• 0

Project Consultancy, Reports & Profiles

Best Business Opportunities in Meghalaya - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

 

Meghalaya is a state in north-east India. The name means "the abode of clouds" in Sanskrit. As of 2011, the state has a population of 2,964,007 and is the 23rd most populous in the country. The population of Meghalaya as of 2014 is estimated to be 3,211,474. Meghalaya covers an area of approximately 22,430 square kilometers, with a length to breadth ratio of about 3:1

Meghalaya is predominantly an agrarian economy. Agriculture and allied activities engage nearly two-thirds of the total work force in Meghalaya. However, the contribution of this sector to the State's NSDP is only about one-third. Agriculture in the state is characterized by low productivity and unsustainable farm practices. Despite the large percentage of population engaged in agriculture, the state imports food from other Indian states.


TOURISM

 Meghalaya has some of the thickest surviving forests in the country and therefore constitutes one of the most important ecotourism circuit’s in India. The Meghalaya subtropical forests support a vast variety of flora and fauna. Meghalaya has 2 National Parks and 3 Wildlife Sanctuaries.   Meghalaya also offers many adventure tourism opportunities in the form of mountaineering, rock climbing, and trekking and hiking, water sports etc. The state offers several trekking routes, some of which also afford an opportunity to encounter rare animals such as slow loris, assorted deer and bear. The Umiam Lake has a water sports complex with facilities such as rowboats, paddleboats, sailing boats, cruise-boats, water-scooters and speedboats. Tourism in India is a growing industry, and as per World Tourism Organization predictions, India will be a leader in using tourism as an employment generator. The State of Meghalaya must be placed in a strategic position to take advantage of this growth.

“MEGHALAYA TOURISM DEVELOPMENT CORPORATION” has been set up for developing and promotion of Tourism in Meghalaya. The Corporation shall make efforts to increase its revenue to enable to carry out promotional activities. MTDC will organize package tours not only to Cherrapunjee but to other tourist destinations; organize training for guides, etc.

INDUSTRIAL SECTOR

The New Industrial & Investment Promotion Policy is designed to facilitate investments in new sectors across the State and thus ensure accelerated and sustained growth. The Policy focuses to attract, facilitate and promote wider expectations and high end investment.

There is an urgent need to promote investment in backward and difficult but resource rich areas. Therefore the policy provides additional incentives and support for such investments.


OBJECTIVE OF THE POLICY

•        To promote investment in all sectors

•        Generate employment opportunities for the local people in the industries and allied sectors.

•        To provide special incentives for promoting local Entrepreneurs in setting up of micro, small & medium manufacturing and service enterprises.

•        Develop human resources and bring about improvements in the quality of life by promoting industries in sectors where the state has comparative advantage.

•        Achieve a balanced and growth oriented development covering the entire state through promotion of village and small scale industries.

•        Encourage need based development of local entrepreneurial skills through intensive motivation and training programmes at District, Sub-division and Block levels.

•        Provide guidance to prospective entrepreneurs by building up a data bank of project-profiles and other connected information. Special support to local entrepreneurs will be provided, and monitoring will be done to enable them to be successful.

•        Simplify rules and procedures by providing a single-window clearance facility for all investment proposals as applicable.

•        Promote Tourism, and make Meghalaya a tourist destination.

•        Promote IT as industries.

•        Promote first generation entrepreneurs. Government will encourage setting up of Entrepreneurship Development Institute by private or in PPP mode.

SALIENT FEATURES OF THE INDUSTRIAL POLICY

•        State Government believes in promoting private enterprises for speedy economic development of the State. The Government also stands committed to ensuring the healthy growth of existing industries. For this purpose, Government will ensure optimum number of industries by not permitting excess in any specific sector, thereby ensuring sustainability of existing business.

•        Enterprises promoted and managed by “Woman Entrepreneur”/physically challenged will get additional 10 % (ten percent) incentives on the State Capital Investment Subsidy.

•        Meghalaya has a long international border which needs immediate attention for development. To address this issue, 10 Kms towards the State from the International border is declared as “PRIORITY AREA” and enterprises set up within the 10 Kms area will be given special incentives to be known as “Border Area Subsidy”.

•        Government of Meghalaya recognizes:

1.       Hotels (not below two star category) and Amusement Parks.

2.       Medical and health services in the nature of nursing homes with a minimum capacity of 25 beds and Super – Specialty Health Care.

3.       Vocational training Institutes.


INDUSTRIES IDENTIFIED AS THRUST AREAS

                    Agro Based Industries :

   Horticulture – Based Units

   Biotechnology Based Units

   Medicinal Plants, Tea and Rubber

                       Animal Husbandry and Meat Processing Industries

         Development of Mineral based Industries:

      Coal-Based Industries

     Limestone Based Industries- Cement Plants, Lime Plants,

                      Calcium Carbide   Plants.

                       Electronics & Information Technology

INCENTIVES FOR LARGE AND MEDIUM SCALE INDUSTRIES

•        For large and medium scale industries, there are subsidies like capital investment subsidy, interest subsidy, power subsidy, subsidy on cost of pollution/quality-control measures, special subsidy for pioneer units in backward areas etc.

•        Exemption from the payment of applicable service tax for seven years to a "Tourism Unit"

•        Sales Tax exemption on sale of finished products for a period of seven years from the date of commercial production.

•        Reimbursement of Central Sales Tax (CST) paid on purchase of Capital Equipment installed till the date of project commissioning.

•        Partial exemption for applicable stamp duty.

INVESTMENT POLICIES

Meghalaya Government has always endeavored to set up the right kind of business climate to motivate investments in the State. In order to attract investment to the various sectors and thus contribute to the development of the economy as a whole.

The major being the industrial policy, which had been announced with a view to take advantage of the liberalized economic scenario in the country and also to keep pace with development in the national industrial sector are-

•        Generate employment opportunities for the local people in the industries and allied sectors

•        Develop human resources and bring about improvements in the quality of life by promoting industries in sectors where the state has comparative advantage. Create a conducive environment for industrial development by creation of the basic Infrastructural facilities and by setting up of industrial areas, growth centre and export promotion industrial park.

•        Provide preference to local Entrepreneurship in setting up of large, medium and small-scale units.

•        Promote local interests through joint ventures with external investors so as to facilitate technology transfer and capital flow by a package of suitable incentives.

•        Encourage setting up of export-oriented, Agro based, Mineral-based, Horticultural based and Electronic units as thrust area.

 

Reasons for buying our reports:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

• This report provides vital information on the product like its characteristics and segmentation

• This report helps you market and place the product correctly by identifying the target customer group of the product 

• This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

• The report provides a glimpse of government regulations applicable on the industry

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

• Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

• We use reliable sources of information and databases. And information from such sources is processed by us and included in the report


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
CAFFEINE FROM TEA WASTE
CAFFEINE FROM TEA WASTE

Caffeine is widely used in pharmaceuticals as free base and mixtures, such as citrated caffeine’... Read More

Capacity :
0.30 MT/day
Plant and Machinery cost:
24.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
49.00 %
TCI :
138.00 Lakhs
Cost of Project :
138.00Lakhs
Add To Inquiry Basket
RUBBER ROLLER FOR PRINTING MACHINE
RUBBER ROLLER FOR PRINTING MACHINE

The rubber rollers used in printing machineries are of different sizes and as per requirement. These can be manufactured by using different dies an... Read More

Capacity :
20 Pcs/Day
Plant and Machinery cost:
15.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
47.00 %
TCI :
57.00 Lakhs
Cost of Project :
57.00Lakhs
Add To Inquiry Basket
Vinegar
Vinegar

Vinegar is well known since long back through out the world. It is used daily in every house. Vinegar is known in Hindi and Punjabi as sirka. Vineg... Read More

Capacity :
5000 Bottles Per Day
Plant and Machinery cost:
27.00 Lakhs
Working Capital :
31.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
37.00 %
TCI :
77.00 Lakhs
Cost of Project :
77.00Lakhs
Add To Inquiry Basket
5 Star Hotel
5 Star Hotel

he hotel industry is an important component of tourism industry. Its foreign exchange earning capacity is also high. The irritation of economic ref... Read More

Capacity :
150 Rooms
Plant and Machinery cost:
2000.00 Lakhs
Working Capital :
237.00
Rate of Return (ROR):
30.68%
Break Even Point (BEP):
47.21 %
TCI :
1000.00 Lakhs
Cost of Project :
1000.00Lakhs
Add To Inquiry Basket
Liquid Organic Fertiliser (Biofertiliser)
Liquid Organic Fertiliser (Biofertiliser)

Liquid organic fertiliser or Bio fertiliser new days has increased market. There is new decease in the inorganic fertiliser market. Liquid organic ... Read More

Capacity :
300000 Liters/Annum
Plant and Machinery cost:
20.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
71.00 %
TCI :
73.06 Lakhs
Cost of Project :
73.06Lakhs
Add To Inquiry Basket
Liquid Organic Fertilizer (Biofertiliser)
Liquid Organic Fertilizer (Biofertiliser)

Liquid organic fertilizer or bio fertilizer now days has increasing market. There is now decrease in the inorganic fertilizer market. Liquid organi... Read More

Capacity :
300000 Liters/Annum
Plant and Machinery cost:
20.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
71.00 %
TCI :
74.00 Lakhs
Cost of Project :
74.00Lakhs
Add To Inquiry Basket
Chicken Mutton (Sheep Meat) Processing
Chicken Mutton (Sheep Meat) Processing

Chicken/Mutton (Sheep Meat) Processing

Meat is a good source of high quality and r... Read More

Capacity :
0
Plant and Machinery cost:
14.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
62.72%
Break Even Point (BEP):
0.00 %
TCI :
153.00 Lakhs
Cost of Project :
153.00Lakhs
Add To Inquiry Basket
N-Acetyl Glucosamine through Chitin Biotechnically
N-Acetyl Glucosamine through Chitin Biotechnically

N-acetyl glucosamine is manufactured from chitin by enzymatic treatment of chitin. It is used for development of various biotechnology base product... Read More

Capacity :
500 Kgs/Day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
123.00
Rate of Return (ROR):
60.41%
Break Even Point (BEP):
37.89 %
TCI :
236.00 Lakhs
Cost of Project :
236.00Lakhs
Add To Inquiry Basket
Canning of Fruits (Pine Apples slices, Litchee, Cherries, Straw berries in syrup)
Canning of Fruits (Pine Apples slices, Litchee, Cherries, Straw berries in syrup)

The present level of annual production of fruits in India is about 60 million tones. Hardly 20% of the fruits produced in the country are used for ... Read More

Capacity :
5000 Cans/day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
59.00%
Break Even Point (BEP):
0.00 %
TCI :
100.00 Lakhs
Cost of Project :
100.00Lakhs
Add To Inquiry Basket
Dairy Products & Milk Packaging in Pouches
Dairy Products & Milk Packaging in Pouches

Dairy products are basically based o... Read More

Capacity :
600 Kgs / Days
Plant and Machinery cost:
65.00 Lakhs
Working Capital :
361.00
Rate of Return (ROR):
62.69%
Break Even Point (BEP):
29.48 %
TCI :
531.00 Lakhs
Cost of Project :
531.00Lakhs
Add To Inquiry Basket
Five Star Hotel & Business Shopping Mall
Five Star Hotel & Business Shopping Mall

Five star hotel contents business center by making luxurious shops inside the hotel for selling consumer goods, articles and beverages, is wonderfu... Read More

Capacity :
Plant and Machinery cost:
5100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
59.00%
Break Even Point (BEP):
29.00 %
TCI :
30000.00 Lakhs
Cost of Project :
30000.00Lakhs
Add To Inquiry Basket
Rubber Compounding for Automobile Industry
Rubber Compounding for Automobile Industry

Before going to various rubber compounding ingredients as applied in the rubber industry in detail, we would like to clarify the term compounding a... Read More

Capacity :
10 MT/Day
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
63.00%
Break Even Point (BEP):
32.00 %
TCI :
407.00 Lakhs
Cost of Project :
407.00Lakhs
Add To Inquiry Basket
Rubber Reclamation
Rubber Reclamation

Reclaimed rubber is manufactured out of discarded tyres and tubes and other wastes of rubber products. A fully reclaimed rubber is completely solub... Read More

Capacity :
2.00 MT/day
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
51.00%
Break Even Point (BEP):
43.00 %
TCI :
98.00 Lakhs
Cost of Project :
98.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Blood Bags
Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
A Business Plan For Nicotine From Tobacco Waste
A Business Plan For Nicotine From Tobacco Waste

Nicotine is a naturally occurring chemical compound that is f... Read More

Capacity :
Nicotine 100ml bottle each 3,500 Bottles per day
Plant and Machinery cost:
244.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
1662.00Lakhs
Add To Inquiry Basket
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal

An exhaustive manual that o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan Nonwoven Fabric For Mattress
A Business Plan Nonwoven Fabric For Mattress

 

Nonwoven fabric f... Read More

Capacity :
Nonwoven Fabric 400,000 Sq.mtrs. per day
Plant and Machinery cost:
797.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
2297.00Lakhs
Add To Inquiry Basket
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)

 

A variety of meth... Read More

Capacity :
-
Plant and Machinery cost:
276.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
878.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)

Semi Processed Canned Veget... Read More

Capacity :
Canned Chickpeas 1 Kg each 5,000 Th.Packs Per Annum Canned Red Kidney Beans 1 Kg each 5,000 Th.Pa
Plant and Machinery cost:
271.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
1398.00Lakhs
Add To Inquiry Basket
Business Plan For Silica From Rice Husk Ash
Business Plan For Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and... Read More

Capacity :
-
Plant and Machinery cost:
746.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1327.00Lakhs
Add To Inquiry Basket
Start Production of Activated Carbon From Bamboo
Start Production of Activated Carbon From Bamboo

 

Activated carbon ... Read More

Capacity :
Activated Carbon 750 MT per Annum
Plant and Machinery cost:
196.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
546.00Lakhs
Add To Inquiry Basket
A Business Plan For Light Weight Bricks (EPS Bricks)
A Business Plan For Light Weight Bricks (EPS Bricks)

Light weight bricks, also k... Read More

Capacity :
EPS Light Weight Bricks 200 Cu.Mt. Per Day
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
31.00 %
TCI :
0.00 Lakhs
Cost of Project :
737.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Carton Boxes
Start Manufacturing Business Carton Boxes

Carton boxes, also known as corrugated boxes, are commonly us... Read More

Capacity :
Carton Boxes 20 MT Per Day
Plant and Machinery cost:
213.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
1023.00Lakhs
Add To Inquiry Basket
Start Business Of Recycled Polyester Fiber From Used PET Bottles
Start Business Of Recycled Polyester Fiber From Used PET Bottles

Recycled polyester fiber is... Read More

Capacity :
Recycled Polyester Fiber 5,000 Kgs. Per Day
Plant and Machinery cost:
68.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
552.00Lakhs
Add To Inquiry Basket
A Business Plan  Copper Cathode From Copper Scrap
A Business Plan Copper Cathode From Copper Scrap

Copper cathode is a pure form of copper metal that is produce... Read More

Capacity :
Copper Cathode 1,800 MT Per Annum Copper Slag, Residue 180 MT Per Annum
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
954.00Lakhs
Add To Inquiry Basket
Start  Electrolytic Manganese Dioxide Business
Start Electrolytic Manganese Dioxide Business

Electrolytic Manganese Diox... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Setup Sitagliptin (API) Business
Setup Sitagliptin (API) Business

 

Sitagliptin API, ... Read More

Capacity :
Sitagliptin 10 MT Per Day By Products 10 MT Per Day
Plant and Machinery cost:
377.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
5217.00Lakhs
Add To Inquiry Basket
Start Cardanol Business From Cashew Nut Shell Liquid
Start Cardanol Business From Cashew Nut Shell Liquid

Cardanol is a naturally occ... Read More

Capacity :
Cardanol 30 MT Per Day
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
710.00Lakhs
Add To Inquiry Basket
Start Business Of Cold Storage
Start Business Of Cold Storage

Cold storage refers to a me... Read More

Capacity :
Fruits, Vegetables, Pulses & Spices Store 5000 MT
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
713.00Lakhs
Add To Inquiry Basket
Start Layer Feed Production
Start Layer Feed Production

Layer feed is a specially formulated feed given to laying hens to ensure their ... Read More

Capacity :
-
Plant and Machinery cost:
234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1655.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Safety Shoes
Start Manufacturing Of Safety Shoes

Capacity :
Safety Shoes 2,000 Pairs Per Day
Plant and Machinery cost:
113.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
672.00Lakhs
Add To Inquiry Basket
Start IV Cannula Manufacturing Unit (Pen Style)
Start IV Cannula Manufacturing Unit (Pen Style)

An IV (Intravenous) Cannula, particularly the "Pen Style," is a medical device used for admini... Read More

Capacity :
-
Plant and Machinery cost:
1284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
5103.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of  Disposable Plastic Syringes
Start Manufacturing Business Of Disposable Plastic Syringes

Disposable plastic syringes... Read More

Capacity :
-
Plant and Machinery cost:
245.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
1811.00Lakhs
Add To Inquiry Basket
Start Business of Solid Rubber Tyres
Start Business of Solid Rubber Tyres

 

Read More

Capacity :
-
Plant and Machinery cost:
1234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
4428.00Lakhs
Add To Inquiry Basket
Opportunity in Paint Rollers Business
Opportunity in Paint Rollers Business

 

Paint rollers are... Read More

Capacity :
Paint Roller 12,000 Pcs. Per Day
Plant and Machinery cost:
73.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
396.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Particle Board (Wood Base)
Start Manufacturing of Particle Board (Wood Base)

Particle board, also known ... Read More

Capacity :
Particle Board (Wood Based) 3,600 Nos Per Day
Plant and Machinery cost:
1630.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3137.00Lakhs
Add To Inquiry Basket
Invest In Potato Starch & Flakes Industry
Invest In Potato Starch & Flakes Industry

Potato starch is extracted throug... Read More

Capacity :
Potato Starch: 7,000 Kgs Per Day Potato Flakes: 5,000 Kgs Per Day
Plant and Machinery cost:
203.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
877.00Lakhs
Add To Inquiry Basket
Start Malic Acid (Powder) Production Business
Start Malic Acid (Powder) Production Business

 

Malic acid, also ... Read More

Capacity :
3.3 MT per day
Plant and Machinery cost:
391.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
1285.00Lakhs
Add To Inquiry Basket
Start your own Blood Lancet and Insulin Pen Needle Manufacturing Business
Start your own Blood Lancet and Insulin Pen Needle Manufacturing Business

Disposable blood lancet &am... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan on Hexamethoxymethyl Melamine Resin (HMMM)
Business Plan on Hexamethoxymethyl Melamine Resin (HMMM)

The chemical family of mela... Read More

Capacity :
8 MT per day
Plant and Machinery cost:
280.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
745.00Lakhs
Add To Inquiry Basket
Detailed Project Report on Cellulosic Cellophane Film
Detailed Project Report on Cellulosic Cellophane Film

CNF (cellulosic cellophane ... Read More

Capacity :
6 MT per day
Plant and Machinery cost:
310.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
681.00Lakhs
Add To Inquiry Basket
Setup E-Waste Recycling Plant
Setup E-Waste Recycling Plant

Electronic wastes are super... Read More

Capacity :
Plastic:1.28 MT/day Ferrous Material:0.80 MT/dayAluminium:0.56 MT/dayGlass:0.80 MT/day Copper:0.56 M
Plant and Machinery cost:
87.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
371.00Lakhs
Add To Inquiry Basket
Set up Bamboo Fiber and Yarn Manufacturing Unit A Complete Business Plan
Set up Bamboo Fiber and Yarn Manufacturing Unit A Complete Business Plan

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
The Abrasive Grinding Wheels Manufacturing Business Plan is the perfect way for you to start a business that Manufactures Abrasive Grinding Wheels
The Abrasive Grinding Wheels Manufacturing Business Plan is the perfect way for you to start a business that Manufactures Abrasive Grinding Wheels

It is a wheel made of bonded abra... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Lovastatin Production business  (from Dextrose, Peptone Powder, Sugar & Soyabean)
Start Lovastatin Production business (from Dextrose, Peptone Powder, Sugar & Soyabean)

Lovastatin is a drug that l... Read More

Capacity :
240 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
2700.00Lakhs
Add To Inquiry Basket
How to Start Surgical Cotton Manufacturing Business
How to Start Surgical Cotton Manufacturing Business

Surgical cotton is also ter... Read More

Capacity :
1000 Kgs. per day
Plant and Machinery cost:
358.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
568.00Lakhs
Add To Inquiry Basket
Start Production Business of Industrial Enzymes used in Textile, Poultry and Paper Pulp Industries
Start Production Business of Industrial Enzymes used in Textile, Poultry and Paper Pulp Industries

Enzymes are great catalysts... Read More

Capacity :
300 MT Per Annum
Plant and Machinery cost:
633.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
959.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Unit
Setup Curcumin Extraction Unit

Turmeric is a gold-colored ... Read More

Capacity :
Curcumin Powder: 100 Kgs/day Turmeric Oil: 48 Kgs/day Deoiled Turmeric: 1,842 Kgs/day
Plant and Machinery cost:
215.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
493.00Lakhs
Add To Inquiry Basket
Tennis Rackets Manufacturing Business
Tennis Rackets Manufacturing Business

A tennis racquet is used to... Read More

Capacity :
400 Pcs Per Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
345.00Lakhs
Add To Inquiry Basket
Monosodium Glutamate Production Business
Monosodium Glutamate Production Business

Monosodium Glutamate (MSG):

Read More

Capacity :
15 MT Per Day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
Benzoic Acid or Sodium Benzoate Manufacturing Business
Benzoic Acid or Sodium Benzoate Manufacturing Business

 

Benzoic Acid:

Read More

Capacity :
Benzoic Acid:23.3 MT Per Day | Sodium Benzoate: 6.7 MT Per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
3400.00Lakhs
Add To Inquiry Basket
Sorbic Acid or Potassium Sorbate Production Business
Sorbic Acid or Potassium Sorbate Production Business

 

Potassium and Sor... Read More

Capacity :
Sorbic Acid Powder: 200 MT per annum | Potassium Sorbate Powder: 300 MT per annum
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2000.00Lakhs
Add To Inquiry Basket
Detailed Project Report on Synthetic Tartaric Acid Production Business Best Startup Idea
Detailed Project Report on Synthetic Tartaric Acid Production Business Best Startup Idea

 

Introduction to Synthetic Tartaric Acid:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Quartz Slabs Manufacturing Business A Lucrative Business Plan
Start Quartz Slabs Manufacturing Business A Lucrative Business Plan

 

Introduct... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Float Glass (Electricity Dependence on Solar (on Plant Roof Top) and  Furnace Heat Recycling inside the Plant) Production Business
Float Glass (Electricity Dependence on Solar (on Plant Roof Top) and Furnace Heat Recycling inside the Plant) Production Business

 

Float glass typically has a compressive strength that is substantially higher than its tensile strength. In ... Read More

Capacity :
8000 Sq.Mtrs. per Day
Plant and Machinery cost:
20600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
27.00 %
TCI :
0.00 Lakhs
Cost of Project :
27000.00Lakhs
Add To Inquiry Basket
Aluminium Foil (Pharma Grade) Manufacturing Business
Aluminium Foil (Pharma Grade) Manufacturing Business

A thin metal sheet is aluminium foil. As a result, it can operate as a complete barrier to mould, moisture, gases, scents, ... Read More

Capacity :
12 MT per day
Plant and Machinery cost:
1500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2200.00Lakhs
Add To Inquiry Basket
Set up Sugar Plant
Set up Sugar Plant

 

A sweet, crystalline material made from sugar cane and sugar beet is referred to as sugar. It has countless ... Read More

Capacity :
0
Plant and Machinery cost:
14900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
24300.00Lakhs
Add To Inquiry Basket
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business

Rebar made of glass fibre reinforced polymer is a highly valuable building material. Governments and other large-scale... Read More

Capacity :
1200 MT per Day
Plant and Machinery cost:
58800000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
609700000.00Lakhs
Add To Inquiry Basket
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
India Hydrofluorocarbons Market
India Hydrofluorocarbons Market

 

Hydrofluorocarbons, or HFCs, are man-made Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manufacturing Business of... 12 MT per Day 31.00 595.00
Prestressed Concrete Slee... 1,000 Pcs per Day 27.00 3812.00
Business Plan for Manufac... 600 Kgs Per day 29.00 160.00
Set up your own Maize Pro... Maize Starch 150 MT Per Day Liquid Glucose 20 MT Per Day Maltodextrin 18 MT Per Day Gluten as by Pro 21.00 17100.00
Recycling of Lithium Ion ... Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L 27.00 422.00
Start Production Business... 300 Cu.Mtres Per Day 25.00 1070.00
Start Production of Ethan... Ethanol 30 Units per day Cattle feed as by Product 27 Units per day 26.00 3900.00
Set up Lithium Ion Batter... 0 0.00 0.00
Detailed Project Report o... 8 MT Per Day 28.00 656.00
Steel Shots and Grits (St... 40 MT per day 28.00 1884.00
PVC Edge Banding Tape Man... PVC Edge Banding Tape (Size 22 mm, 50 meter, 1 mm Roll) 303,030 Meter Per Day 30.00 1383.00
Manufacturing of Ascorbi... Ascorbic Acid (Powder) 8.3 MT Per Day Carbon Di-oxide by Product 11.6 MT Per Day Sodium Hyd 29.00 2444.00
AAC Blocks from Silica Sa... 0 0.00 0.00
Pre Feasibility Report on... Liquor 750 ml Size: 667 Bottles/Day Liquor 375 ml Size:1,334 Bottles/Day Liquor 180 ml: 2,778 Bottle 33.00 500.00
Start Flexographic Ink fo... R Non-Absorbent Substrate Flexographic Ink: 160 Kgs/Day | R Absorbent Substrate: 160 Kgs/Day 27.00 64.00
Start Automated Vehicle S... Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St 32.00 5100.00
Lithium Ion Battery Recyc... 0 0.00 0.00
Want to start a Calcium P... 0 0.00 0.00
3-Chloropivaloyl Chloride... 3-Chloropivaloyl Chloride: 4 MT Per Day | Hydrochoric Acid (30%)- by product: 3 MT Per Day 27.00 686.00
Start Quartz Slabs Manufa... 250 Nos. per day 27.00 3200.00
Project Profile on Sodium... 4500 MT Per Annum 27.00 214.00
Rice Husk based Biodegrad... Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day 27.00 222.00
Lithium Ion Battery LiFeP... Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day 29.00 970.00
Ferric Pyrophosphate Prod... 600 MT Per Annum 29.00 133.00
Set Up Production Unit of... 300 MT Per Annum 28.00 70.00
Start Production Business... 10 MT per day 45.00 1300.00
Production of Malic Acid ... 0 0.00 0.00
Ferric Pyrophosphate: Sta... 0 0.00 0.00
Flat Glass Manufacturing ... 4000 Sq.Mtrs. per day 24.00 18700.00
Start Production Business... Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day 28.00 20700000.00
12345678910...

Showing 661 - 720 of 2703 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR