest practices ranging from seed technology and farm machinery to improve farm productivity. the state government is also considering specific projects such as setting up a pharmaceutical city near Hyderabad and a cotton hub in Warangal district, the largest producer of long-staple cotton. The Telangana government has begun a survey to identify land that can be offered to new industries in the state. The Telangana government is set to announce its new industrial policy under which scheduled castes and scheduled tribe entrepreneurs would be specially encouraged.

Telangana Government is mulling to set up a 'Pharma City' near the state capital in about 8,000 acres. The City will include industries as well as residential colony, and a power plant with 500 MW capacity will be set up adjacent to the pharma city to provide captive, dedicated and uninterrupted power supply to the industry. The pharma city is expected to accommodate about five lakh employees besides their families in the residential colony touching about twenty lakh over a period. Delegation of Drugs Manufacturers' Association that an international consultancy organisation with expertise in developing in the information technology and pharmaceuticals manufacturing sectors may become backbone of Telangana economy, leaving power production, ports and oil and natural gas to play a pivotal role in driving prosperity in the residuary state. Industrial estates should be contacted to design the pharma city. Telangana's per capita income of Rs 24,409 in 2004-05 has phenomenally grown to a whopping Rs 83,020. While Hyderabad has less number of households using open toilets at 0.9 per cent, Mahabubnagar is at 71.1 per cent. The land-locked state is expected to have nearly Rs 4,000 crore surplus budget, but lingering power deficit may force the new government to spend more on the power purchase. Telangana, spread in 1,14,840 square kilometres, has 66.46 per cent literacy rate with a population of 3.52 crore.

 

ECONOMY OF TELAGANA

The Economy of Telangana is mainly driven by agriculture. Two important rivers of India, the Godavari and Krishna, flow through the state, providing irrigation. Rice, cotton, mango and tobacco are the local crops. Recently, crops used for vegetable oil production such as sunflower and peanuts have gained favour. There are many multi-state irrigation projects in development, including Godavari River Basin Irrigation Projects and NagarjunaSagar Dam, the world's highest masonry dam. Telangana is a mineral-rich state, with coal reserves at SingaerniColleries. The population of Telangana is over 35 million now – much more than 30 million for the whole of Andhra Pradesh, including Telangana, at the time of its formation in 1956. The demands on governance have multiplied over this half a century. Apart from commitment to the development of the region, a smaller state being more easily accessible to the common people can intelligently and speedily grapple with their problems.

 

INDUSTRIAL POLICY FRAMEWORK FOR STATE OF TELANGANA

Industrialization will be the key strategy followed for economic growth and development for Telangana, the 29th state of the country. People of the new state have very high expectations from the Telangana State Government for creating jobs for the youth, promote development of backward areas, maximize growth opportunities by optimum utilization of the available resources, harness the talents and skills of the people etc. The Government of Telangana State realizes that industrial development requires large-scale private sector participation, with the government playing the role of a facilitator and a catalyst. The government is committed to provide a graft-free, hassle-free environment in which the entrepreneurial spirit of local, domestic and international investors will thrive to take up their industrial units in the state of Telangana as the preferred investment destination.

The new Telangana State Industrial Policy will be rooted in certain core values, as follows:

 

                • The Government regulatory framework shall facilitate industrial growth

                • Entrepreneurs will thrive in a peaceful, secure and progressive business regulatory                                        environment

                • Industrial development will lead to massive creation of jobs benefitting local youth

                • Industrialization shall be inclusive and facilitate social equality

 

The new Telangana State Industrial Policy will strive to provide a framework which will not only stabilize and make existing industries more competitive, but also attract and realize new international and national investments in the industrial sector. It is expected that the most significant outcome of this approach will be the production of high quality goods at the most competitive price, which establishes “Made in Telangana-Made in India” as a brand with high global recognition. The Industrial Policy Framework has the following mandate for departments that have any responsibility in the industrialization of the State—Minimum Inspection and Maximum Facilitation.

The Government of Telangana State is determined to create an ecosystem in which the ease of doing business in the state matches and even exceeds the best global standards. Telangana State Government is aware that offering a hassle-free system is considered to be of the highest priority by the industrialists, and accordingly the government will implement a very effective industrial clearance system that will go beyond the traditional single window system.

 

THRUST AREAS AND CORE SECTORS

•             Life Sciences including, bulk drugs, formulations, vaccines, nutraceuticals, biological,   incubation centers, R&D facilities and medical equipment.

•             IT Hardware including bio-medical devices, electronics, cellular communications.

•             Precision engineering, including aviation, aerospace, defence.

•             Food processing and nutrition products including dairy, poultry, meat and fisheries.

•             Automobiles, Transport Vehicles, Auto-components, Tractors and Farm Equipment.

•             Textiles and Apparel, Leather and leather value added products like shoes, purses, bags,         artificial   material infused and coated textiles, paper and paper products.

•             Plastics and Polymers, Chemicals and Petro-chemical, glass and ceramics.

•             FMCG and Domestic Appliances.

•             Engineering and Capital Goods, including castings, foundry and Ferro-alloys and other    metallurgical industries.

•             Waste Management and Green Technologies.

•             Renewable Energy and Solar Parks.

•             Mineral-based and wood-based Industries.

•             Transportation/Logistic Hub/Inland Port/Container Depot.

 

Telangana has emerged as a State that provides that right climate for the growth of IT business and is now one of the most preferred destinations in the Country.

The State of Telangana is poised towards creating a benchmark in Information & Communication Technology (ICT) endowed with a high quality state-of-the-art physical & communication infrastructure of international standards, harnessed human resources, and proactive business friendly policies of the Government.

It is estimated that about 20 lakh acres of land is available in the state that has been identified as unfit for cultivation in Telangana. Based on a detailed survey of these land parcels and identification of those parcels that are fit for industrial use, an industrial land bank for the State of Telangana will be developed.

The development of industrial and related infrastructure will be the responsibility of the Telangana State Industrial Infrastructure Corporation (TSIIC). The financial base of the TSIIC will be strengthened and it will be made to function as an effective organization. All lands in the State identified as fit for industrial use will be transferred to the TSIIC.

To support industrialization, the Government of Telangana will earmark 10% of water from all existing and new irrigation sources for industrial use. Water pipelines will be laid as a part of infrastructure creation for each industrial park by TSIIC. The Government of Telangana State recognizes that quality power and uninterrupted power supply are keys to the growth of the industrial sector. The State has a clear short-, medium-, and long-term plans to first overcome the power shortage and eventually become a power surplus state. Accordingly, uninterrupted power supply will be arranged in each industrial park. The Telangana State Government will encourage usage of non-conventional energy for industrial purposes.

The Telangana State Government is committed to encourage the process of industrialization by making various kinds of incentives available to the entrepreneurs. The Telangana State Government also assures an entrepreneur-friendly and graft-free regime of disbursing the incentives. The Telangana State Government will consider providing incentives to the entrepreneurs in the following areas-

•             Stamp duty reimbursement

•             Land conversion cost

•             Investment subsidy

•             VAT reimbursement

•             Interest subsidy

•             Clean production measures

•             Reimbursement of infrastructure development costs etc.

A sound industrial policy has to ensure that the state taxation structure is conducive to industrial growth and state financial resource augmentation. Distortions in the tax structure leads to evasion of taxes and clandestine transport of industrial inputs and outputs to neighbouring states, which may have advantageous tax rates. The presence of important national and state highways, coupled with the availability of resources and opportunities, provides a great potential for development of industrial corridors in the state along these roadways.

The Industrial Corridors that will be developed initially will be:

 

1) Hyderabad-Warangal Industrial Corridor

2) Hyderabad-Nagpur Industrial Corridor

3) Hyderabad-Bengaluru Industrial Corridor

The new Industrial Policy brought out by the Government of Telangana promises to revolutionise the way industrial sector has been viewed by successive governments in this country. A day is not far when the new Industrial Policy of Telangana will shine as an exemplar among the best in the world.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Manufacturing Business Of Polyacrylamide
Manufacturing Business Of Polyacrylamide

In many industrial and envi... Read More

Capacity :
Polyacrylamide Liquid 50% Solution 200 MT Per Day
Plant and Machinery cost:
2247.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4304.00Lakhs
Add To Inquiry Basket
Start Production of Zinc Chloride
Start Production of Zinc Chloride

 

An inorganic subs... Read More

Capacity :
Zinc Chloride from Zinc Ash 2,700 MT Per Annum Zinc Chloride from Zinc Oxide 300 MT Per Annum
Plant and Machinery cost:
229.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
751.00Lakhs
Add To Inquiry Basket
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam

A wide range of food processing operations are consolidated under o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant Of Aluminium from Bauxite
Setup Plant Of Aluminium from Bauxite

Aluminium is a lightweight ... Read More

Capacity :
Aluminium Ingot 10 MT Per Day
Plant and Machinery cost:
818.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2280.00Lakhs
Add To Inquiry Basket
Setup Unit Of Menthol Crystals From Mint Oil
Setup Unit Of Menthol Crystals From Mint Oil

Menthol crystals are a type of organic compound that have a cooling, minty aroma. The... Read More

Capacity :
Menthol Crystals 300,000 Kg. Per Annum Dementholised Oil (DMO) 100,000 Kg. Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
701.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Sulphate (Anhydrous)
A Business Plan For Sodium Sulphate (Anhydrous)

Sodium sulfate, also known as sodium sulphate, is a white crystalline compound with t... Read More

Capacity :
Sodium Sulphate (Anhydrous) 10 MT Per Day HCl 32% 15 MT Per Day
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Copper Flats & Copper Tubes
Start Manufacturing Business Copper Flats & Copper Tubes

Copper flats and copper tub... Read More

Capacity :
Copper Flats or Sections 2,000 MT Per Annum Copper Tubes 1,600 MT Per Annum Copper Scraps 55 MT P
Plant and Machinery cost:
353.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1333.00Lakhs
Add To Inquiry Basket
Set up Dry Yeast For Bakery and Alcohol Industry
Set up Dry Yeast For Bakery and Alcohol Industry

 

Dry yeast is a ty... Read More

Capacity :
Dry Yeast 5,000 Kgs per day
Plant and Machinery cost:
1080.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1703.00Lakhs
Add To Inquiry Basket
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)

Fishing Net to Pellet refers to the innovative process of rec... Read More

Capacity :
Hdpe/Pvc/Nylon/Hdpe Pellet 2,000 MT Per Annum
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Setup Unit Of Animal Feed From Bagasse
Setup Unit Of Animal Feed From Bagasse

Animal feed from bagasse re... Read More

Capacity :
Animal Feed 100 MT Per Day
Plant and Machinery cost:
125.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1320.00Lakhs
Add To Inquiry Basket
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil

Bottling of refined oil refers to the process of packaging hi... Read More

Capacity :
-
Plant and Machinery cost:
402.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1975.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Manganese From Manganese Ore
Start Manufacturing Business Manganese From Manganese Ore

Manganese is a chemical ele... Read More

Capacity :
Manganese Ingot 10 MT Per Day
Plant and Machinery cost:
666.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2192.00Lakhs
Add To Inquiry Basket
Soda Ash Market of Middle East and North Africa (MENA)
Soda Ash Market of Middle East and North Africa (MENA)

Sodium carbonate, often known as soda ash, is a whit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Calcium Silicate Blocks
Start Production Of Calcium Silicate Blocks

 

Calcium silicate ... Read More

Capacity :
Calcium Silicate Blocks 100 Sq.Mt. Per Day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
408.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity :
L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost:
867.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity :
Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity :
Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity :
Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost:
355.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
3101.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Carbon Composite Bicycle
Start Manufacturing Of Carbon Composite Bicycle

Carbon composite bicycles a... Read More

Capacity :
Carbon Composite Bicycle 12 Nos per Day
Plant and Machinery cost:
413.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
594.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Latex Toy Balloons
Start Manufacturing Of Latex Toy Balloons

Latex toy balloons are flexible, inflatable objects made prim... Read More

Capacity :
Latex Toy Balloons 20,000 PKTS per Day
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
883.00Lakhs
Add To Inquiry Basket
Setup Plant Of Craft Beer
Setup Plant Of Craft Beer

 

Craft beer is a t... Read More

Capacity :
-
Plant and Machinery cost:
1519.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
4060.00Lakhs
Add To Inquiry Basket
Start Production Of Ammonium Nitrate
Start Production Of Ammonium Nitrate

 

Are you an entrepreneur looking for... Read More

Capacity :
Ammonium Nitrate 2 MT per Day
Plant and Machinery cost:
53.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
215.00Lakhs
Add To Inquiry Basket
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)
Start Silicon Wafers Business From Electronic Grade Silicon Ingots (Using Metallurgical Grade Silicon)

 

Silicon wafers are crucial componen... Read More

Capacity :
Silicon Wafers 20 MT Per Day
Plant and Machinery cost:
2505.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
4235.00Lakhs
Add To Inquiry Basket
A Business Plan For Recycling of Lithium Ion Battery
A Business Plan For Recycling of Lithium Ion Battery

Recycling of lithium-ion batteries refers to the process of recovering valuable mater... Read More

Capacity :
-
Plant and Machinery cost:
189.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
468.00Lakhs
Add To Inquiry Basket
Setup Plant of Extraction from Tobacco Waste
Setup Plant of Extraction from Tobacco Waste

Nicotine is a chemical compound that is naturally present in the leaves of the tobacco plant. It is a powerful sti... Read More

Capacity :
-
Plant and Machinery cost:
289.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))
A Business Plan for Ferro Alloys (Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), Ferro Titanium (FeTi))

Low Carbon Ferrochrome (LCFC), Ferro Molybdenum (FeMo), Ferro Vanadium (FeV), and Fer... Read More

Capacity :
-
Plant and Machinery cost:
1783.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
9775.00Lakhs
Add To Inquiry Basket
Setup Egg Powder Industry
Setup Egg Powder Industry

Egg powder is essentially a... Read More

Capacity :
Egg Powder 2,400 Kgs Per Day
Plant and Machinery cost:
489.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
930.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Laundry Soap Bars
Start Manufacturing Business of Laundry Soap Bars

 

Laundry soap bars... Read More

Capacity :
Laundry Soap 1,000 Kgs Per Day (1 Kgs Pack 10 Pcs. each 100gms Size)
Plant and Machinery cost:
27.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
65.00Lakhs
Add To Inquiry Basket
Start Business of Solar Panel
Start Business of Solar Panel

 

Solar panels are the bac... Read More

Capacity :
Solar Panel 19,980 KW Per Annum
Plant and Machinery cost:
160.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
581.00Lakhs
Add To Inquiry Basket
A Business Plan for Calcium Gluconate
A Business Plan for Calcium Gluconate

Calcium Gluconate is a chemical compound that serves as a crucial supplement for thos... Read More

Capacity :
Calcium Gluonate 20 MT Per Day
Plant and Machinery cost:
293.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
1130.00Lakhs
Add To Inquiry Basket
Start Business of Steel Containers (Cargo Containers)
Start Business of Steel Containers (Cargo Containers)

 

Explore the robust world of steel cargo containers used globally for shipping, storage, and modular construc... Read More

Capacity :
Cargo Containers (Size 20 Feet) 40,000 Nos Per Annum
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3105.00Lakhs
Add To Inquiry Basket
A Business Plan for Latex Mattress
A Business Plan for Latex Mattress

Latex Mattresses are distinguished by their core material, which is derived from the sap of the rubber tree (Hevea bra... Read More

Capacity :
Latex Mattress Size: 75 x 72 x 5 inch 90 Nos. Per Day
Plant and Machinery cost:
204.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
626.00Lakhs
Add To Inquiry Basket
Opportunity in Spices Business (Red Chili, Turmeric, Coriander, Cumin & Garam Masala)
Opportunity in Spices Business (Red Chili, Turmeric, Coriander, Cumin & Garam Masala)

Spices are naturally occurring substances derived from parts of plants such as seeds, fruits, roots... Read More

Capacity :
-
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
418.00Lakhs
Add To Inquiry Basket
Start Prodcution of Poultry Farming with Manure Treatment & Egg Tray Production
Start Prodcution of Poultry Farming with Manure Treatment & Egg Tray Production


Th... Read More

Capacity :
-
Plant and Machinery cost:
324.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
684.00Lakhs
Add To Inquiry Basket
Setup Coking Coal Washing Unit
Setup Coking Coal Washing Unit

 

Coking coal w... Read More

Capacity :
Coal Washing (Job Work) 5,000 MT Per Day By Product (Waste Coal) 1,000 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
6000.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Silicate from Silica and Soda Ash
A Business Plan For Sodium Silicate from Silica and Soda Ash

Sodium silicate, commonly known as water glass, is a versatile compound with applications acros... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
1.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
1.00 Lakhs
Cost of Project :
808.00Lakhs
Add To Inquiry Basket
Production of Sodium Hypochlorite
Production of Sodium Hypochlorite

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
India High Silica Quartz Grit Market
India High Silica Quartz Grit Market

High silica quartz is a type of quartz that contains at least 97% SiO2. It is one of the most abundant minerals on Ear... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Packaged Drinking Water From Deep Sea Water
A Business Plan For Packaged Drinking Water From Deep Sea Water

 

Packaged drinking water means water derived from s... Read More

Capacity :
Packaged Drinking Water 80,000 Bottles per day
Plant and Machinery cost:
179.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1204.00Lakhs
Add To Inquiry Basket
Start a Business of Double Wall Corrugated Pipes
Start a Business of Double Wall Corrugated Pipes

Double wall corrugated (DWC) pipes are made from high-densit... Read More

Capacity :
Double Wall Corrugated Pipes 20 MT Per Day
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1271.00Lakhs
Add To Inquiry Basket
Set A Paint Rollers Manufacturing Business
Set A Paint Rollers Manufacturing Business

Paint rollers are one of the best ways to get a professional... Read More

Capacity :
Paint Roller 8,000 Pcs Per Day
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
227.00Lakhs
Add To Inquiry Basket
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

 

Bagasse is primarily found in countries that produ... Read More

Capacity :
Biodegradable Disposable Cups 555.5 Th. Pcs Per Day Biodegradable Disposable Plates 312.5 Th. Pcs Pe
Plant and Machinery cost:
1924.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2789.00Lakhs
Add To Inquiry Basket
Fatty Alcohol Manufacturing Business Plan
Fatty Alcohol Manufacturing Business Plan

Fatty alcohols, also known as aliphatic alcohols, are slight... Read More

Capacity :
Fatty Alcohol 40 MT Per Day By Product (RBD) Palm Oil 45 MT Per Day
Plant and Machinery cost:
800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Start a Production Business of Rubber Granules from Waste Tyre  Time to Start Your Own Production Business of Rubber Granules from Waste Tyre
Start a Production Business of Rubber Granules from Waste Tyre Time to Start Your Own Production Business of Rubber Granules from Waste Tyre

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of uPVC and CPVC Pipes
Manufacturing Business of uPVC and CPVC Pipes

PVC material is used to cre... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas

A sort of alcoholic beverage created from bananas is called Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Triacetin
Manufacturing Business Of Triacetin

 

Triacetin, also k... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
2206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3524.00Lakhs
Add To Inquiry Basket
Set Up E-Waste Recycling Plant
Set Up E-Waste Recycling Plant

 

If you haven&rsqu... Read More

Capacity :
1,41,000 Kgs per annum 1,05,900 Kgs per annum 88,200 Kgs per annum 18,000 Kgs per annum 5.760
Plant and Machinery cost:
107.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan Of ISO Freight Containers Manufacturing
Business Plan Of ISO Freight Containers Manufacturing

The industry standard for shipping is ISO Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder

Although ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setting up Aluminium Cans for Beverages (Two Pieces) Business
Setting up Aluminium Cans for Beverages (Two Pieces) Business

 

Aluminium cans are one of the most popular con... Read More

Capacity :
Aluminium Cans for Beverages Each 330 ml Size: 3,450 Lakh Pcs per Annum
Plant and Machinery cost:
2605.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
7760.00Lakhs
Add To Inquiry Basket
Startup Business of Sorbitol
Startup Business of Sorbitol

Sorbitol is a sugar alcohol... Read More

Capacity :
Sorbitol 3,000 MT Per Annum
Plant and Machinery cost:
58.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
575.00Lakhs
Add To Inquiry Basket
Production Business uPVC and CPVC Pipes
Production Business uPVC and CPVC Pipes

UPVC is a type of plastic p... Read More

Capacity :
CPVC Pipes 50 mm 1,200 MT Per Annum uPVC Pipes 150 mm 2,400 MT
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
714.00Lakhs
Add To Inquiry Basket
Setup IV Fluid (FFS Technology) Business
Setup IV Fluid (FFS Technology) Business

IV fluid is a watery soluti... Read More

Capacity :
0
Plant and Machinery cost:
4205.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
5770.00Lakhs
Add To Inquiry Basket
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese Production Business
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese Production Business

 

Ferroalloys are alloys consisting of a combina... Read More

Capacity :
0
Plant and Machinery cost:
15692.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
24627.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
A Business Plan for Ferri... Ferric Pyrophosphate 600 MT Per Annum 31.00 133.00
How to Start A Business o... 0 0.00 0.00
A Business Plan for Seawo... Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum 28.00 2040.00
Setup Extraction of Salt ... Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum 29.00 2776.00
A business Plan For Surgi... Surgical Sutures: 450,000 Boxes per annum 27.00 877.00
Starting up production of... Glycerol Monostearate: 900 MT Per Annum 29.00 320.00
Startup A Business of Dou... 0 0.00 0.00
Now Is The Time To Take C... 0 0.00 0.00
Start Production of Potat... Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum 30.00 121.00
Setup Cashew Nut Processi... Cashew Nut Processing: 4,794 Kgs Per Day 23.00 1100.00
Start a Business of Parti... Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum 30.00 1100.00
A Business Plan for Wood ... Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum 27.00 790.00
Start a Production Of Sod... Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum 14.00 1265.00
12345678910...
« Back21 22 23 24 25Next »

Showing 1441 - 1500 of 2846 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR