• 0

Project Consultancy, Reports & Profiles

Telangana is a state in the Southern region of India. It has an area of 114,840 km2 and is the twelfth largest state in India. Most of it was part of the princely state of Hyderabad, ruled by the Nizam of Hyderabad during the British Raj, joining the Union of India in 1948. Telangana was separated from Andhra Pradesh as a new 29th state of India, with the city of Hyderabad as its capital. Hyderabad will continue to serve as the joint capital city for Andhra Pradesh and Telangana for a period of not more than ten years. Telangana is situated on the Deccan Plateau, in the central stretch of the eastern seaboard of the Indian Peninsula. It covers 114,800 square kilometers (44,300 sq. mi). The region is drained by two major rivers, with about 79% of the Godavari River catchment area and about 69% of the Krishna River catchment area, but most of the land is arid. Telangana region has rich natural resources. About 45 per cent of the forest area in Andhra Pradesh state is in Telangana region while 20 per cent of the country's coal deposits in the country are also found here. Telangana is also rich in limestone deposits that cater to cement factories. Telangana has other mineral resources like bauxite and mica. Perennial rivers Godavari and Krishna enter Andhra Pradesh in Telangana before flowing down through other regions and ending up in the Bay of Bengal. Telangana region is sitting on potential oil and natural gas reserves, according to a report by Director General of Hydrocarbons (DGH). Telangana has a significant amount of Software export in India. While majority of the Industry is concentrated over Hyderabad, the other cities are also becoming significant IT destinations in the state. Hyderabad's IT exports exceeded $7 billion in 2014.There have been extensive investments in digital infrastructure.

 

AGRICULTURE

Rice is the major food crop and staple food of the state. Other important crops are tobacco, mango, cotton and sugar cane. Agriculture has been the chief source of income for the state's economy. Important rivers of India are the Godavari, Krishna flow through the state, providing irrigation. Telangana agriculture department separated from Andhra Pradesh as part of Andhra Pradesh bifurcation It aims promote agricultural trade and to boost up the agricultural production and productivity in the Telangana.

 

TOURISM IN TELANGANA

Telangana State Tourism Development Corporation (TSTDC) is a state government agency which promotes Tourism in Telangana. Telangana has a variety of tourist attractions including historical places, monuments, forts, water falls, forests and temples. Charminar, Golconda Fort, QutbShahi Tombs, Chowmahalla Palace, Falaknuma Palace and Bhongir Fort, are some of the monuments in the state. The Charminar, built in 1591 CE, is a monument and mosque located in Hyderabad, Telangana, India.

 

DEMOGRAPHIC PROFILE

Telangana with a population of 351.9 lakhs (according to the 2011 census) accounts for about 3.6% percent of the total population of India. Out of this, 177.0 lakhs (50.2%) are males and 174.9 lakhs (49.8%) are females. The sex ratio of the state is 988 as against the national figure of 943. The population density in the state is 307 persons/Sq.Km. In 2012-13, the services sector at Rs.  1, 14,046 crores, contributed 58.1% to the GSDP (at constant prices). It is followed by industry sector, contributing 27.9% (Rs. 54,687 crores) and the agriculture sector’s contribution of 14% (Rs. 27,450 crores). The services sector had fastest growth  of  11.31%  followed  by  industry  sector  (10.04%)  and  agriculture  sector  (6.89%) between 2004-05 and 2012-13.

The Telangana government has proposed to add 230 crore plants in the next three years under a flagship programme which envisages boosting of tree cover in the state by nearly 8%.

 

FOOD AND INDUSTRIAL PROCESSING SECTOR

The Telangana government plans to put greater emphasis on value-addition in the farm sector in its industrial policy. The departments of industry and commerce, agriculture and agro marketing would coordinate together to achieve value maximization for farmers. The government is also keen on encouraging e-marketing activities, which involves networking all agriculture mandis in the state so that farmers get access to prevailing prices across important markets and thereby helping them unlock the right value for their produce. The state in collaboration with research institutes in the country would facilitate an ideal adoption of latest practices ranging from seed technology and farm machinery to improve farm productivity. the state government is also considering specific projects such as setting up a pharmaceutical city near Hyderabad and a cotton hub in Warangal district, the largest producer of long-staple cotton. The Telangana government has begun a survey to identify land that can be offered to new industries in the state. The Telangana government is set to announce its new industrial policy under which scheduled castes and scheduled tribe entrepreneurs would be specially encouraged.

Telangana Government is mulling to set up a 'Pharma City' near the state capital in about 8,000 acres. The City will include industries as well as residential colony, and a power plant with 500 MW capacity will be set up adjacent to the pharma city to provide captive, dedicated and uninterrupted power supply to the industry. The pharma city is expected to accommodate about five lakh employees besides their families in the residential colony touching about twenty lakh over a period. Delegation of Drugs Manufacturers' Association that an international consultancy organisation with expertise in developing in the information technology and pharmaceuticals manufacturing sectors may become backbone of Telangana economy, leaving power production, ports and oil and natural gas to play a pivotal role in driving prosperity in the residuary state. Industrial estates should be contacted to design the pharma city. Telangana's per capita income of Rs 24,409 in 2004-05 has phenomenally grown to a whopping Rs 83,020. While Hyderabad has less number of households using open toilets at 0.9 per cent, Mahabubnagar is at 71.1 per cent. The land-locked state is expected to have nearly Rs 4,000 crore surplus budget, but lingering power deficit may force the new government to spend more on the power purchase. Telangana, spread in 1,14,840 square kilometres, has 66.46 per cent literacy rate with a population of 3.52 crore.

 

ECONOMY OF TELAGANA

The Economy of Telangana is mainly driven by agriculture. Two important rivers of India, the Godavari and Krishna, flow through the state, providing irrigation. Rice, cotton, mango and tobacco are the local crops. Recently, crops used for vegetable oil production such as sunflower and peanuts have gained favour. There are many multi-state irrigation projects in development, including Godavari River Basin Irrigation Projects and NagarjunaSagar Dam, the world's highest masonry dam. Telangana is a mineral-rich state, with coal reserves at SingaerniColleries. The population of Telangana is over 35 million now – much more than 30 million for the whole of Andhra Pradesh, including Telangana, at the time of its formation in 1956. The demands on governance have multiplied over this half a century. Apart from commitment to the development of the region, a smaller state being more easily accessible to the common people can intelligently and speedily grapple with their problems.

 

INDUSTRIAL POLICY FRAMEWORK FOR STATE OF TELANGANA

Industrialization will be the key strategy followed for economic growth and development for Telangana, the 29th state of the country. People of the new state have very high expectations from the Telangana State Government for creating jobs for the youth, promote development of backward areas, maximize growth opportunities by optimum utilization of the available resources, harness the talents and skills of the people etc. The Government of Telangana State realizes that industrial development requires large-scale private sector participation, with the government playing the role of a facilitator and a catalyst. The government is committed to provide a graft-free, hassle-free environment in which the entrepreneurial spirit of local, domestic and international investors will thrive to take up their industrial units in the state of Telangana as the preferred investment destination.

The new Telangana State Industrial Policy will be rooted in certain core values, as follows:

 

                • The Government regulatory framework shall facilitate industrial growth

                • Entrepreneurs will thrive in a peaceful, secure and progressive business regulatory                                        environment

                • Industrial development will lead to massive creation of jobs benefitting local youth

                • Industrialization shall be inclusive and facilitate social equality

 

The new Telangana State Industrial Policy will strive to provide a framework which will not only stabilize and make existing industries more competitive, but also attract and realize new international and national investments in the industrial sector. It is expected that the most significant outcome of this approach will be the production of high quality goods at the most competitive price, which establishes “Made in Telangana-Made in India” as a brand with high global recognition. The Industrial Policy Framework has the following mandate for departments that have any responsibility in the industrialization of the State—Minimum Inspection and Maximum Facilitation.

The Government of Telangana State is determined to create an ecosystem in which the ease of doing business in the state matches and even exceeds the best global standards. Telangana State Government is aware that offering a hassle-free system is considered to be of the highest priority by the industrialists, and accordingly the government will implement a very effective industrial clearance system that will go beyond the traditional single window system.

 

THRUST AREAS AND CORE SECTORS

•             Life Sciences including, bulk drugs, formulations, vaccines, nutraceuticals, biological,   incubation centers, R&D facilities and medical equipment.

•             IT Hardware including bio-medical devices, electronics, cellular communications.

•             Precision engineering, including aviation, aerospace, defence.

•             Food processing and nutrition products including dairy, poultry, meat and fisheries.

•             Automobiles, Transport Vehicles, Auto-components, Tractors and Farm Equipment.

•             Textiles and Apparel, Leather and leather value added products like shoes, purses, bags,         artificial   material infused and coated textiles, paper and paper products.

•             Plastics and Polymers, Chemicals and Petro-chemical, glass and ceramics.

•             FMCG and Domestic Appliances.

•             Engineering and Capital Goods, including castings, foundry and Ferro-alloys and other    metallurgical industries.

•             Waste Management and Green Technologies.

•             Renewable Energy and Solar Parks.

•             Mineral-based and wood-based Industries.

•             Transportation/Logistic Hub/Inland Port/Container Depot.

 

Telangana has emerged as a State that provides that right climate for the growth of IT business and is now one of the most preferred destinations in the Country.

The State of Telangana is poised towards creating a benchmark in Information & Communication Technology (ICT) endowed with a high quality state-of-the-art physical & communication infrastructure of international standards, harnessed human resources, and proactive business friendly policies of the Government.

It is estimated that about 20 lakh acres of land is available in the state that has been identified as unfit for cultivation in Telangana. Based on a detailed survey of these land parcels and identification of those parcels that are fit for industrial use, an industrial land bank for the State of Telangana will be developed.

The development of industrial and related infrastructure will be the responsibility of the Telangana State Industrial Infrastructure Corporation (TSIIC). The financial base of the TSIIC will be strengthened and it will be made to function as an effective organization. All lands in the State identified as fit for industrial use will be transferred to the TSIIC.

To support industrialization, the Government of Telangana will earmark 10% of water from all existing and new irrigation sources for industrial use. Water pipelines will be laid as a part of infrastructure creation for each industrial park by TSIIC. The Government of Telangana State recognizes that quality power and uninterrupted power supply are keys to the growth of the industrial sector. The State has a clear short-, medium-, and long-term plans to first overcome the power shortage and eventually become a power surplus state. Accordingly, uninterrupted power supply will be arranged in each industrial park. The Telangana State Government will encourage usage of non-conventional energy for industrial purposes.

The Telangana State Government is committed to encourage the process of industrialization by making various kinds of incentives available to the entrepreneurs. The Telangana State Government also assures an entrepreneur-friendly and graft-free regime of disbursing the incentives. The Telangana State Government will consider providing incentives to the entrepreneurs in the following areas-

•             Stamp duty reimbursement

•             Land conversion cost

•             Investment subsidy

•             VAT reimbursement

•             Interest subsidy

•             Clean production measures

•             Reimbursement of infrastructure development costs etc.

A sound industrial policy has to ensure that the state taxation structure is conducive to industrial growth and state financial resource augmentation. Distortions in the tax structure leads to evasion of taxes and clandestine transport of industrial inputs and outputs to neighbouring states, which may have advantageous tax rates. The presence of important national and state highways, coupled with the availability of resources and opportunities, provides a great potential for development of industrial corridors in the state along these roadways.

The Industrial Corridors that will be developed initially will be:

 

1) Hyderabad-Warangal Industrial Corridor

2) Hyderabad-Nagpur Industrial Corridor

3) Hyderabad-Bengaluru Industrial Corridor

The new Industrial Policy brought out by the Government of Telangana promises to revolutionise the way industrial sector has been viewed by successive governments in this country. A day is not far when the new Industrial Policy of Telangana will shine as an exemplar among the best in the world.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Pre-Mix and Animal Feed (Poultry and Cattle)
Pre-Mix and Animal Feed (Poultry and Cattle)

Animal production has been taking place over a long time, with the availability of compound feed being only a relatively recent innovation. This is... Read More

Capacity :
Cattle Feed : 64 MT/Day Poultry Feed : 32 MT/Day Pre-Mix Feed : 4 MT/Day
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
68.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
543.00Lakhs
Add To Inquiry Basket
Stable Bleaching Powder
Stable Bleaching Powder

Stable Bleaching process are those which remove colour from natural or artificial products. In early times bleaching was do... Read More

Capacity :
2 MT/Day
Plant and Machinery cost:
16.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
58.00Lakhs
Add To Inquiry Basket
Pre-Stressed Concrete Electric Poles By Spinning
Pre-Stressed Concrete Electric Poles By Spinning

PSC poles stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. Thes... Read More

Capacity :
200 Nos./Day
Plant and Machinery cost:
158.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
27.00 %
TCI :
0.00 Lakhs
Cost of Project :
462.00Lakhs
Add To Inquiry Basket
Cheese Analogues
Cheese Analogues

Cheese analogues (more widely known as cheese alternatives) are products used as culinary replacements for cheese. These in... Read More

Capacity :
1000 Kgs./Day
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
126.00Lakhs
Add To Inquiry Basket
Wood Polish
Wood Polish

Wood polish is used to protect against abrasions and gives your furniture a shiny appearance. While polish evaporates more quickly than wood wax, i... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Boot Polish or Shoe Polish
Boot Polish or Shoe Polish

Boot polish (or Shoe polish) is a waxy paste, cream, or liquid used to polish, shine, and waterproof leather shoes or boots to extend the footwear'... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Abrasive Cake for Granite & Marble Polishing
Abrasive Cake for Granite & Marble Polishing

Granite and Marble polishing stone is an essential item in the civil construction industries. It is made by using some chemical compounds mixed hom... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Magnesite Resin Bond Polishing Bricks for Granite
Magnesite Resin Bond Polishing Bricks for Granite

Granite is the hardest compact structural stone, which is quarried & dressed into blocks of desired sizes and shapes, and in amenable to slicin... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Mango Papad (Aam Papad)
Mango Papad (Aam Papad)

Aam papad is an Indian fruit leather made out of mango pulp mixed with concentrated sugar solution and sun dried. It is also known as Aamta (Assame... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Fluorescent Tube
Fluorescent Tube

Fluorescent lamp, or fluorescent tube, is a low-pressure mercury-vapor gas-discharge lamp that uses fluorescence to produce visible light. An elect... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Dish Antenna & Satelite Network Equipment
Dish Antenna & Satelite Network Equipment

Dish antenna, also known simply as a dish, is common in microwave systems. This type of antenna can be used for satellite communication and broadca... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Nursing Home
Nursing Home

Nursing homes are a type of residential care that provide around-the-clock nursing care for elderly people. Twenty-four-hour nursing care is availa... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Filter (for All Vehicles)
Filter (for All Vehicles)

Filters containing an absorbent or catalyst such as charcoal (carbon) may also remove odors and gaseous pollutants such as volatile organic compoun... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Red Oxide Primer [Anti-Corrosive]
Red Oxide Primer [Anti-Corrosive]

Red Oxide Primer is specially formulated for use on both bare and rusty iron and steel. Red oxide primer is a specially formulated coating used as ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
IV Fluids
IV Fluids

I.V. Fluids

Intravenous fluids are fluid... Read More

Capacity :
27,000,000 Bottles/annum
Plant and Machinery cost:
476.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
5.00 %
TCI :
0.00 Lakhs
Cost of Project :
1060.00Lakhs
Add To Inquiry Basket
HDPE PP Woven Fabric
HDPE PP Woven Fabric

HDPE/PP Woven Fabric

Woven is a me... Read More

Capacity :
8.4 MT/Day
Plant and Machinery cost:
500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
923.00Lakhs
Add To Inquiry Basket
Polymer Pencil
Polymer Pencil

A pencil is a writing instrument or art medium constructed of a narrow, solid pigment core inside a protective casing which... Read More

Capacity :
67 Th. Pcs. /day
Plant and Machinery cost:
116.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
Nuts & Bolts (M S Fasteners)
Nuts & Bolts (M S Fasteners)

A fastener is a connective mechanism that mechanically joins or affixes two or more objects toget... Read More

Capacity :
Mild Steel/HT Bolts : 625 Kgs. /Day Mild Steel/HT Nuts : 125 Kgs. /Day
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
54.00Lakhs
Add To Inquiry Basket
Protein Bar
Protein Bar

Good nutrition practices help to fuel physical activity, in addition to sustaining normal bodily functions and the growth, ... Read More

Capacity :
40,000. Pcs. per day
Plant and Machinery cost:
129.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
644.00Lakhs
Add To Inquiry Basket
Mosquito Repellent Liquidator
Mosquito Repellent Liquidator

The mosquito repellent consists of a liquid mix that gets converted into vapors on moderate heating. Thes... Read More

Capacity :
Mosquito Repellent Liquidator, Vaporiser 50 ml size PET Bottle: 2,400,000 Nos/annum
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
291.00Lakhs
Add To Inquiry Basket
Production of PE Wax Emulsion (Polyethylene Wax Emulsion)
Production of PE Wax Emulsion (Polyethylene Wax Emulsion)

Production of PE Wax Emulsion (Polyethylene Wax Emulsion) ... Read More

Capacity :
20 MT/Day
Plant and Machinery cost:
97.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
343.00Lakhs
Add To Inquiry Basket
PUFFED RICE (Muri)
PUFFED RICE (Muri)

Puffed Rice is a commonly consumed commodity as a pastime snack. It can be used in combination with nuts such as groundnut ... Read More

Capacity :
1200 MT/annum
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
28.00Lakhs
Add To Inquiry Basket
Kraft Paper From Waste Paper
Kraft Paper From Waste Paper

Kraft paper is paper produced from chemical pulp produced in the kraft process. Sack kraft paper, or just sack paper, is... Read More

Capacity :
7500 MT/annum
Plant and Machinery cost:
914.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1756.00Lakhs
Add To Inquiry Basket
Multiblade Safety Razor
Multiblade Safety Razor

A safety razor is a shaving implement with a protective device positioned between the edge of the blade and the skin. The i... Read More

Capacity :
Multiblade Safety Razor (2 Blade): 86,400,000 Nos/annum
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
826.00Lakhs
Add To Inquiry Basket
Spices in Pouch Packing
Spices in Pouch Packing

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, alt... Read More

Capacity :
360,000 kgs./annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
181.00Lakhs
Add To Inquiry Basket
Tennis Ball  (Used in Playing Cricket)
Tennis Ball (Used in Playing Cricket)

Tennis ball cricket is a variant of cricket popular in the Indian subcontinent, and a very South Asians living in the US &a... Read More

Capacity :
1,500,000 NOS/annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
164.00Lakhs
Add To Inquiry Basket
Ready Mix Concrete with Concrete Blocks
Ready Mix Concrete with Concrete Blocks

Ready mix concrete has advantages in the area where immediate requirement of concrete mixture like in the preparation of br... Read More

Capacity :
Ready Mix Concrete : 300 Cu.Mtrs /day Concrete Blocks (Size 400x100x200 mm) : 250 Cu.Mtrs
Plant and Machinery cost:
83.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
69.00 %
TCI :
0.00 Lakhs
Cost of Project :
586.00Lakhs
Add To Inquiry Basket
Plastic Pyrolysis Waste Plastic to Oil Conversion
Plastic Pyrolysis Waste Plastic to Oil Conversion

Plastics have become an indispensable part in today’s world. Due to their light weight, durability, energy efficiency... Read More

Capacity :
Pyrolysis Oil : 10 MT/Day Carbon (by product) : 3 MT/Day Gas (by product) : 2 MT/Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
446.00Lakhs
Add To Inquiry Basket
Betel Nut (Supari) Processing
Betel Nut (Supari) Processing

Areca nut is the nut of areca palm. Biological name of areca nut palm is Areca catechu and it is a member of t... Read More

Capacity :
Supari : 500 Kgs. /Day Tannin : 33 Kgs. /Day Brushes/Rope : 250 Kgs. /Day Pan Masala : 500 Kgs.
Plant and Machinery cost:
42.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
191.00Lakhs
Add To Inquiry Basket
IV Fluids (BFS Technology)
IV Fluids (BFS Technology)

Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These flui... Read More

Capacity :
48,000 Bottles/Day 500 ml each bottle
Plant and Machinery cost:
253.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
834.00Lakhs
Add To Inquiry Basket
Craft Beer
Craft Beer

Craft beer is a type of beer brewed in a traditional manner and usually produced in smaller quantities than that of the conventional beer. The prod... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Agricultural Warehouse with Cold Storage
Agricultural Warehouse with Cold Storage

Warehousing plays a very vital role in promoting agriculture marketing, rural banking and financing and ensuring Food Security in the county. It en... Read More

Capacity :
Sacks Store in Warehouse : 50000 Units /Day Cold Storage : 65 Units /Day
Plant and Machinery cost:
276.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1468.00Lakhs
Add To Inquiry Basket
Aluminium Rolling Mill
Aluminium Rolling Mill

Aluminium foil is aluminium prepared in thin metal leaves, with a thickness less than 0.2 millimetres (8 mils), thinner gau... Read More

Capacity :
Aluminium Foil Food Grade (thickness 0.006 mm to 0.150 mm) : 24 MT/Day
Plant and Machinery cost:
310.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1252.00Lakhs
Add To Inquiry Basket
Calcium Silicate Insulation Board
Calcium Silicate Insulation Board

Calcium silicate board is an asbestos-free thermal insulation product that can withstand continuous high operating temperatures. ... Read More

Capacity :
50,000 Sq.MT/annum
Plant and Machinery cost:
74.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
316.00Lakhs
Add To Inquiry Basket
Ginger Oil
Ginger Oil

Ginger products, such as ginger oil is internationally commercialized for use in food and pharmaceutical processing. To ... Read More

Capacity :
45,000 Kgs/annum
Plant and Machinery cost:
103.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
274.00Lakhs
Add To Inquiry Basket
Fusion Bonded Epoxy Coating (FBE) on TMT Bars
Fusion Bonded Epoxy Coating (FBE) on TMT Bars

Fusion bonded epoxies are one part, heat curable, thermosetting epoxy utilized for corrosion protection. FBEs are applie... Read More

Capacity :
72,000 MT/annum
Plant and Machinery cost:
768.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
2932.00Lakhs
Add To Inquiry Basket
Vacuum Fried Snacks
Vacuum Fried Snacks

Vacuum Fried Snacks: Vacuum Fried Vegetable Chips  (Sweet Potato, Beans and Beetroot) Manufacturing Pl... Read More

Capacity :
Sweet potato : 120 kg/day Beat root : 80 kg/day Beans chips : 266 kg/day
Plant and Machinery cost:
83.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
209.00Lakhs
Add To Inquiry Basket
Curcumin Extraction Unit
Curcumin Extraction Unit

Curcumin is the main biologically active phytochemical compound of Turmeric. It is extracted, concentrated, standardized an... Read More

Capacity :
Curcumin Powder :15,000 Kgs/annum Turmeric Oil : 15,000 Kgs/annum Deoiled Turmeric
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
355.00Lakhs
Add To Inquiry Basket
Particle Board (Wood Base)
Particle Board (Wood Base)

Particle Boards are a relatively new type of engineered wood product.It is cheaper, denser and more uniform than conventional wood and plywood. The... Read More

Capacity :
600Nos/day
Plant and Machinery cost:
452.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
54.00 %
TCI :
1066.00 Lakhs
Cost of Project :
1066.00Lakhs
Add To Inquiry Basket
Calcium Silicate Blocks and Pipes
Calcium Silicate Blocks and Pipes

Calcium silicate is the chemical comp... Read More

Capacity :
Calcium Silicate Blocks : 31250 sq.mt./MT/annum Calcium Silicate Pipes: 750 sq.mt./MT/annum
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
66.00 %
TCI :
158.00 Lakhs
Cost of Project :
158.00Lakhs
Add To Inquiry Basket
Glass Sheet
Glass Sheet

It is difficult to conceive the cont... Read More

Capacity :
Glass Sheet: 1000500 Sq.Mt/annum
Plant and Machinery cost:
919.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
60.00 %
TCI :
1742.00 Lakhs
Cost of Project :
1742.00Lakhs
Add To Inquiry Basket
Baby & Adult Diaper & Sanitary Pads
Baby & Adult Diaper & Sanitary Pads

A diaper or nappy is a kind of under... Read More

Capacity :
Baby Diapers : 3000000 Pkts/annum Adult Diapers : 1500000 Pkts/annum Sanitary Napkins : 4500000 Pkts
Plant and Machinery cost:
1029.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
51.00 %
TCI :
1657.00 Lakhs
Cost of Project :
1657.00Lakhs
Add To Inquiry Basket
Aluminium Foil
Aluminium Foil

Aluminium plays a major role in the m... Read More

Capacity :
Household, Food Packaging: 3,000 MT/Annum Grade Aluminium Foil Pharmaceutical Grade Printed : 1,500
Plant and Machinery cost:
1340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
2717.00 Lakhs
Cost of Project :
2717.00Lakhs
Add To Inquiry Basket
Dal Mill (Pulses)
Dal Mill (Pulses)

India is the ... Read More

Capacity :
Pigeon peas: 12,000 MT/Annum Green Gram : 12,000 MT/Annum Chickpeas: 12,000 MT/Annum
Plant and Machinery cost:
1908.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
3128.00 Lakhs
Cost of Project :
3128.00Lakhs
Add To Inquiry Basket
Industrial Training Institute
Industrial Training Institute

Industrial Training Institute (I.T.I)

Read More

Capacity :
Total number of students: 3600 students/annum (each trade 120 students) 16 Trade 1 year duration 14
Plant and Machinery cost:
314.25 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
2476.00 Lakhs
Cost of Project :
2476.00Lakhs
Add To Inquiry Basket
Residential School
Residential School

The importance of education was well... Read More

Capacity :
5000 Nos of students
Plant and Machinery cost:
642.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.35%
Break Even Point (BEP):
0.00 %
TCI :
4887.00 Lakhs
Cost of Project :
4887.00Lakhs
Add To Inquiry Basket
NPK Complex Organic Fertilizer Plant
NPK Complex Organic Fertilizer Plant

Feeding a population of 9 billion pe... Read More

Capacity :
3600 MT/annum
Plant and Machinery cost:
177.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
50.00 %
TCI :
498.00 Lakhs
Cost of Project :
498.00Lakhs
Add To Inquiry Basket
Adhesive Based on Epoxy Resin (2 Pack)
Adhesive Based on Epoxy Resin (2 Pack)

The adhesive industry has seen signi... Read More

Capacity :
Pure Epoxy Resin with Curing Agent : 9000000 Kgs/Annum
Plant and Machinery cost:
162.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
60.00 %
TCI :
698.00 Lakhs
Cost of Project :
698.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded... Read More

Capacity :
Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annu
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
51800000.00Lakhs
Add To Inquiry Basket
Pan Masala
Pan Masala

The custom of chewing breath fresheners after meals has a very long history, particularly in India. Pan Masala is a balanced mixture of betel leaf ... Read More

Capacity :
Sada Pan Masala: 99000kgs/annum Meetha Pan Masala: 99000kgs/annum Zarda Pan Masala: 102000kgs/annum
Plant and Machinery cost:
35.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
226.00Lakhs
Add To Inquiry Basket
Aluminium Fluoride
Aluminium Fluoride

Aluminium fluoride is the chemical compound with the formula AlF3. It has the consistency of a white powder. AlF... Read More

Capacity :
Aluminium Fluoride : 60,000MT/annum Silica as bye product : 20,400MT/annum
Plant and Machinery cost:
1739.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
3496.00Lakhs
Add To Inquiry Basket
Floral Foam
Floral Foam

Floral foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when w... Read More

Capacity :
3,600,000 Pcs/annum
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
270.00Lakhs
Add To Inquiry Basket
Wire Nail
Wire Nail

Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fa... Read More

Capacity :
Wire Nail : 369,600 Kgs/annum Wire Scrap : 34,800 Kgs/annum
Plant and Machinery cost:
11.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
59.00Lakhs
Add To Inquiry Basket
Dal Mill  (Pulses)
Dal Mill (Pulses)

India is the still by and large vegetarian in dietary habit and heavily depends upon vegetative source to meet out its dail... Read More

Capacity :
Pigeon peas : 4,000 MT/ annum Lentil: 4,000 MT/annum Chickpeas: 4,000 MT/annum
Plant and Machinery cost:
146.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
542.00Lakhs
Add To Inquiry Basket
Paper Cartons
Paper Cartons

The materials now available for packaging are paper and paper products, metal containers and foils, glass, plastics-rigid and flexible, cellu... Read More

Capacity :
600,000,000 Nos./Annum
Plant and Machinery cost:
75.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.18%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
1474.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
A Business Plan for Ferri... Ferric Pyrophosphate 600 MT Per Annum 31.00 133.00
How to Start A Business o... 0 0.00 0.00
A Business Plan for Seawo... Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum 28.00 2040.00
Setup Extraction of Salt ... Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum 29.00 2776.00
A business Plan For Surgi... Surgical Sutures: 450,000 Boxes per annum 27.00 877.00
Starting up production of... Glycerol Monostearate: 900 MT Per Annum 29.00 320.00
Startup A Business of Dou... 0 0.00 0.00
Now Is The Time To Take C... 0 0.00 0.00
Start Production of Potat... Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum 30.00 121.00
Setup Cashew Nut Processi... Cashew Nut Processing: 4,794 Kgs Per Day 23.00 1100.00
Start a Business of Parti... Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum 30.00 1100.00
A Business Plan for Wood ... Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum 27.00 790.00
Start a Production Of Sod... Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum 14.00 1265.00
12345678910...

Showing 541 - 600 of 2846 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR