• 0

Project Consultancy, Reports & Profiles

What are the Benefits of Starting a Business?

The dreams and passions of entrepreneurs often lead them to start their own businesses. Following your dreams will fulfil you in a way that working for someone else may not do. When you work for someone else, it can be hard to find the motivation to do your best work. Whatever you do, the owners of the company will reap the rewards. 

Starting up a business and using it for social benefit is one of the most fulfilling things about being an entrepreneur. Using your profits, you can choose to donate to nonprofits, charities, or community initiatives. 

Your ultimate goal as an entrepreneur is to cultivate financial independence. There is no limit to how lucrative your own business can be if you work hard and remain focused. There’s no reason why you cannot achieve your goal of building wealth. 

Why Start a Business in Assam? 


The Largest Economy in the North-East; 

Assam is the largest economy in North East India and is rapidly establishing itself as an employer of people and an inclusive growth engine through a balanced pattern of industrial investment.  

There is a great deal of emphasis by the Central and State Governments on creating an investment-friendly environment in North East India, and subsidies and incentives are offered to attract investors. The Union Development Budget includes 10% for North East India. 


Ease of Doing Business in Assam; 

Investment-friendly business climates are characterised by ease of doing business. Assam has undertaken the “Ease of Doing Business” reforms that have been prescribed by the Finance Ministry, along with Haryana, Himachal Pradesh, and Punjab. As a result, these states are now eligible to mobilise additional financial resources and have been given permission to borrow an additional Rs 5,034 crore through Open Market Borrowings. There is a very friendly climate for starting any business in Assam. 


Natural Resources in Assam;

India's tea production is dominated by Assam. The state produces 15 per cent of India’s crude oil from the wells at Digboi, Duliajan, and Sivasagar. 

In terms of natural gas production, it accounts for about half of India’s total onshore production. 

Several natural resources, including oil, natural gas, minerals, hydro energy, forest resources, and medicinal plants, make this region an ideal investment destination.

Nearly 50% of India’s tea production originates from the state, also home to numerous tea and food processing parks. Guwahati Tea Auction Centre (GTAC) is one of the world’s largest CTC tea auction centres. 

Natural gas and crude oil reserve located in Digboi, Assam, is India’s oldest operating refinery. The proximity of Assam to Southeast Asia provides the region with an advantage geographically. As a result of its existing and ongoing infrastructure initiatives, it is the best place for starting a business aiming at ASEAN markets. 


Locational Advantage; 

Assam is the gateway to the North-Eastern states, making it ideally situated to serve their needs and markets. 

Due to its geographical location, it enjoys favourable trade relations with neighbouring countries such as Bhutan, Bangladesh, Nepal, Myanmar, Thailand, China, etc. 

There is an excellent opportunity to tap into large markets in mainland India, South and Southeast Asia, ASEAN, SAARC, as well as the fastest-growing economies in the world. 

Due to its proximity to SAARC countries Bhutan, Nepal and Bangladesh, it offers international trade opportunities to foreign investors. 


Manpower Availability in Assam; 

Assam has a large number of English-speaking, skilled, semi-skilled, educated workers at a very low cost and a competitive rate. 


Roadways in Assam; 

In Assam, the total length of roads is approximately 69,000 km, including metalled and non-metallic surfaces. It makes up approximately 60% of the entire road network in the northeast. The major towns within the state are all connected by major highways.

 

Railways in Assam; 

The total length of the route is approximately 2435.13 km. The railway network in Assam is convenient and connects the state with the rest of India. Rail connections are good to several major towns in Assam, such as Dibrugarh, Tinsukia, Jorhat, Nagaon, Guwahati, Tezpur, Barpeta, Bongaigaon, etc.


Airways in Assam; 

Lokapriya Gopinath Bordoloi International Airport in Guwahati is 18 km from the city centre and has good connections with New Delhi, Kolkata, Mumbai, and Chennai.

Regular flights to and from Guwahati are operated. 


Inland Water Transportation;

The Brahmaputra is the country’s second national waterway. A commercial water transportation service is provided on the river Brahmaputra and Barak by two government-owned companies (Central Inland Waterways Corporation and the Directorate of Inland Waterways, Assam). Both passengers and goods are transported using these services. 

Waterways in Assam link it to Bangladesh, providing access to Chittagong, and also to Kolkata and Haldia (West Bengal, India). 


How to Start a Business in Assam? 


Discover Business Opportunities; 

Before starting a business venture, entrepreneurs should prepare a business plan. You should consult with an accountant and project consulting agencies before you make any final decisions. What kind of business you have is the most important factor. 

 

An Analysis of the Market;

To understand the feasibility of an enterprise, it is important to conduct a market study. The market study assists in better understanding the prevailing competition, existing market gaps, consumer needs and preferences, etc. 

 

Organization type selection; 

One needs to choose the form of Business Enterprise that he/she will set up. An entrepreneur’s right choice determines his or her control, power, risk, and responsibility, as well as how the profits and losses will be divided. There are various factors to consider, including the scale of operations, degree of control, capital, volumes of risk and liability, tax liability, etc.

 

There are several types of business organisations, including: 

     Sole Proprietorship

     Firm in partnership

     Co-operatives

     Public & Private Limited Company

     Societies

     Limited Liability Partnership

Business Name & Registration; 

To start any business in Assam, it must be named and registered with the appropriate authorities. 

 

Product Selection;

The following factors can be considered when selecting a product to be manufactured by the firm:- 

     Analyse product market size and structure

     Analysing the future demand

     Graphing the product life cycle

     Knowing each product’s shelf life

     Easy access to raw materials

     Production technology

 

Decide on a Location;

The success or failure of a business is largely determined by its location. An organisation’s future expansion plans, in addition to its present requirements, should be considered when making this decision.

 

Important factors to consider while selecting a location for starting a business in Assam; 

     Raw material availability

     Availability of skilled, semi-skilled, or unskilled labour

     Market proximity

     Transportation facilities

     A reliable supply of power and fuel

     Product-specific climate factors

     Competitive and complementary industries exist

 

Planning and arranging Project Funding;

For a business to begin, continue, expand, and grow, it needs finance. Hence, a financial plan must be prepared, which identifies the need for funding, the sources of funding, and how these funds will be used.

 

AD_20Art21


Reasons for buying our reports:

This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

This report provides vital information on the product like its characteristics and segmentation

This report helps you market and place the product correctly by identifying the target customer group of the product 

This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

The report provides a glimpse of government regulations applicable on the industry

The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

We use reliable sources of information and databases. And information from such sources is processed by us and included in the report


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Setup Plant Of Lead From Galena
Setup Plant Of Lead From Galena

Lead is a heavy metal that is commonly found in the earth's crust. Its abundance, low... Read More

Capacity :
Lead Ingot 30 MT Per Day
Plant and Machinery cost:
487.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
2231.00Lakhs
Add To Inquiry Basket
A Business Plan Blood Collection Tubes, Urine and Stool Containers
A Business Plan Blood Collection Tubes, Urine and Stool Containers


Read More

Capacity :
-
Plant and Machinery cost:
1214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2294.00Lakhs
Add To Inquiry Basket
A Business Plan for Paracetamol
A Business Plan for Paracetamol

Paracetamol is a popular over-the-counter pain reliever and f... Read More

Capacity :
Paracetamol Powder 7 MT Per Day
Plant and Machinery cost:
274.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
779.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Of  Baby & Adult Diaper and Sanitary Napkins
Start Manufacturing Business Of Baby & Adult Diaper and Sanitary Napkins

Baby & Adult Diapers an... Read More

Capacity :
Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary
Plant and Machinery cost:
2356.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
4201.00Lakhs
Add To Inquiry Basket
Start Tissue Paper Manufacturing Business
Start Tissue Paper Manufacturing Business

Tissue paper is a lightweig... Read More

Capacity :
Tissue Paper 20 MT Per Day
Plant and Machinery cost:
497.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
2101.00Lakhs
Add To Inquiry Basket
Launching a  Solar Panel Production Business
Launching a Solar Panel Production Business

 

Solar panels are ... Read More

Capacity :
Solar Panel 500 MW per annum
Plant and Machinery cost:
810.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
5353.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business

Bagasse is the fibrous residue that remains after sugarcane o... Read More

Capacity :
-
Plant and Machinery cost:
1941.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2774.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Plant
Setup Curcumin Extraction Plant

Curcumin extraction refers to the process of isolating and ex... Read More

Capacity :
Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs
Plant and Machinery cost:
216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
491.00Lakhs
Add To Inquiry Basket
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit

 

Active Pharmaceut... Read More

Capacity :
Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs
Plant and Machinery cost:
1111.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
5246.00Lakhs
Add To Inquiry Basket
PSA Oxygen Plant
PSA Oxygen Plant

 

PSA p... Read More

Capacity :
30 to 36 cylinders per day
Plant and Machinery cost:
45.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
PSA Oxygen Gas Plant
PSA Oxygen Gas Plant

PSA plants take... Read More

Capacity :
180 to 200 cylinders per day
Plant and Machinery cost:
99.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor

 

The double-edged ... Read More

Capacity :
Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500
Plant and Machinery cost:
467.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.51%
Break Even Point (BEP):
43.43 %
TCI :
0.00 Lakhs
Cost of Project :
2285.00Lakhs
Add To Inquiry Basket
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings

 

Casting Read More

Capacity :
12 MT per Day
Plant and Machinery cost:
311.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.83%
Break Even Point (BEP):
55.20 %
TCI :
0.00 Lakhs
Cost of Project :
1135.00Lakhs
Add To Inquiry Basket
Business of Disposable Safety Razors
Business of Disposable Safety Razors

 

The double-edged ... Read More

Capacity :
Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da
Plant and Machinery cost:
393.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
57.75%
Break Even Point (BEP):
28.02 %
TCI :
0.00 Lakhs
Cost of Project :
815.00Lakhs
Add To Inquiry Basket
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings

Pipe fittings, also known a... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Extraction of Essential Oil from Lemon Grass
Extraction of Essential Oil from Lemon Grass

Oil of lemongrass is one of the most important essential Oils. Large quantities are used for the extraction of citr... Read More

Capacity :
Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.60%
Break Even Point (BEP):
69.69 %
TCI :
0.00 Lakhs
Cost of Project :
607.00Lakhs
Add To Inquiry Basket
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant

 

Bicarbonate Cartri... Read More

Capacity :
Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co
Plant and Machinery cost:
53.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.28%
Break Even Point (BEP):
35.25 %
TCI :
0.00 Lakhs
Cost of Project :
1153.00Lakhs
Add To Inquiry Basket
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit

 

Methylated spirits... Read More

Capacity :
Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S
Plant and Machinery cost:
79.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.53%
Break Even Point (BEP):
54.72 %
TCI :
0.00 Lakhs
Cost of Project :
265.00Lakhs
Add To Inquiry Basket
Manufacturing of Rubber Powder from Waste Tyres
Manufacturing of Rubber Powder from Waste Tyres

 

Rubber is polymer ... Read More

Capacity :
Rubber Powder 5.0 MT per day By Product Steel Wire 1.4 MT per day
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.98%
Break Even Point (BEP):
61.44 %
TCI :
0.00 Lakhs
Cost of Project :
191.00Lakhs
Add To Inquiry Basket
Start extraction of Cashew Nut Shell Oil and Cardanol
Start extraction of Cashew Nut Shell Oil and Cardanol

 

Cashew (Botanical ... Read More

Capacity :
Cashew Nut Shell Oil 11.0 MT per day Cardanol 5.5 MT per day De-Oiled Cashew Nut Shell Cake (bye Pro
Plant and Machinery cost:
323.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.72%
Break Even Point (BEP):
52.53 %
TCI :
0.00 Lakhs
Cost of Project :
752.00Lakhs
Add To Inquiry Basket
Setup a Manufacturing Plant of  Disposable Plastic Syringes with Needles
Setup a Manufacturing Plant of Disposable Plastic Syringes with Needles

 

Disposable Syringes are made of plas... Read More

Capacity :
Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D
Plant and Machinery cost:
524.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.78%
Break Even Point (BEP):
35.60 %
TCI :
0.00 Lakhs
Cost of Project :
345.00Lakhs
Add To Inquiry Basket
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry

 

Disposable safety razors have a design that is very s... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant

Ethanol is a colourless, pu... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Magnesium Stearate
Magnesium Stearate

 

Magnesium stearat... Read More

Capacity :
Magnesium Stearate 10.0 MT Per Day
Plant and Machinery cost:
301.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
515.00Lakhs
Add To Inquiry Basket
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea

Bromelain is a combination ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Ferrochrome Manufacturing Business
Ferrochrome Manufacturing Business

 

Ferrochrome is an alloy that combines chromium wit... Read More

Capacity :
Ferrochrome 135 MT Per Day
Plant and Machinery cost:
26900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
10.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
40400.00Lakhs
Add To Inquiry Basket
Start a Business Of LPG Cylinders
Start a Business Of LPG Cylinders

LPG cylinders are pressurized containers and transport lique... Read More

Capacity :
LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day
Plant and Machinery cost:
911.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
3475.00Lakhs
Add To Inquiry Basket
Start Banana Wine Production Business
Start Banana Wine Production Business

Wine has been popular for centuries, and this fermented beve... Read More

Capacity :
Banana Wine (750 ml size Bollte) 2,960 Bottles per day
Plant and Machinery cost:
530.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1189.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Set Up Activated Carbon From Rice Husk, Saw Dust & Coconut Shell Manufacturing Business Plan
Set Up Activated Carbon From Rice Husk, Saw Dust & Coconut Shell Manufacturing Business Plan

Activated carbon is a type of carbon that has been treated w... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Set Up Business of Flat Glass Manufacturing Most Profitable Idea for Flat Glass Production Business
Set Up Business of Flat Glass Manufacturing Most Profitable Idea for Flat Glass Production Business

A flat glass Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set Up Business of Double Wall Corrugated Pipes Manufacturing Most Profitable Idea for Double Wall Corrugated Pipes Manufacturing Business
Set Up Business of Double Wall Corrugated Pipes Manufacturing Most Profitable Idea for Double Wall Corrugated Pipes Manufacturing Business

A type of pipe utilized in numerous applications is Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Bio-Degradable Plastic Polymer from Corn
A Business Plan for Bio-Degradable Plastic Polymer from Corn

Corn is a popular source for materials that can be recycled into bio-degradable plast... Read More

Capacity :
10,000 MT Per Annum
Plant and Machinery cost:
6058.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
8100.00Lakhs
Add To Inquiry Basket
Sulphur Powder Manufacturing Business
Sulphur Powder Manufacturing Business

 

Sulphur powder, o... Read More

Capacity :
20,000 MT Per Annum
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
4318.00Lakhs
Add To Inquiry Basket
Manufacturing Business Ginger Oil & Ginger Powder
Manufacturing Business Ginger Oil & Ginger Powder

 

Ginger oil, also ... Read More

Capacity :
60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum
Plant and Machinery cost:
381.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
528.00Lakhs
Add To Inquiry Basket
Start a Business of Manufacturing Steel Epoxy Putty Stick
Start a Business of Manufacturing Steel Epoxy Putty Stick

In the 1960s, MIT researche... Read More

Capacity :
1,500 Dz. Per Annum
Plant and Machinery cost:
2.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
35.00 %
TCI :
0.00 Lakhs
Cost of Project :
34.00Lakhs
Add To Inquiry Basket
Start Activated Carbon from Rice Husk, Saw Dust & Coconut Shell Processing Business Profitable & Potential Business Idea of Activated Carbon from Rice Husk, Saw Dust & Coconut Shell
Start Activated Carbon from Rice Husk, Saw Dust & Coconut Shell Processing Business Profitable & Potential Business Idea of Activated Carbon from Rice Husk, Saw Dust & Coconut Shell

Popular air purifiers conta... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Most Demandable Business Idea for Mini Steel Plant (Billets and TMT Bar) Start Production of Steel Billets and TMT Bar
Most Demandable Business Idea for Mini Steel Plant (Billets and TMT Bar) Start Production of Steel Billets and TMT Bar

One of the most widely used metals in the world, Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Cumin, Turmeric, Chilly & Coriander Trading or Exporter
Cumin, Turmeric, Chilly & Coriander Trading or Exporter

In the food industry, Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Wire Nails
Start Production Of Wire Nails

 

Wire nails are a ... Read More

Capacity :
Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum
Plant and Machinery cost:
939.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
Auto Brake Pad  and  Auto Brake Shoe Production Business
Auto Brake Pad and Auto Brake Shoe Production Business

 

Auto Brake Pads a... Read More

Capacity :
Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum
Plant and Machinery cost:
279.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1422.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Double and Single Wall Vacuum Steel Bottles
Business Plan for Production of Double and Single Wall Vacuum Steel Bottles

 

Double-wall vacuu... Read More

Capacity :
Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0
Plant and Machinery cost:
963.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1619.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferric Pyrophosphate
A Business Plan for Ferric Pyrophosphate

 

Ferric pyrophosph... Read More

Capacity :
Ferric Pyrophosphate 600 MT Per Annum
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
133.00Lakhs
Add To Inquiry Basket
How to Start A Business of Auto Piston
How to Start A Business of Auto Piston

An Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Seaworthy Containers
A Business Plan for Seaworthy Containers

Seaworthy containers are a new type of shipping container that have been designed to withstand the condit... Read More

Capacity :
Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum
Plant and Machinery cost:
907.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
2040.00Lakhs
Add To Inquiry Basket
Setup Extraction of Salt  From Sea Water  Plant
Setup Extraction of Salt From Sea Water Plant

 

Extraction of salt from sea water is a process by which salt is removed from the seawater. Salt... Read More

Capacity :
Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum
Plant and Machinery cost:
1156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
2776.00Lakhs
Add To Inquiry Basket
A business Plan For Surgical Sutures (Assembling)
A business Plan For Surgical Sutures (Assembling)

 

Surgical sutures are a vital part of the medical industry and are used in numerous medical proc... Read More

Capacity :
Surgical Sutures: 450,000 Boxes per annum
Plant and Machinery cost:
169.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
877.00Lakhs
Add To Inquiry Basket
Starting up production of  Glycerol Monostearate
Starting up production of Glycerol Monostearate

Glycerol monostearate is an organic compound that is derived from glycerol and used as an emulsifier, thi... Read More

Capacity :
Glycerol Monostearate: 900 MT Per Annum
Plant and Machinery cost:
93.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
320.00Lakhs
Add To Inquiry Basket
Now Is The Time To Take Control Of Your Future And Start A Business
Now Is The Time To Take Control Of Your Future And Start A Business

 

Starting a busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Potato Chips And  Extruded Snack Food  (Kurkure Type)
Start Production of Potato Chips And Extruded Snack Food (Kurkure Type)

Potato Chips a... Read More

Capacity :
Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
121.00Lakhs
Add To Inquiry Basket
Setup Cashew Nut Processing Plant
Setup Cashew Nut Processing Plant

Cashew nut pro... Read More

Capacity :
Cashew Nut Processing: 4,794 Kgs Per Day
Plant and Machinery cost:
600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Start a Business of Particle Board  From Rice Husk
Start a Business of Particle Board From Rice Husk

Particle board, also known ... Read More

Capacity :
Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum
Plant and Machinery cost:
200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
A Business Plan for Wood Plastic Composite (WPC)
A Business Plan for Wood Plastic Composite (WPC)

 

Wood... Read More

Capacity :
Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum
Plant and Machinery cost:
406.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
790.00Lakhs
Add To Inquiry Basket
Start a Production Of Soda Ash  By Solvay Process
Start a Production Of Soda Ash By Solvay Process

Soda ash, or sodium carbonate, is a white, powdery chemical commonly used in the prod... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum
Plant and Machinery cost:
105000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1265.00Lakhs
Add To Inquiry Basket
Setup Plant OF Hot Dip Galvanizing
Setup Plant OF Hot Dip Galvanizing

 

Hot ... Read More

Capacity :
All Types of MS Structure 120 MT per day
Plant and Machinery cost:
619.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
2647.00Lakhs
Add To Inquiry Basket
A Business Plan for Potato Powder, Starch & Flakes
A Business Plan for Potato Powder, Starch & Flakes

Potato Powder, Starch & Flakes are a range of products derived from the tuber of ... Read More

Capacity :
-
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Business of Lithium Ion Battery (Battery Assembly)
Start a Business of Lithium Ion Battery (Battery Assembly)

A lithium-ion or Li-ion battery is a type of rec... Read More

Capacity :
Lithium-Ion Battery 60,000 Nos per Annum
Plant and Machinery cost:
172.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
812.00Lakhs
Add To Inquiry Basket
Best Industry Business Plan Is Zeolite 4a! (Detergent Grade)
Best Industry Business Plan Is Zeolite 4a! (Detergent Grade)

The Product:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Startup Most Growing and Demanding industry Business plant of Fiberglass Transparent LPG Cylinders
Startup Most Growing and Demanding industry Business plant of Fiberglass Transparent LPG Cylinders

Product: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Start Manufacturing of PP... PP Woven Fabric 12 MT per day 27.00 1637.00
Business Opportunities in... Dicyandiamide (DCDA) 5 MT Per Day 29.00 270.00
Emerging Business of Shri... Shrimp Processing (per Pack 1 Kg Size) 19,500 Kgs Per Day 30.00 1465.00
Investment Opportunities ... IV Fluids (500 ml Size Bottle) 50,000 Bottles per day 20.00 4089.00
Start Business of A-2 Cow... A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P 25.00 484.00
Start Production of Para... Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day 32.00 2887.00
Industrial and Pharmaceut... Industrial Grade Starch 37.5 MT Per Day Pharmaceutical Grade Starch 12.5 MT Per Day 28.00 1255.00
Production of Copper Wir... Copper Wire (0.914 to 0.376 mm) 350 Kgs per day Enamelled Copper Wire (0.914 to 0.376 mm) 350 Kgs pe 28.00 1233.00
Profitable Industry of Ba... Bamboo Sticks 4 MT Per Day 26.00 791.00
Profit Making Manufacturi... 0 0.00 0.00
Start Lucrative Manufactu... 0 0.00 0.00
Production Business of Ec... 0 0.00 0.00
Profitable Business Indus... 5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1 26.00 3949.00
12345678910...

Showing 61 - 120 of 2746 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR